Loading...
HomeMy WebLinkAbout0158371-Plumbing (sump pump) � CITY OF OSHKOSH No 158371 OSHKOSH PLUMBING PERMIT -APPLICATION AND RECORD ON THE WATER : Job Address 537 W SOUTH PARK AVE Owner RAYMOND/DEANNA L THOMPSON Create Date 10/21/2013 Contractor OWNER __ _ Category 412-Res-Interior(New/Relocated Fixtures) Plan Inspector Jerry Fabisch Bathtub 0 Clothes Wshr 0 Classrm Sink 0 Surgeons Sink 0 Roof Drain 0 Deduct Meters 0 Shower 0 Lndry Tray 0 Exam Sink 0 Sterilizer 0 Soda Disp 0 Wtr Sewer Mtrs 0 Whiripool _ 0 Sump Pump 1 F Prep Sink 0 RPZ Valve 0 Coffee Maker 0 Wtr Usage Mtrs 0 Lavatory 0 San Sump/Pump 0 Fir/Wst Sink 0 Bidet 0 Site Drain 0 Misc. 0 Toilet 0 Water Softner 0 Hand Sink 0 Urinal 0 Wait.St. 0 Fixtures Kit Sink 0 Standp Rec 0 Lab Sink 0 Beer Tap 0 Ice Chest 0 Disposal 0 Gar Drain 0 Plaster Sink 0 Dip Weli 0 Comm Ice Maker 0 Dishwasher 0 Local Waste 0 Sculry Sink 0 Drink Ftn 0 Int Grease Trap 0 Fioor Drain 0 Bar Sink 0 Serv Sink 0 Wash Ftn 0 Ext Grease Trap 0 Hose Bibb 0 Breakrm Sink 0 Shamp Sink 0 Catch Basin 0 Eye Wash Statn 0 Water Heater 0 Use/Nature SFR/adding a sump pump and draintile to basement of Work � Size Material Type # Conn.Type Sanitary Sewer Storm Sewer Water Service Parcel Id# 1300720000 Valuation $200.00 Pian Approval $0.00 Permit Fees $30.00 ❑ Permit Voided Issued By Lj� � Date 10/21/2013 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement holder(s)and to secure any necessary approvals before starting such activity. ' Signature Date � � _� J /3 Agen Owner Address 808 W.GRUENWALD AVE. Oshkosh WI 54901 -0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.