HomeMy WebLinkAboutMiron Construction/CHG OR G-3/City Centre • CHANGE Distribution to: ORDER OWNER ARCHITECT AlA DOCUMENT G701 CONTRACTOR ❑ FIELD ❑ OTHER ❑ PROJECT: Oshkosh Centre CHANGE ORDER NUMBER: G-3 (name, address) Oshkosh, Wisconsin INITIATION DATE: May 23, 1985 TO (Contractor): I- --I ARCHITECT'S PROJECT NO: 1383 P.G. Miron Construction Co. , Inc CONTRACT FOR: General Construction Work - 806 Valley Road Entire Project Menasha, WI 54952 JCONTRACT DATE: December 20, 1984 You are directed to make the following changes in this Contract: 1. Change vegetable preparation sink drain from a wall outlet to discharging into a floor sink. Request made by Food Service Consultant - Contract Ser .e Associates. Add $288.46 (7;41' � IQ St 1 , 1. \ _.' I &. (Proposal Attached) City Comptroller Not valid until signed by both the Owner and Architect. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. The original (Contract Sum) (9yatpty0)(46)41Wyt b1aAya5 $ 3,675,000.00 Net change by previously authorized Change Orders $ (522,446.93) The (Contract Sum) (IE;62( :444/iv(aSxfrAZ dsssf) prior to this Change Order was $ 3,152,553.07 The (Contract Sum) ( 44(We fl/NIL eIr i- �a(ait)'will be (increased) (dciafe(a/sAdyOZlia d)/ 288,46 by this Change Order $ The new (Contract Sum) ( ,t'iMArEO fyfO'rAdy44,79's ) including this Change Order will be $ 3,152,841.53 . The Contract Time will be (j-i„tfe,$ '/(0gf¢atO (unchanged) by ( 0 ) Days. The Date of Substantial Completion as of the date of this Change Order therefore is unchanged . Authorized: Reinke, Hansche, Last, Inc. P.G. Miron Construction Co. The City of Oshkosh ARCHITECT CONTRACTOR OWNER 8n5 m Main ct 8.06 Valley 2oad 215 Church Street Address Address Address Oshkosh, WI 54901�/J Menasha, WI 54952 Oshkosh, I 54901 BY / . at'l (L9// BY E ( ;i �1 —gY �° ,r..nal r1 DATE �7�7�BJ- DATE _ - , � - And:. ,, �-ti?1t ' ,,, o'ft. Se , i y er: AIA DOCUMENT G701 • CHANGE ORDER • APRIL 1978 EDITION • AIA® • © 1978 Dated' 6/7/85 THE AMERICAN INSTITUTE OF ARCHITECTS,1735 NEW YORK AVE., N.W.,WASHINGTON, D.C. 20006 G701 —1978 APR 2 f 1985 Telephone 1414)734-4161 P. G . MIRON CONSTRUCTION CO . , INC. CONTRACTORS • CONSTRUCTION MANAGERS • MACHINE ERECTORS • DESIGN SERVICES P.O. Box 962 Appleton,WI 54912 April 24, 1985 Reinke, Hansche, Last, Inc. 805 N. Main Street Oshkosh, Wisconsin 54901 RE: OSHKOSH CENTRE Gentlemen.: Enclosed is a proposal submitted by Drucks Plumbing, pertaining to the changing of the vegetable preparation sink drain from a wall outlet to discharging into an added floor sink, as requested by the architect. A breakdown of the costs is as follows: Drucks Plumbing $250.84 P. G. Mixon Management Fee 37.62 TOTAL ---------------------- $288.46 Please review the above information and issue a change order at your earliest convenience. Should you have any questions please call. Sincerely, P. G. MIRON CONSTRUCTION Greg Ki..- m President GK/kb enc. CHANGE ORDER SUMMARY �f DRUCKS 1. Project Oshknrh Center PLWJh 4iNG - HEATING - COOLING 2. Job No. 504 THIRD STREET MENASHA, WISCONSIN 54952 . 3. Change Order Requested By Architect MENASHA -722-2642 • 4. Change Order Request No. n P A H # 4 OSHKOSH -426-3695 5. Change Order Request Date 4 / 4 / R5 6. Date 4 / 15 / R5 7. Description of Work Change the vegetahle Oreparatinn cink drain, frnm a wall nutlet to diccharginn intn an added flnnr cink 8. TOTAL MATERIAL $ 131 _30 9. SALES TAX @ 5% $ 6.57 10. Foreman Hours @ = $ 11. Tradesman 1 Hours @ 22.53 = $ 22.53 12. Trainee Hours @ _ $ 13. Laborer Hours @ _ $ (Project ' 14. (Manager . 1 Hours @ 25_00 = $ 25.00 15. Travel Time, Subsistence $ 16. Truck Miles @ .30 = $ 17. TOTAL LABOR $ 47 53 18. TOTAL MATERIAL & LABOR COSTS $ 185.40 19. Overhead @ 23 % $ 42.64 20. CHANGE ORDER SUBTOTAL COST $ 228.04 21. Profit @ 10 $ $ 22,80 * 22. TOTAL COST DRUCKS PLUMBING & HEATING CO. $ 250.84 • SUBCONTRACTS: 23. Subcontracts $ 24. $ 25. $ 26. $ 27. SUBTOTAL SUBCONTRACTS $ 28. DRUCKS Subcontract Handling Charge @ % $ *9c11 TfYPAL S[1RNINTRArT COSTS S MENT RENTAL: • $ 31. $ 32. $ 33. $ 34. $ *35. TOTAL EQUIPMENT RENTAL $ NfNF *36. Special Insurance Costs $ NONF *37. Estimating Cost $ NONE *38. Permits & Fees $ NONE 39. TOTAL PRICE THIS CHANGE $ 250.84 40. Cost if this Change Order is not accepted $ 41. This proposal may be withdrawn by us if not accepted within days 42. Time Extension required, days. 43. Submitted By 44. Date 45. Approved By 46. Date STANDARD QUALIFICATION PARAGRAPHS This quotation is based on working an eight-hour day and covers the structural change in our work only. The above price is based upon performing proposed work included in the change order with a minimum impact on work originally bid and contracted for. Any subsequent changes in the construction schedule or additional change orders that will cause Drucks Plumbing & Heating Company to perform the work contained in this change order in a manner different than our change order estimate, will result in a constructive change to the contract, and additional compensation resulting in this constructive change will be requested when the amount of additional cost is known. The price quoted for work is based on the understanding that the work performed under this proposed change order will not delay the Owner's acceptance of work and commencement of warranty work being performed under the original contract and change orders executed to date. • DRUCKS LETTER OF TRANSMITTAL PLUMBING-HEATING- COOLING 504 THI^D STREET, MENASHA, WISCONSIN 54952 MENASHA- 722-2642 OSHKOSH -426-3695 -- — --- DATE ,,I Quotation No TO P. G IRO,v CO'vf ?.�. Attention A-1 A ] l Project Name GENTLEMEN: Purchase Order WE ARE SENDING YOU: Attached ❑ Under separate cover via -.. separate -- _________________ the following items: ❑ Shop drawing ❑ Prints ❑ Plans ❑ Samples ❑ Specifications ❑ Copy of Letter Submittal! ❑ Operation & Maintenance Manuals 'Other'(specify) 1). '1 Y t. 1 • • 44 COPIES FORM NO. DESCRIPTION • THESE ARE TRANSMITTED as checked: For approval ❑ For your use ❑ As requested ❑ Approved as noted ❑ Approved as submitted ❑ Returned for corrections ❑ Resubmitted as requested ❑ Return _ corrected prints ❑ Return approved . REMARKS _r.,, .. ,-� f �r r , . , . . COPY TO SIGNED i .�� l l� �,: -. %+ •��---- FOLLOW-UP DATE