Loading...
HomeMy WebLinkAbout0158431-Plumbing (sanitary & water laterals) � CITY OF OSHKOSH No 158431 OSHKOSH PLUMBING PERMIT -APPLICATION AND RECORD ON THE WATER Job Address 3300 CASEY TRL _ Owner CASEY'S MEADOW LLC Create Date 10/24/2013 Contractor WALTER R SCHMID JR _ Category 401 -Residential-E�erior(laterals) Plan Inspector Jon Mueller Bathtub __0 Clothes Wshr 0 Ciassrm Sink 0 Surgeons Sink 0 Roof Drain 0 Deduct Meters 0 Shower 0 Lndry Tray 0 Exam Sink 0 Steriiizer 0 Soda Disp 0 Wtr Sewer Mtrs 0 Whirlpool 0 Sump Pump 0 F Prep Sink 0 RPZ Valve 0 Coffee Maker 0 Wtr Usage Mtrs 0 Lavatory 0 San Sump/Pump 0 FldWst Sink 0 Bidet 0 Site Drain 0 Misc. p Toilet 0 Water Softner 0 Hand Sink 0 Urinal 0 Wait.St. � Fixtures . Kit Sink _ 0 Standp Rec 0 Lab Sink 0 Beer Tap 0 Ice Chest 0 Disposal 0 Gar Drain 0 Plaster Sink 0 Dip Weil 0 Comm Ice Maker 0 Dishwasher 0 Local Waste 0 Sculry Sink 0 Drink Ftn 0 Int Grease Trap 0 Floor Drain 0 Bar Sink 0 Serv Sink 0 Wash Ftn 0 Ext Grease Trap 0 Hose Bibb 0 Breakrm Sink _ 0 Shamp Sink 0 Catch Basin 0 Eye Wash Statn 0 Water Heater 0 Use/Nature 'NSFR/sewer and water laterals for new home of Work "ck#8831" � _� Size Materiai Type # Conn.Type Sanitary Sewer 4" Plastic Lateral 1 New Storm Sewer Water Service 1" Plastic Lateral 1 New Parcel Id# 1329311049 Valuation $1,200.00 Plan Approval $0.00 Permit Fees __ $100.00 ❑ Permit Voided'i Issued By (��J1- Date 10/24/2013 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement holder(s)and to secure any nece ary approvals be re starting such activity. Signature �� � c Date �(�--c��— �� AgenUO ner Address 7821 SWISS RD Oshkosh WI 54902 -0000 Telephone Number 688-2496 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.