Miron Construction/Chg Or G-4/Oshkosh Center
CHANGE Distribution ORDER OWNER 'lg.' AIA DOCUMENT G701 CONTRACTOR ❑ FIELD ❑ OTHER ❑ PROJECT: Oshkosh Centre CHANGE ORDER NUMBER: G-4 (name, address) Oshkosh, WI INITIATION DATE: June 21, 1985 TO (Contractor): r ARCHITECT'S PROJECT NO: 1383 1 P. G. Miron Constr. Co. , II1d • CONTRACT FOR: General Project Work 806 Valley Road Entire Project Menasha, WI 54952 L J CONTRACT DATE:December 20, 1984 You are directed to make the following changes in this Contract: Plumbing Changes C►A PPROVEID 1. Outside Underground Work - Credits for deletion of temporary sanitary sewer JUL 0 • ' 5 connection, sanitary chamber, and shallow .f a a al II . _ 8" storm work; additions for revised work �Ir" �"' .'''' OSHKOSH,WISCONSI� on 10" deep storm, and coring of founda- tion wall for 8" storm connecting to City sewer . Add $122. 56 I hereby certify that the re�.°essary provisiol hav^ lYs!e:I ria!'.e i:_1 pav i r,A li f-ili,. vr••• �v 2. Substitution of D-25-P Culligan Deionizer �. . I.__ ` accrue vt,e: ii ca.: :: c,t. water softener for 980052 Culligan water softener originally specified. During 9 ,-) delay in award of contract, model orig- (t -1 , i6...utt..t11 Q V '" ina lly specified discontinued . Replace- City Comr,iroiler ment model is improved model . Add 272 . 51 (Proposals Attached) Total Add $395. 07 Not valid until signed by both the Owner and Architect. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. The original (Contract Sum) ( aia,Iteed-M'axiTrmm'-€o t) was $ 3, 675, 000. 00 . Net change by previously authorized Change Orders $ (522, 158 . 47) . The (Contract Sum) {Curar-a>:rteed-Marim•dfrrG(95-t) prior to this Change Order was $ 3, 152, 841. 53 - The (Contract Sum) (Guaranteed—Maximum-Cost) will be (increased) (detreasedJ-ftmd nged) 395. 07 by this Change Order $ • The new (Contract Sum) (. ,ea-Fa ee4Max+m €e'sE) including this Change Order will be $ 3, 153 , 236. 60 The Contract Time will be-fi+•c-feed)-(decfeased) (unchanged) by ( 0 ) Days. The Date of Substantial Completion as of the date of this Change Order therefore is Unchanged • Authorized: Reinke , Hansche, Last, Inc. P. G. Miron Constr. Co. The City of Oshkosh ITECT CONTRACTOR OWNER North Main Street 806 Valley Road 215 Church Street Address Address Address Oshkosh, WI 54901 Menasha , WI 54952 Oshko , WI , 490 1 /bs2.2 , i �' gYWi iam D.1r�ieh It nage] BY BY DATE G/�PJ�IJ DATE ( •_ _ _ . . �-riati�- elerl AIA DOCUMENT G701 • CHANGE ORDER • APRIL 1978 EDITION • AIA® • © 1978 Date: 7/5/85 THE AMERICAN INSTITUTE OF ARCHITECTS,1735 NEW YORK AVE., N.W.,WASHINGTON, D.C.20006 G701 —1978 Telephone(414)734-4161 P. G . MIRON CONSTRUCTION CO . , INC. CONTRACTORS • CONSTRUCTION MANAGERS • MACHINE ERECTORS • DESIGN SERVICES P.O. Box 962 Appleton,WI 54912 June 5, 1985 Reinke, Hansche, Last, Inc. aJ 805 N. Main Street Oshkosh, Wisconsin 54901 RE: OSHKOSH CENTRE Gentlemen: Enclosed are two quotations from Drucks Plumbing & Heating for extras completed on the above captioned project. 1) Outside underground work. Drucks $106.58 +15% 15.98 TOTAL $122.56 2) Add for using D-25-P Culligan Deionizer water softener, because the one requested in original specifications is no longer available. Drucks $236.97 +15% 35.54 TOTAL $272.51 Please issue change orders for the above at your earliest convenience. Should you have any questions don't hesitate to call. Sincerely, P. RON CONSTRUCT yM I Greg Ki an President GK/kb encs. CH':_:CE ORDER sun APY L.;rig: DRUCKS 1. Project Oshkosh Centre PL JTAFi:1G - HEATING - COOLING 2. Job No. 1::04 THIRD STREET MENASHA, WISCONSIN 54952 3. Change Order Requested By Reinke, Hansche, Last. /n.ENASHA -722.2642 4. Change Order Request No. D. P. & H. #5 OSHKOSH - 426-3695 5. Change Order Request Date 5/9/85 6. Date 5/14/85 7. Description of Work Al]. credit and additions for outside underground work which was by Gust Company, a subcontractor of Drucks. 8. TOTAL MATERIAL $ None 9. SALES TAX @ 5% $ 10. Foreman Hours @ _ $ 11. Tradesman Hours @ _ $ 12. Trainee Hours @ _ $ 13. Laborer Hours @ = $ (Project 14. (Manager 3 Hours @ 25.00 = $ 75.00 15. Travel Time, Subsistence $ -.- 16. Truck • Miles @ .30 = $ 17. TOTAL LABOR $L 75.00 -- 18. TOTAL MATERIAL & LABOR COSTS $_ 75.00 19. Overhead @ �3 % $ 17.25 - 20. CHANGE ORDER SUBTOTAL COST $ 92.25 21. Profit @ 10 % $ 9.23 * 22. TOTAL COST DRUCKS PLUMBING & HEATING CO. $ 101.48 SUECONTRACTS: 23. Subcontracts Gust Company Credits $ 1000.00 See Gust Company 24. " It Additions $ 1004.77 - breakdown attached. 25. $ 26. $ 27. SUBTOTAL SUBCONTRACTS $ 4.77 28. DRUCKS Subcontract Handling Charge c9 7 $ __ • 3 *29. TOTAL SUBCONTRACT COSTS $ 5.10 .:IP'ANT RENTAL: 3: . a 31. $ 32. $ 33. $ 34. $ *35. TOTAL EQUIPMENT RENTAL $ None *36. Special Insurance Costs $ n *37. Estimating Cost $ *38. Permits & Fees $ 39. TOTAL. PRICE THIS CHANGE $ io6.58 40. Cost if this Change Order is not accepted $ 41. This proposal may be withdrawn by us if not accepted within days 42 . Time Extension required, days. 43 . Submitted By 44. Date 5/1 /85 45 . Approved By 46. Date STANDARD QUALIFICATION PARAGRAPHS This cuotation is based on working an eight-hour day and covers the structural change in our work only. The above price is based upon performing proposed work included in the change order with a minimum impact on work originally bid and contracted for. Any subsequent changes in the construction schedule or additional change orders that will cause DruckS Plumbing & Heating Company to perform the work contained in this change order in a manner different than our change order estimate, will result in a constructive change to the contract, and additional compensation resulting in this constructive change will be requester when the amount of additional cost is known. The price quoted for work is based on the understanding that the work performed under this proposed change' order will not delay the Owner's acceptance of work and commencement of warranty work being performed under the original contract and change orders executed to date. Arfit y` trtW 0 OF oSHF(O311, /NC. _ AREA CODE 414 General and Public Utility Contractors TELEPHONE 231-7377 235-7377 2300 ALGOMA BLVD., OSHKOSH, WIS. 54901 Drucks Plumbing & HeatinE 504 3rd . St. Menasha , Wi. 54952 Att: Roger Erdman Re : Oshkosh Convention Center Credits 40 Lf. 8 in. shallow storm •@ 3 16/ft . 3 6LO.00 Re work sanitary chamber 70.00 12 Lf. Temporary san. sewer @ 20/ft . 2:.0.00 Close outfall to S. with concrete 50.0'' 1 (\(' .OC Additions 15 Lf. 10 in. deer storm Q 26./ft . 300.00 1 - 10 in. elbow with labor 12.00 Man hole connection 70.00 r-1 ?.0 707 . '0 Core bore hole fo - . in. sto m to 11 c 1-i:^ . 200. ^•7 Lbo° 1CC. CC. n LETTER OF TRANSMITTAL DRUCKS PLUMBING-HEATING- COOLING 504 THIRD STREET, MENASHA, WISCONSIN 54952 MENASHA - 722-2642 OSHKOSH -426-3695 DATE jQuotation No. TO P. G. Miron Construction Co. 5/13/85 Attention 806 Valley Road Cristy • • Project Name Menasha, Wi. 54952 Oshkosh Centre ,• GENTLEMEN: Purchase Order WE ARE SENDING YOU: Attached ❑ Under separate cover via the following items: ❑ Shop drawing ❑ Prints ❑ Plans ❑ Samples ❑ Specifications ❑ Copy of Letter Submittals . ❑ Operation &Maintenance Manuals in Other (specify) Drucks change order #3 COPIES FORM NO. DESCRIPTION - • Culligan quote for specified water softener. 1 Culligan quote for suggested alternative. • • THESE ARE TRANSMITTED as checked: at For approval ❑ For your use ❑ As requested ❑ Approved as noted ❑ Approved as submitted ❑ Returned for corrections ❑ Resubmitted as requested ❑ Return corrected prints C❑ Return approved REMARKS If the price difference for the equipment we suggested is not acceptable,_±hen seeing as the specified equipment is no longer avaible, the architect ghnn1ri 9pPrify e•ui•ment he feels will be in the 'rice ran•e t - - , . - a. resubmit our change order request with that equipment. g:L COPY TO / SIGNED J FOLLOW-UP DATE • CHANGE OPDrR SUNNARY lfw [PUCKS 1. Project Oshkosh Centre PLUM SING - HEATING - COOLING 2. Job No. , . 504 THIRD STREET MENASHA, WISCONSIN 54952 3. Change Order Requested By Drucks Plbg. & Htg. Co. 1:1ENASHA -722.2642 4. Change Order Request No. D. P. & H. #3 OSHKOSH -426-3695 5. Change Order Request Date 3/14/85 6. Date 3/15/85 7. Description of Work The Culligan water softener specified is no longer available, so we are suggesting the Culligan D-25-P deionizer. 8. TOTAL MATERIAL $ 143.00 9. SALES TAX @ 5% $ 7.15 10. Foreman - Hours 9 = $ 11. Tradesman Hours 9 = $ 12. Trainee Hours 9 _ $ 13. Laborer Hours 9 _ $ (Project 14. (Manager 1 Hours 9 25.00 = $ 25.00 15. Travel Time, Subsistence 16. Truck Miles 9 .30 = $ 17. TOTAL LABOR $ 25.00 18 . TOTAL MATERIAL & LABOR COSTS $ 175.15 19. Overhead @ 23 9- $ 40.28 20. CHANGE ORDER SUBTOTAL COST $ 215.43 21. Profit @ 10 % $ 21.54 * 22. TOTAL COST DRUCKS PLUMBING & HEATING CO_ $ 236.97 SUBCONTRACTS: 23 . Subcontracts $ 24. $ 25. $ 26. $ 27. SUBTOTAL SUBCONTRACTS $ 28. DRUCKS Subcontract Handling Charge 9 *29. TOTAL SUBCONTRACT COSTS $ None UIPMENT RENTAL: 30. S 31. 32. $ • 33. $ 34. $ S *35. TOTAL EQUIPMENT RENTAL None $ w *36. Special Insurance Costs H c *37. Estimating Cost *38. Permits & Fees ft 39. TOTAL PRICE THIS CHANGE $ 236.97 40. Cost if this Change Order is not accepted $ 41. This proposal may be withdrawn by us if not accepted within 30 days 42. Time Extension required, days. /� 44. Date 3/15/85 43. Submitted By —�° ,,., ✓` U 45. Approved By 46. Date • STANDARD QUALIFICATION PARAGRAPHS This quotation is based on working an eight-hour day and covers the structural change in our work only. The above price is based upon performing proposed work included in the change order with a minimum impact on work originally bid and contracted for. Any subsequent changes in the construction schedule or additional change orders that will cause Drucks Plumbing & Heating Company to perform the work contained in this change order in a manner different than our change order estimate, will result in a constructive change to the contract, and additional compensation resulting in this constructive change will be requester when the amount of additional cost is known. The price quoted for work is based on the understanding that the work performed under this proposed change order will not delay the Owner's acceptance of work and commencement of warranty work being performed under the original contract and change orders executed to date. • . !ATION AND _CIF ICATION • Quotation Date Roger- Erdlnarr of -nz -5 ' flruaks P1 umtring Our Quote & Spec. No. TO 5n4 3rdr St. Mena -ha, Your Inquiry No. Wt I Your Inquiry Date Job Gentlemen: We take pleasure in quoting you as follows: fine model 0.$nn52 Rechargable watersoftner' Price 17n.nn • The equipment and/or material proposed will be as described above and in accordance with specifications attached to and made a part of this quotation. No of sheets attached Prices are F.O. B. Your' plant Shipping Point --- Inc. Approx. Shipping Weight, lb. Freight cost,estimated $ to 7 — Payment Terms Net on Invoice- Delivery Weeks This quotation is subject to the conditions on the reverse side, and is based on current prices. YOUR LOCAL CULLIGAN REPRESENTATIVE We thank you for the opportunity of quoting on your requirr: menu. /21-Q.' 7/(\,_ e.% authorized signature •r,JN AND • ,FICATION O Quotation Date 3 - 11 - 85 Roger ErdinarI• Drucks PTumbing Our Quote & Spec. No n3- - n2. - 58' TO 5n/J. 3rd St . M''ena'aha, Wi Your Inquiry No. Your Inquiry Date Job QilOtls-- - t;entlernen: We tawe pleasure in quoting you as follows: 'nits Quote ts- to- replace ffol — n2- - 58 Item. #C8nf)52 is no longer' available Repn1 a- With D75 P De crnizpr- #24775n Price, 313.nn • The equipment and/or material proposed will be as described above and in accordance with specifications attached to anJ of this quotation No of sheets atta_neu Pr:..r. Jre F 0 2 'tour g1 ant Shipping Point Inc. Apc:rux. Sh::;: :n-I Vdultint, lb. Freight cost,estimated S to Net on Inw'oice 7 — 3 Weeks nent Ter:: : Delivery tus quotdt.or :, sot;t:ct to the conditions on the reverse side, and is based on current or ices. YOUR LOCAL CULLIGAN REPRESENTATIVE We thank you for me o;.,purturuty of quOUny menu. Y r—c7-6/ in�ritro ugnst..r. CHANGE Distribution to: ORDER OWNER k- ARCHITECT ❑ A/A DOCUMENT G701 CONTRACTOR ❑ FIELD ❑ OTHER ❑ PROJECT: Oshkosh Centre CHANGE ORDER NUMBER: G-4 (name, address) Oshkosh, WI INITIATION DATE: June 21, 1985 TO (Contractor): ARCHITECT'S PROJECT NO: 1383 P. G. Mixon Constr. Co. , Ina CONTRACT FOR: General Project Work 806 Valley Road Entire Project Menasha, WI 54952 L _J CONTRACT DATE:December 20, 1984 You are directed to make the following changes in this Contract: Plumbing Changes 1. Outside Underground Work - Credits for APPROVED deletion of temporary sanitary sewer connection, sanitary chamber , and shallow JUL i •8! 8" storm work; additions for revised work \Q... 't ,!•on 10 deep storm, and coring of founda- OSHKOSH,WISCONSIN tion wall for 8" storm connecting to City sewer . Add $122. 56 2. Substitution of D-25-P Culligan Deionizer. a ' ' - . water softener for 980052 Culligan water ' ;_;, ''''i' ,; softener originally specified. During ., delay in award of contract, model orig- / `�' _ A'ina lly specified discontinued. Replace- - ment model is improved model . Ri ."M2i7211.e61 (Proposals Attached) Total Add $395. 07 Not valid until signed by both the Owner and Architect. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. The original (Contract Sum) ,---dldllteed lvtaxlrmam list) was $ 3, 675, 000. 00 . Net change by previously authorized Change Orders $ (522, 158 . 47) The (Contract Sum) {terrarrteed-AAaxi n nr{-eat) prior to this Change Order was $ 3 , 152, 841. 53 - The (Contract Sum) (Giwranteed-A4a4iuum_Cost) will be (increased) ( reased}-(arrchartged) 395. 07 by this Change Order $ The new (Contract Sum) (FGte ntee4Mextm 4es) including this Change Order will be $ 3, 153, 236. 6 0 . The Contract Time will be-(ifrefee )-(sec-Feaed) (unchanged) by ( 0 ) Days. The Date of Substantial Completion as of the date of this Change Order therefore is Unchanged • Authorized: Reinke , Hansche, Last, Inc. P. G.Miron Constr . Co. The City of Oshkosh AR ITECT CONTRACTOR OWNER 8u North Main Street 806 Valley Road 215 Church Street Address Address Address Oshkosh, WI 54901 Menasha , WI 54952 Oshik.sh, WI 54901 BY (04-ke"..- BY Al - z/ 4 ./ii fC1'I,yCx':_____ BY^i am ��ue.> i y Ma ager DATE ./ ./I,)- DATE S C., C, �-j j' i )T o r"��� 1L was i y Cl erk AIA DOCUMENT G701 • CHANGE ORDER • APRIL 1978 EDITION • A I/0 • © 1978 Date. i/ 7 3 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W.,WASHINGTON, D.C. 20006 G701 —1978 Telephone(414)734-4161 P. G . M I RON CONSTRUCTION CO• , INC . CONTRACTORS • CONSTRUCTION MANAGERS • MACHINE ERECTORS • DESIGN SERVICES P.O. Box 962 Appleton,WI 54912 June 5, 1985 h Reinke, Hansche, Last, Inc. 'a 805 N. Main Street Oshkosh, Wisconsin 54901 RE: OSHKOSH CENTRE Gentlemen: Enclosed are two quotations from Drucks Plumbing & Heating for extras completed on the above captioned project. 1) Outside underground work. Drucks $106.58 +15% 15.98 TOTAL -- $122.56 2) Add for using D-25-P Culligan Deionizer water softener, because the one requested in original specifications is no longer available. Drucks $236.97 +15% 35.54 TOTAL --------- $272.51 Please issue change orders for the above at your earliest convenience. Should you have any questions don't hesitate to call. Sincerely, P. RON CONSTRUCTpN _7/(</(7,1.7,140 ,..„ Greg Kippenhan President GK/kb encs. X7) CHANGE ORDER SUMMARY DUCKS 1. Project Oshkosh Centre PL'JM,MriN(; - HEATING - COOLING 2. Job No. `,04 THIRD STREET MENASHA, WISCONSIN 54952 3. Change Order Requested By Reinke, Hansche, Last. 1.1ENASHA -722.2642 4. Change Order Request No. D. P. & H. #5 OSHKOSH -426-3695 5. Change Order Request Date 5/9/85 6. Date 5/14/85 7. Description of Work All credit and additions for outside underground work which was by Gust Company, a subcontractor of Drucks. 8. TOTAL MATERIAL $ None 9. SALES TAX @ 5% $ 10. Foreman Hours @ = $ 11. Tradesman Hours @ = $ 12. Trainee Hours @ _ $ 13. Laborer Hours @ = $ (Project 14. (Manager 3 Hours @ 25.00 = $ 75.00 15. Travel Time, Subsistence $ 16. Truck • Miles @ .30 = $_ 17. TOTAL LABOR $ 75.00 18. TOTAL MATERIAL & LABOR COSTS $_ 75.00 19. Overhead @ �3 % $ 17.25 - 20. CHANGE ORDER SUBTOTAL COST $ 92.25 21. Profit @ 10 $ $ 9.23 * 22. TOTAL COST DRUCKS PLUMBING & HEATING CO. $ 101.48 =CONTRACTS: 23. Subcontracts Gust Company Credits $ 1000.00 See Gust Company 24 . Additions $ 1004.77 breakdown attached. 25. $ - 26. $_ 27. SUBTOTAL SUBCONTRACTS $ 4.77 28. DRUCKS Subcontract Handling Charge @ 7 % $ -33 *29. TOTAL SUBCONTRACT COSTS $ 5.10 0UIPMENT RENTAL: 30. ' 31. 32. $ • 33. $ 34. $ *35. TOTAL EQUIPMENT RENTAL $ None $ If *36. Special Insurance Costs ft *37 . Estimating Cost S C If *38. Permits & Fees $ 39. TOTAL. PRICE THIS CHANGE $ 106.58 40. Cost if this Change Order is not accepted $ 41. This proposal may be withdrawn by us if not accepted within days 42. Time Extension required, days. 43. Submitted By 7pY e,`1 . Date 5/14/85 45. Approved By 46. Date STANDARD QUALIFICATION PARAGRAPHS This quotation is based on working an eight-hour day and covers the structural change in our work only. The above price is based upon performing proposed work included in the change order with a minimum impact on work originally bid and contracted for. Any subsequent changes in the construction schedule or additional change orders that will cause DruckS Plumbing & Heating Company to perform the work contained in this change order in a manner different than our change order estimate, will result in a constructive change to the contract, and additional compensation resulting in this constructive change will be requester when the amount of additional cost is known. The price quoted for work is based on the understanding that the work performed under this proposed change order will not delay the Owner's acceptance of work and commencement of warranty work being performed under the original contract and change orders executed to date. .1 T • .4._, t. - ,-: , - tr,- ,--Iii. ,. 1,..„,: _, ... , ..,,,L itt7.., 0 OF OSII OS , INC. AREA CODE 414 General and Public Utility Contractors TELEPHONE 231-1900 2300 ALGOMA BLVD., OSHKOSH, WIS. 54901 235-7377 =:-/13/F!7, Drucks Plumbing & Heating 504 3rd . St. Menasha , Wi. 54952 Att: Roger Erdman Re: Oshkosh Convention Center Credits .. r 6h0.00 40 Lf. 8 in. shallow storm @ 3 16/ft , 3 Re work sanitary chamber 70.00 12 Lf. Temrorary san, sewer @ 20/ft. 210.00 Close outfall to S. with cone-ete 50.00 1000.00 Additions 15 Lf. 10 in, deer storm @ 26!ft . 300,00 1 - 10 in. elbow with labor 152,00 Man hole connection 70.00 1 P,C- 707 , 20 J Core bore hole fo 9• in. sto~'m to W. 1•':-ci-i_ne 200.07 1 rC CC Lazo- .. n LETTER OF TRANSMITTAL DRUCKS PLUMBING-HEATING-COOLING 504 THIRD STREET, MENASHA, WISCONSIN 54952 MENASHA- 722-2642 OSHKOSH -426-3695 DATE i Quotation No. • TO P. G. Miron Construction Co. 5/13/85 1 Attention 806 Valley Road Cristy • Project Name Menasha, wig 54952 Oshkosh Centre GENTLEMEN: Purchase Order . WE ARE SENDING YOU: S Attached ❑ Under separate cover via the following items: ❑ Shop drawing ❑ Prints ❑ Plans ❑ Samples ❑ Specifications ❑ Copy of Letter ❑ Submittals ❑ Operation & Maintenance Manuals it Other (specify) Drucks change order #3 COPIES • FORM NO. DESCRIPTION 1 Culligan quote for specified water softener. • 1 Culligan quote for suggested alternative. • • • • THESE ARE TRANSMITTED as checked: Et For approval ❑ For your use ❑ As requested ❑ Approved as noted ❑ Approved as submitted ❑ Returned for corrections ❑ Resubmitted as requested ❑ Return corrected prints 0 Return approved REMARKS •If the price difference for the equipment we suggested is not_.c.ceptable_,—then . seeing as the specified equipment is no longer avaible, the architect Rhoulri appnify e•ui•ment he feels will be in the 'rice ran•e t e . _• • • - - .. . - r' • - -. • resubmit our change order request with that equipment. a/COPY TO C./ SIGNED FOLLOW-UP DATE • CHANCE ORDER SU:1:su?RY DUCKS 1. Project Oshkosn Centre rLurY'PANG - HEATING - COOLING 2. Job No. , 504 THIRD STREET MENASHA, WISCONSIN 54952 3. Change Order Requested By Drucks Plbg. & Htg. Co. MENASHA -722-2642 4. Change Order Request No. D. P. & H. #3 OSHKOSH -426-3695 5. Change Order Request Date 3/14/85 6. Date 3/15/85 7. Description of Work The Culligan water softener specified is no longer available, so we are suggesting the Culligan D-25-P deionizer. 8. TOTAL MATERIAL $ 143.00 9. SALES TAX 9 5% $ 7.15 10. Foreman Hours @ _ $ 11. Tradesman Hours 9 _ $ 12. Trainee Hours 9 = $ 13. Laborer Hours 9 = $ (Project 25.00 14. (Manager 1 Hours 9 25.00 = $ 15. Travel Time, Subsistence $_ 16. Truck Miles 9 .30 = $ 17. TOTAL LABOR $Y 25.00 18. TOTAL MATERIAL & LABOR COSTS $ 175.15 19. Overhead @ 23 $ 40.28 20. CHANGE ORDER SUBTOTAL COST $ 215.43 21. Profit @ 10 % $ 21.54 -- * 22. TOTAL COST DRUCKS PLUMBING & HEATING CO. $ 236.97 SUBCONTRACTS: 23. Subcontracts $ 74. $ .! 25. $ 26. $- 27. SUBTOTAL SUBCONTRACTS $ 28. DRUCKS Subcontract Handling Charge 9 $_____ $ None *29. TOTAL SUBCONTRACT COSTS • ;:UIP' 'NT RENTAL: 30. 31. $ 32. $ 33. $ 34. $ *35. TOTAL EQUIPMENT RENTAL $ None *36. Special Insurance Costs $ *37. Estimating Cost S *38. Permits & Fees $ /I 39. TOTAL PRICE THIS CHANGE $ 236.97 • 40. Cost if this Change Order is not accepted $ 41. This proposal may bey withdrawn by us if not accepted within 30 days 42. Time Extension required, �✓ days. 43. Submitted By Qc-r �,, 1. �,+,�v 44. Date 3/15/85 45. Approved By 46. Date • STANDARD QUALIFICATION PARAGRAPHS This quotation is based on working an eight-hour day and covers the structural change in our work only. The above price is based upon performing proposed work included in the change order with a minimum impact on work originally bid and contracted for. Any subsequent changes in the construction schedule or additional change orders that will cause Drucks Plumbing & Heating Company to perform the work contained in this change order in a manner different than our change order estimate, will result in a constructive change to the contract, and additional compensation resulting in this constructive change will be requested when the amount of additional cost is known. The price quoted for work is based on the understanding that the work performed under this proposed change order will not delay the Owner's acceptance of work and commencement of warranty work being performed under the original contract and change orders executed to date. • (ATI,ON ANU _CIFICATION 0 m • Quotation Date 7•45-18� Roger- Erdlman flruak5 Plumbing Our Quote & Spec. No. Or -02 -51 TO 504 3rd St. )Tenasha, W5 • Your Inquiry No. I Your Inquiry Date Job Gentlemen: We take pleasure in quoting you 'as follows: One model 0.$nn52 Rechargable watersoftner' • Price 17n.nn • • The equipment and/or material proposed will be as described above and in accordance with specifications attached to and made a par t of this quotation. No of sheets attached Prices are F.O.B. Your' plant Shipping Point PP 9 --- Inc. Approx. Shipping Weight, lb. Freight cost,estimated $ to Payment Terms N'et on Delivery 2 - 3' Weeks This quotation is subject to the conditions on the reverse side, and is based on current prices. YOUR LOCAL CULLIGAN REPRESENTATIVE We thank you for the opportunity of quoting on your require menu. ' authorized signature .r, )N AND F,CrTIGr� I C Quotation Date 3 - 1,1 - $5 Roger Erdman. Drucks PTumbing Our Quote & Spec. No f I3 - (T7. - 5 ' TO 5n1,_ 3rd St . Menaa-hai, Wi Your Inquiry No. • I Your Inquiry Date Job Quot aer•.t;ernen We lane pleasure in quoting you as follows: Qunte is- to replace #01 — (12- — 5$ Item. #P$nr)52' is no longer.- available Repot • With D75 P De cTnizerr #247750 Price 31,3'.00 • • The equipment and/or material proposed will be as described above and in accordance with specificsuons attached to arid n r:e a par of this quotahun No of sheets atta rteu ,:re F Q J our gl ant Shipping Point ---___-- Inc. Ap,:rux. Stn:4 Inu ':ieiunt, lb. Freight cost, estimated 5• to _ �Jr sent . Net on Inmoic Delivery 7 — 3 Weeks his quotat.ur ,s s.;b;ect to the conditions on the reverse side, and is based on current prices. YOUR LOCAL CULLIGAN REPRESENTATIVE We thank you for me oppurtt.ruty of quoting oa ru-; menu. • By -0-1 Cu.- �..:rJli(rtl S.Qnst,rl