Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Miron Construction Co/Chg Or G-2
arcech, , it is REINKE • HANSCHE • LAST • INC • �Y•VAVR/l ARCHITECTS ENGINEERS INC. 805 NORTH MAIN STREET • OSHKOSH, WISCONSIN 54901 • TELEPHONE 414 231-6950 April 24, 1985 Mr. William Frueh, City Manager City of Oshkosh 215 Church Avenue Oshkosh, WI 54901 RE: OSHKOSH CENTRE Dear Mr. Frueh: Enclosed are three (3) copies of Change Order No. G-2 for the Centre project. The items on this change order are the ones that were reviewed and discussed at the last committee meeting. Upon approval, please forward two (2) executed copies to our office for the files and distribution. Very truiy yours, ONALD D. HANSCHE RH/bf Encl. architects REINKE • HANSCHE • LAST • INC • rY-vwRA ARCHITECTS ENGINEERS INC 805 NORTH MAIN STREET • OSHKOSH, WISCONSIN 54901 • TELEPHONE 414 231-6950 April 19, 1985 APR 2 4 1985 Mr. Greg Kippenhan P. G. Miron Construction Co. , Inc. 806 Valley Road Menasha, WI 54952 RE: OSHKOSH CENTRE PROJECT NO. 1383 Dear Mr. Kippenhan: Enclosed for your review and signatures are three (3) copies of Change Order G-2. It will be presented to the Centre Advisory Committee the afternoon of Thursday, April 25. Please return all copies to this office before that date. Very truly yours, DAVID E. MALMGREN, A A DM/bf Encl. 4viewect 4- 5 4reci as regves-fed . PO. MAT-,-, CHANGE Distribution to: ORDER OWNER ❑ ARCHITECT ❑ AIA DOCUMENT G701 CONTRACTOR ❑ FIELD ❑ OTHER ❑ PROJECT: Oshkosh Centre CHANGE ORDER NUMBER: G-2 (name, address) Oshkosh, Wisconsin INITIATION DATE: April 19, 1985 TO (Contractor): � ARCHITECT'S PROJECT NO: 1383 P. G. Miron Construction Co., Iirc. 806 Valley Road CONTRACT FOR: General Construction Menasha, WI 54952 Work - Entire Project L J CONTRACT DATE: December 20, 1984 You are directed to make the following changes in this Contract: 1. Piling Changes Add $ 2,256.16 2. Benchmark Error Changed Add 12,843.15 3. Provide Handicap Access Showers Add 5,952.00 4. Skywalk Changes to Accomodate Hotel Design Add 1,595.00 5. Provide UDAG Sign Add 477.76 6. Delete WPS Charges for Relocation of Power Line Deduct 10,000.00 Total Change Order - Addition & Deduction - Add $13,124.07 (Proposals a . 41-.1 _ _ I he ,-,:by terfi,y ,h, t: the 7,t, e5sary prcui Inns - �� le,. . .:-, ... C. _ ia.n�;ly ,Y. Lei.. AY O dil-• �r �0 -,4 Gtt4 ,-, oau+.wla City Comptroller Not valid until signed by both the Owner and Architect. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. The original (Contract Sum) (Gtrafetrteec+Maxitfictn'-C-o was $ 3,675,000.00 • Net change by previously authorized Change Orders $ (535,571.00) • The (Contract Sum) (Frdawiteeel-Marx+mtirrr-C-es#) prior to this Change Order was $ 3,139,429.00 • The (Contract Sum) (€,traranteed-M ,irrru rrEest) will be (increased) (deceased)-(rancha]iged) by this Change Order $ 13,124.07 . The new (Contract Sum) (CAaaraaai d-1 ANi—Paraua-Gost) including this Change Order will be $ 3,152,553.07 . The Contract Time will be (i+ rea�ed3-(dec-reased) (unchanged) by ( 0 ) Days. The Date of Substantial Completion as of the date of this Change Order therefore is Unchanged Authorized: Reinke, Hansche, Last, Inc. �P..�G.RAMiioron Construction Co. vTyhhe City of Oshkosh 1305 Fvorth Main Street HUC�T \ialley Road O 21b Church Street Address Address Address Oshkosh, WI 54901 Me ha, WI 54952 Oshkosh, , 7I 54901 BY � BYc Gv-1 L P�1G�- BY_ — DATE / 4/9f DATE C�—J.( —kJ ' DATE -jam,-,� �- AIA DOCUMENT G701 • CHANGE ORDER • APRIL 1978 EDITION • AIA° • © 1978 kLik 6 jcY/w`l THE AMERICAN INSTITUTE OF ARCHITECTS,1735 NEW YORK AVE., N.W.,WASHINGTON, D.C. 20006 Wi APR 1 1 1955 im Telephone(414)734-4161 P. G . MIRON CONSTRUCTION CO . , INC. CONTRACTORS • CONSTRUCTION MANAGERS • MACHINE ERECTORS • DESIGN SERVICES P.O. Box 962 Appleton,WI 54912 April 9, 1985 Reinke, Hansche, Last, Inc. 805 N. Main Street Oshkosh, Wisconsin 54901 Attention: Mr. David Malmgren RE: OSHKOSH CENTRE Dear Sir: We are submitting to you revised breakdowns per our letter of 3/5/85. Piling Changes: 1) Change 3/4" cap to 5/8" cap. CREDIT OF $ 400.00 2) Sign piles. ADD OF $1,075.25 3) Six added piles due to obstructions. ADD OF $ 732.90 4) Delay charge due to obstructions. ADD OF $ 571 .73 5) Driving less footage than base bid. CREDIT OF $1,250.00 6) Removing obstructions below surface not shown on plans - Fett Excavating. ADD OF $1,232.00 $1,961.88 PLUS P. G. MIRON'S MANAGIIMCNr FEE 294.28 TOTAL PILING CHANGES $2,256.16 BENCHMARK CHANGES: 1) Increased thickness of pile caps. (54 yds @ 47.52) . $2,566.08 2) Increased concrete for pouring neat (50 yds @ 47.52) . $2,376.00 3) Labor to place 104 yards @ 19.10. $1,986.40 4) Labor to bring trenches up to correct height 2/7 x 1,846.17. $ . 527.48 5) Additional material and labor - Fett Excavating. $3,712.00 $11,167.96 PLUS P. G. MIRON'S MANAGEMENT FEE 1,675.19 TOTAL BENCHMARK CHANGES ---------=---- $12,843.15 April 9, 1985 RE: OSHKOSH CENTRE MDO PROJECT SIGN CHANGE: Pelles Johnson $ 366.45 Labor to install $ 49.00 415.45 PLUS P. G. MIRON'S MANAGEMENT FEE 62.31 TOTAL SIGN CHANGE $ 477.76 Should you have any questions please feel free to call. Sincerely, P. G. MIRON CONSTRUCTION Greg Kippenhan President GK/kb MAR 1 0 1985 nil Telephone (414)734-4161 P. G . MIRON CONSTRUCTION CO . , INC. CONTRACTORS • CONSTRUCTION MANAGERS • MACHINE ERECTORS • DESIGN SERVICES P.O. Box 962 Appleton,WI 54912 March 8, 1985 Reinke, Hansche, Last, Inc. 805 N. Main Street Oshkosh, Wisconsin 54901 Attention: Mr. Ron Hansche RE: OSHKOSH CENTRE Dear Ron: In following up on your letter dated 2/25/85, in regards to WPS charges, it seems the city has paid WPS direct for the relocation of the power lines. Mr. Jim McCabe of WPS has also informed me that there will not be any additional charges. The $10,000.00, added in Change Order G-1 can therefore, apparently, be eliminated. If you have any questions please feel free to call. Sincerely, P G. MIRON CON 1 UCTION . 4 ,,,,r Gregory Kippenhan President GK/kb MAR U 1985 Telephone(414)734-4161 P. G . MIRON CONSTRUCTION CO . , INC. CONTRACTORS • CONSTRUCTION MANAGERS • MACHINE ERECTORS • DESIGN SERVICES P.O. Box 962 Appleton, WI 54912 March 1, 1985 REINKE, HANSCHE, LAST INC. 805 North Main Street Oshkosh, Wisconsin 54901 Attn: Mr. David Ma7mgren RE: Oshkosh Centre Project No. 1383 Oshkosh, Wisconsin Dear Sir: As requested by your letter dated January 16, 1985, we are offering the following for your consideration: 1. Revise showers - Rooms No. 154 and 157 to provide handicap access - add sum of: $5,952.00 The breakdown is as follows: Add partition door width $ 52.00 Add ceramic tile 300.00 Add plumbing and shower stalls 4,936.00 Deduct laminated seats (50.00) Deduct toilet room accessories (62.00) $5,176.00 P. G. Miron Management Fee 776.00 $5,952.00 March 1, 1985 REINKE, HANSCHE, LAST INC. Page II 2. Revise ramp length and safety glazing at skywalk- Add $1,595.00: The breakdown is as follows: Add additional railing $ 735.00 Add additional erection 180.00 Add safety glazing 472.00 $1,387.00 P. G. Miron Management Fee 208.00 $1,595.00 These proposals are sealed for 30 days. Please inform us of your decision. Thank you Sincerely, P. G. MIRON CONSTRUCTION COMPANY, INC. 1 1i Greg Ki �J pPanh President GK/cl