HomeMy WebLinkAboutPW CNT 12-08/CHG OR 2 DEPARTMENT OF PUBLIC WORKS
215 Church Avenue
P.O.Box 1130
Oshkosh,Wisconsin 54903-1130
Ph.(920)236-5065
Fax(920)236-5068 OJHKOIH
ON THE WATER
November 15, 2013
Chris Pulvermacher
RG Huston Company, Inc.
2561 Coffeytown Road
Cottage Grove, WI 53527
Re: Change Order No. 2 (Final)
Contract 12-08
Dear Chris:
Enclosed is an executed copy of Change Order No. 2 (Final) between the City of Oshkosh and RG
Huston Company, Inc. regarding the abovementioned project.
If you have any questions, please call our office at(920)236-5065.
Sincerely,
David C. Patek
Director of Public Works
DCP/tlt
Enclosure: Change Order No. 2
cc: Pam Ubrig, City Clerk(w/original)
Lynn Lorenson, City Attorney (w/copy)
Ralph Chipman, Finance Director(w/copy)
File (w/original)
I:1Engineering\12-08 James Road Area Detention Basin\Project_lnformation\Contract Info\Change Orders\12-08 Page 1 of 1
Executed CO 42 Letter I1-15-13.docx
TO: RG Huston Company, Inc. CHANGE ORDER#2
2561 Coffeytown Road DATED: November 4, 2013
Cottage Grove, WI 53527
FINAL
Your present contract with the City of Oshkosh, Contract No. 12-08, awarded October 23, 2012, is hereby
amended and changed as follows:
NET DECREASE TO: SECTION I - PAVING ($1,680.00)
NET DECREASE TO: SECTION II - STORM SEWER ($77,171.30)
NET DECREASE TO CONTRACT ($78,851.30)
Section I Section II
(Paving) (Storm) Totals
Bid Total $96,875.00 $2,401,506.00 $2,498,381.00
C.O. #1 $91,188.00 $254,079.85 $345,267.85
Prev.Contract Total $188,063.00 $2,655,585.85 $2,843,648.85
C.O. #2 ($1,680.00) ($77,171.30) ($78,851.30)
Contract Total $186,383.00 $2,578,414.55 $2,764,797.55
CITY OF OSHKOSH
BY:
- /ec›---- - ?c/-1-(4,4A
Recommended: City Manager
nz-2d Pe44._ Li 1 A• `T
Director of Public Works . ( Cit / le!
A proved and accepted:
1
Contractor
I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin,
under the within Change Order.
Comptroller
Approved as • form: r,
N At A i ' Sm.. ,) ,0-&1.--
�.a` City A orne
CONTRACT: 12-08 CHANGE ORDER#2 FINAL
SECTION I-PAVING
ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN
NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE
Traffic control,complete Lump 1 1 $1,600.00
1000 as specified Sum
Undercut and undercut
backfill,complete as Cubic 421 421 $28.00
1001 specified yards
Aggregate access road, Square 3,650 3,490 -160.00 $10.50 ($1,680.00)
1002 complete as specified Yards
Easement haul road, Square 23,000 23,000 $4.80
1003 complete as specified Yards
Temporary 6'chain link
fence,complete as Linear 450 450 $15.00
1004 specified Feet
Farm lane restoration, Square 4,000 4,000 $4.80
1005 complete as specified Yards
SECTION I-(BID ITEMS 1000-1005)-SUB-TOTALS $0.00 ($1,680.00)
NET DECREASE TO: SECTION I ($1,680.00)
SECTION II-STORM SEWER
ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN
NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE
Mobilization,complete as Lump 1 1 $60,350.00
2000 specified Sum
Strip and stockpile
topsoil,complete as Square 350,000 375,640 25,640.00 $0.38 $9,743.20
2002 specified Yards
Clear trees,complete as Lump 1 1 $1,200.00
2006 specified Sum
Clear shrubs,complete Lump 1 1 $1,200.00
2008 as specified Sum
Grub stumps,complete Lump 1 1 $1,200.00
2012 as specified Sum
General excavation, Lump 1 1 $642,027.00
2020 complete as specified Sum
Over excavation and
backfill for berm 40,379 40,379 $3.15
construction,complete as Cubic
2021 specified Yards
Berm construction, Lump 1 1 $67,115.00
2025 complete as specified Sum
Excavation,wetland
scrape,complete as Lump 1 1 $16,000.00
2026 specified Sum
Furnish and install 18"
corrugated steel pipe 24 20 -4.00 $47.00 ($188.00)
culvert,complete as Linear
2049 specified Feet
Furnish and install 18"
steel apron endwall, 1 1 $256.00
sloped section,complete
2305 as specified Each
Outlet control system, Lump 1 1 $159,000.00
2595 complete as specified Sum
Page 2 of 5
CONTRACT: 12-08 CHANGE ORDER#2 FINAL
ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN
NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE
Connect to existing storm
sewer,complete as 1 1 $850.00
2800 specified Each
Furnish, install,maintain,
and remove stone 2 2 $5,800.00
tracking pad,complete as
2862 specified Each
Furnish,install,maintain, 17,000 14,274 -2,726.00 $1.65 ($4,497.90)
and remove silt fence, Linear
2864 complete as specified Feet
Furnish, install,maintain, 300 161 -139.00 $8.00 ($1,112.00)
and remove stone bag,
2866 complete as specified Each
Furnish, install,maintain, 6 6 $250.00
and remove ditch check,
2872 complete as specified Each
Furnish, install,maintain,
and remove turbidity 1 0 -1.00 $2,500.00 ($2,500.00)
barrier,complete as
2876 specified Each
Install salvaged topsoil,
6"depth,complete as Square 350,000 375,640 25,640.00 $0.37 $9,486.80
2902 specified Yards
Furnish and install
wetland plugs,complete Square 4,300 0 -4,300.00 $10.00 ($43,000.00)
2908 as specified Yards
Furnish and install native 57,000 57,000 $0.42
seeding,floodplain mix, Square
2910 complete as specified Yards
Furnish and install native 115,000 131,540 16,540.00 $0.32 $5,292.80
seeding,mesic mix, Square
2912 complete as specified Yards
Furnish and install no-
mow fescue,complete as Square 73,000 73,000 $0.23
2922 specified Yards
Furnish and install annual
cover crop,complete as Square 400,000 261,540 -138,460.00 $0.07 ($9,692.20)
2924 specified Yards
Furnish and install trees, 14 14 $500.00
2926 complete as specified Each
Furnish and install trees,
bare root, complete as 500 0 -500.00 $200.00 ($100,000.00)
2927 specified Each
Furnish and install
shrubs,bare root, 1,200 0 -1,200.00 $25.00 ($30,000.00)
2929 complete as specified Each
Furnish and install Class
II,Type B erosion control 50,000 69,769 19,769.00 $1.40 $27,676.60
mat,complete as Square
2934 specified Yards
Furnish and install turf
reinforcement mat 650 650 $11.00
system,complete as Square
2938 specified Yards
Page 3 of 5
CONTRACT:12-08 CHANGE ORDER#2 FINAL
ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN
NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE
Furnish and install
reinforced grass 11,200 10,000 -1,200.00 $22.00 ($26,400.00)
pavement system, Square
2940 complete as specified Yards
Furnish and install
articulated concrete block 6,000 6,000 $75.80
mat revetment system, Square
2951 complete as specified Yards
SECTION II-(BID ITEMS 2000-2951)-SUB-TOTALS $52,199.40 ($217,390.10)
ADDITIONAL WORK REQUIRED: C.O.#1 - SECTION II
ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN
NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE
Mobilization—Additional
mobilization to accelerate Lump 1 1 $27,100.00
the fall schedule and Sum
20000 remobilization in spring
Strip and stockpile topsoil Square 350,000 375,640 25,640.00 $0.20 $5,128.00
20001 Yards
General Excavation—
accelerating to 60-hour Sump 1 1 $30,710.00
20002 work week
Berm Construction—
accelerating to 60-hour Sump 1 1 $3,096.00
20003 work week
Install salvaged topsoil, Square 350,000 375,640 25,640.00 $0.20 $5,128.00
20004 6"depth Yards
20005 Scarify frozen topsoil Hours 20 75 55.00 $212.00 $11,660.00
Page 4 of 5
CONTRACT: 12-08 CHANGE ORDER#2 FINAL
ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN
NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE
Undercut frost and Cubic
replace with compactable Yards 98 98 $5.00
20006 fill for berm construction - -
ADDITIONAL WORK:C.O.#1 -(ITEMS 20000-20006)-SUB-TOTAL $21,916.00 $0.00
ADDITIONAL WORK REQUIRED: C.O.#2 - SECTION II
ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN
NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE
Furnish and install Class
2930 I,Type A erosion control Square 0 20,618 20,618.00 $1.05 $21,648.90
mat,complete as Yards
specified
20007 Rip frozen topsoil w/D8 Hours 0 120 120.00 $220.00 $26,400.00
Dozer
20008 Professional Services Sump 0 1 1.00 ($19,088.00) ($19,088.00)
Overhead fee on deleted
20009 bid items 2908,2927,and Sump 0 1 1.00 $17,300.00 $17,300.00
2929
Additional Material
20010 Handling for top soil, Lump 0 1 1.00 $19,842.50 $19,842.50
berm and structure
ADDITIONAL WORK:C.O.#2 -(ITEMS 2930&20007-20010)-SUB-TOTAL $85,191.40 ($19,088.00)
NET DECREASE TO: SECTION II ($77,171.30)
NET INCREASE TO SECTIONS I,II $159,306.80
NET DECREASE TO SECTIONS I,II ($238,158.10)
NET DECREASE TO CONTRACT: ($78,851.30)
Page 5 of 5