Loading...
HomeMy WebLinkAbout0158716-Building (shed) � CITY OF OSHKOSH No 158716 � OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD ON THE WATER Job Address 928 COZY LN __ Owner ALAN S/TIFFANY A LONG Create Date 11/11/2013 Designer Contractor OWNER Inspector John Zarate Category 151 -Residential New Shed Plan Type � Building � Sign 0 Canopy � Fence � Raze Zoning R-1 Class of Const: Size Unfinished/Basement Sq.Ft. Rooms _ Height Ft. ❑ Projection I Finished/Living Sq.Ft. Bedrooms Stories Canopies Garage 49 Sq.Ft. Baths Signs Foundation � Poured Concrete � Floating Slab � Pier � Other � Concrete Block � Post � Treated Wood __ Occupancy Permit _ __ Occupancy Fee __ $0.00 Flood Plain Height Permit Park Dedication #Dwelling Units 0 #Structures 0 Use/Nature ;SFR/7'x 7'shed*to be located in the side yard. The shed can not be located closer than 7'-6"to the side property line. of Work '' I HVAC Contractor _ _ _ Piumbing Contractor � Electric Contractor Fees: Valuation $400.00 Plan Approval _ $0.00 Permit Fee Paid $55.00 Park Dedication $0.00 Issued By: Date 11/11/2013 Final/O.P. 00/00/0000 ❑ Permit Voided' Parcel Id# 1519627500 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement holder(s)and to secure any necessary approvals before starting such activity. I have read and understand the afore mentioned information. Signature Date AgenUOwner , Address _ Oshkosh WI 54901 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specifed otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.