Loading...
HomeMy WebLinkAboutMiron Construction Chg Or G-5/Oshkosh Centre CHANGE Distribution to: ORDER OWNER •Pg"' ARCHITECT ❑ AM DOCUMENT G701 CONTRACTOR ❑ FIELD ❑ OTHER El PROJECT: Oshkosh Centre CHANGE ORDER NUMBER: G-5 (name, address) Oshkosh, WI INITIATION DATE: June 21, 1985 TO (Contractor): P. G. Miron Constr. Co. , In�C . ARCHITECT'S PROJECT NO: 1383 806 Valley Road CONTRACT FOR: General Project Work Menasha, WI 54952 Entire Project L i CONTRACT DATE:December 20, 1984 You are directed to make the following changes in this Co.nnt tract: Provide additional structural steel at opening for HVAC duct in precast concrete plank to the left of Line 21, between Lines 0 and Q. Ad- ditional beams required by structural engineer. Add $265. 65 APPROVED �,= Pravistc>t, 1 hereby c e f} ti�=l;f 7eHc1 ii: JUL O ., S, a= cru, A. Al. P1 A f `: r r CITY ALTO ,,, ' �_ ` '1 . _ Ili r ._.�-�` OSHKOSH,WISC L` - (Proposal Attached) City Comptroller Not valid until signed by both the Owner and Architect. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. The original (Contract Sum) (-Guaraateesf-MaxI.lTu4a1-Cost) was $ 3, 675, 000 . 00 • Net change by previously authorized Change Orders $ (521, 763 . 40) • The (Contract Sum) (GuaraFrteed-Macintu -C-Ost) prior to this Change Order was $ 3 , 153 , 236. 60 • The (Contract Sum) (Gtiafalateed-AAaximi+ a-Cast) will be (increased) (d (eased)-(t thaflged) 265. 65 by this Change Order $ • The new (Contract Sum}-(Ctlara4a4eed-Maxipa4al-es4) including this Change Order will be $ 3, 153, 502. 25 • The Contract Time will be (inereasee})-{ckereased) (unchanged) by ( 0 ) Days. The Date of Substantial Completion as of the date of this Change Order therefore is Unchanged • Authorized: Reinke , Hansche, Last, Inc. P. G.Miron Constr. Co. The City of Oshkosh lTWorth Main Street CONTRA+bi. va lley Road o ER Church Street Address Address Address Oshkosh, WI 54901 Menasha , WI 54952 Oshkos ,, WI 4 901 BY /� r BY � �X'y c c BY W1 ! iam D F_ue, Cit nag DATE e7 a �J C:- And: 1 YI/LC � i G/ / DATE x8 Donna L. Serwas,City Cler AIA DOCUMENT G701 • CHANGE ORDER • APRIL 1978 EDITION • AIA® • © 1978 Date: /tS/85 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON, D.C. 20006 G701 —1978 Telephone (414)734-4161 IVIIP. G . MIRON CONSTRUCTION CO . , INC. CONTRACTORS • CONSTRUCTION MANAGERS • MACHINE ERECTORS • DESIGN SERVICES P.O. Box 962 Appleton,WI 54912 � ? ,r , June 17, 1985 .ti .4g! Reinke, Hansche, Last, Inc. 805 N. Main Street Oshkosh, Wisconsin 54901 RE: OSHKOSH CENTRE Gentlemen: Enclosed is an invoice from Appleton Structural Steel concerning the additonal beams required to the left of Line 21, between Q & Q, A breakdown of the costs is as follows: Appleton Structural Steel $231.00 +P. G. Miron's Management Fee 34.65 ,AL $265.65 Please issue a change order at your earliest convenience. Should you have any questions please feel free to call. Sincerely, P. G. MIRON CONSTRUCTION - r1 /1ir"6 Ki d Greg� PIe�an� President GK/kb enc. sovi To r. ,^ct_LctIon Cc . � ,.. 1\ppleion, Wisconsin 54012 'C."" ' PO BOX 326 Appleton.Wisconsin 54912 414-725-8515 • Invoice Date Invoice No INVOICE 31MAY85 33637 Cust.Order No Contract No. S4— 5530-X2 Shipped To PAY FROM INVOICE STATEMENTS ISSUED ON REQUEST CNIY Oshkosh Conte TERMS:Net Cash 10 Dc:'s—Ne Disccunt Via Quantity Description Amount 2 Additional Beams to the left • of Line 21, between 0 & Q • Complete 231. 00 We certify that the merchandise produced by the seller covered by this invoice were produced in compliance with all of the provisions of the Fair Standards Act of 1938 as amended. including Section 12. thereof, and in compliance with all regulations and orders of the Wage and Hour Administrator issued under Section 14 of said Act,as amended. •