HomeMy WebLinkAboutPW CNT 13-13/CHG OR 1 DEPARTMENT OF PUBLIC WORKS 215 Church Avenue P.O.Box 1130 Oshkosh,Wisconsin 54903-1130 Ph.(920)236-5065 Fax(920)236-5068 Of HKOJ H ON THE WATER November 15, 2013 Ms. Rebecca Woller Integrity Grading &Excavating, Inc. 605 Grossman Drive Schofield, WI 54476 Re: Change Order No. 1 Contract 13-13 Dear Ms. Woller: Enclosed is an executed copy of Change Order No. 1 between the City of Oshkosh and Integrity Grading &Excavating, Inc. regarding the abovementioned project. If you have any questions,please call our office at (920)236-5065. Sincerely, David C. Patek Director of Public Works DCP/tlt Enclosure: Change Order No. 1 cc: Pam Ubrig, City Clerk(w/original) Lynn Lorenson, City Attorney(w/copy) Ralph Chipman, Finance Director(w/copy) File (w/original) I:\Engineering113-13 Impacted Soil Exc,Transport,&Site Grading\Project_Information\Contract Info\Change Orders113- Page 1 of 1 13 Executed CO#1 Ltr 11-15-13.docx TO: Integrity Grading & Excavating, inc. CHANGE ORDER# 1 605 Grossman Drive DATED: October 7, 2013 Schofield, WI 54476 Your present contract with the City of Oshkosh, Contract 13-13, awarded April 9, 2013, is hereby amended and changed as follows: SECTION I -GENERAL $0.00 SECTION II -GENERAL SITE NET INCREASE TO: WORK $37,718.69 NET INCREASE TO CONTRACT $37,718.69 Section I Section II (General) (General Site Work) Totals Bid Total $4,500.00 $123,267.71 $127,767.71 C.O.#1 $0.00 $37,718.69 $37,718.69 Contract Total $4,500.00 $160,986.40 $1650486.40 CITY OF OSHKOSH BY: Recommended: City Manager Director of Public Works ' ► Cle 1 V Approved and accepted: Contractor 64tvi L q-, W6NK.4Ur I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. „ozi. O 1A,4-PA-Gt.../ Comptroller Approved as • m: City A to •_ Page 1 of 3 SECTION II-GENERAL SITE WORK CENTRAL GARAGE SITE ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT PRICE PRICE Excavation—Remove/ Transport to Valley Trail RDF in Berlin,Wisconsin contaminated soil and all B-1 misc debris generated TONS 5,500 3,387.42 -2,112.58 $7.91 ($16,710.51) during impacted soils removal(former UST area) at Central Garage, approximately 5,500 tons (tipping fees paid by owner) Backfill—Place/Compact crushed concrete at Central B-2A Garage excavation with CYDs 2,600 2,000.00 -600.00 $1.86 crushed concrete material ($1,116.00) stockpiled on site in accordance with the Low Hazard Exemption Permit. Backfill—Load/Transport /Place/Compact crushed concrete from Clairville Road Stockpile in Central B 2B Garage excavation in CYDs 1,000 1,680.00 680.00 $13.35 $9,078.00 accordance with the Low Hazard Exemption Permit. (Unit Rate only used in event of onsite material shortage) Section II:Central Garage Site-(Bid Items B-1 -B-2B)-SUB-TOTALS $9,078.00 ($17,826.51) ADDITIONAL WORK REQUIRED: C.O.#1 - Section II : Central Garage Site ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT PRICE PRICE 1 Concrete Breaking Central LS 0.00 1.00 I 1.00 $3,000.00 $3,000.00 Garage Section II: Central Garage Site- Additional Work-C.O.#1 -(ITEM 1)-SUB-TOTAL $3,000.00 $0.00 NET DECREASE TO: SECTION II—Central Garage Site ($5,748.51) Page 2 of 3 KNAPP STREET QUARRY ITEM SID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE Excavation-Strip existing topsoil(approximate 1 foot C-3 thickness and stockpile on SF 70,000 43,000,00 -27,000.00 $0.12 ($3,240.00) site—Excavation area approximately 70,000 sq.ft. —June 1,2013 Backfill—Grade/Compact clay fill materials delivered C-4 by others,originating from CYDs 2,000 8,496.00 6,496.00 $4.45 $28,907.20 Oaklawn School property. 2,000 cubic yards—June —September 2013 Restoration-Restore Knapp Street Quarries with ' C-5 a minimum 1-foot thick SF 70,000 72,000.00 2,000.00 $0.26 $520.00 layer of topsoil and seed and ematt—September 2013 Section II:Knapp Street Quarry-(Bid items C3-CS)-SUB-TOTALS $29,427.20 ($3,240.00) ADDITIONAL WORK REQUIRED: C.O.#1 - Section II: Knapp Street Quarry ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 2 Import Topsoil Knapp CYDs 0.00 1,440.00 1,440.00 $12.00 $17,280.00 Street Quarries Section II: Knapp Street Quarry- Additional Work-C.O.#1-(ITEM 2)-SUB-TOTAL $17,280.00 $0.00 NET INCREASE TO: SECTION II--Knapp Street Quarry $43,467.20 NET INCREASE TO SECTION II $58,785.20 NET DECREASE TO SECTION II ($21,066.51) NET INCREASE TO CONTRACT: $37,718.69 Page 3 of 3