HomeMy WebLinkAbout0158650-Building � CITY OF OSHKOSH No 158650
�
OSHKOSH COMMERCIAL BUILDING PERMIT -APPLICATION AND RECORD
ON THE WATER
Job Address 3321 COUNTY RD A Create Date 11/05/2013
Project Building Addition and Alteration ___ ___ _ __ Project Number 20130652
Owner NONWEILER INVESTMENTS LLC Plan 6B2-3912-1013
Contractor CR MEYER
Inspector John Zarate
Designer
Category 210-Addition Industrial ___ Type of Plan Alt. Level 2
Zoning M-3 Square Footage
Major Occ H3-Hazardous Const Class Type IIB
Fire Protection � Sprinkled � Unsprinkled � Sprinkler Design NFPA 13
Occupancy Permit Flood Plain Height Permit
Park Dedication #Dwelling Units 0 #Structures 0
� Projection ' Canopies Signs
Use/Nature
of Work
IND/16,100 sq.ft.addition*and alteration to existing buildings. A fire sprinkler system will be installed as welL '
I
'
HVAC Contractor Plumbing Contractor
Electric Contractor
Fees: Valuation $1,100,000.00 Plan Approval $0.00 Permit Fee Paid $2,898.00 Park Dedication $0.00
Issued By: Date 11/O6/2013 Final/O.P. 00/00/0000
❑ PermitVoided Parcelld# 1519607400
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party,if you perform the work
described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement
holder(s)and to secure any necessary approvals before starting such activity.
I have read and under ta t en ioned in ormation. � �
Signature -�'�� Date �
V AgenUOwner
Address 895 W 20TH AVE OSHKOSH WI 54902 - 6766 Telephone Number 235-3350
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of
Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone
Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.