Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Miron Construction/Chg Or G-9
CHANGE Distribution to: ORDER OWNER ,� r ARCHITECT ❑ AIA DOCUMENT G701 CONTRACTOR ❑ FIELD ❑ OTHER ❑ PROJECT: Oshkosh Centre CHANGE ORDER NUMBER: G-9 (name, address) Oshkosh, Wisconsin INITIATION DATE: July 31, 1985 TO (Contractor): ARCHITECT'S PROJECT NO: 1383 P. G. Miron Construction Co. Valley Road CONTRACT FOR: General Project Work Menasha, WI 54952 Entire Project CONTRACT DATE: December 20, 1984 You are directed to make the following changes in this Contract: Furnish labor and material to make the changes shown on Sheet A-7, Revision /2`,, dated June 28, 1985 and Sheet REV-1, dated June 28, 1985, except as follows: Sheet REV-1 1. Delete speakers in rooms 177, 178, 179 and 180 as shown on Partial Lighting Plan. 2. Delete relocating Electrical Panel B in Room 170 as shown on Partial Power Plan. Panel will not be re- located; door D-142 will be located l'-0" further east instead. Add $15,000.00 I hereby cerl`f" that the necessary provisions have ocryn lability which will PROVED accrue unde.I I UGoi . ;AP (Proposal Attached) 1 ����'' =, �i City Comptroller - CITY AnO' Ev " ACHKOSH WIXOM Not valid until signed by both the Owner and Architect. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. The original (Contract Sum) (Gt a ariteed-MaNif=ru-rrt-Gost5 was $ 3,675,000.00 Net change by previously authorized Change Orders $ (520,893.61) The (Contract Sum) (6nararrteeed-Marxi-rnam-{-ost) prior to this Change Order was $ 3,154,106.39 The (Contract Sum) (€raarantee'd-Mammvm Eost) will be (increased) (cfecreasedhiIndranged) 15,000.00 by this Change Order $ The new (Contract Sum) (F,ma-raateed-4aac-ixft►m-Cost) including this Change Order will be $ 3,169,106.39 The Contract Time will be (ireased4-4dec-Feared) (unchanged) by ( 0 ) Days. The Date of Substantial Completion as of the date of this Change Order therefore is March 28, 1986 Authorized: Reinke, Hansche, Last, Inc. P. GSA Miron Const. Co. , Inc. 1n The City of Oshkosh ' 'MIT& th Main Street SUC�T Valley Road O G1 Church Street Addr ss Address AdddOr Ohkosh, WI 54901 Menasha, WI 54952 shskoshy WI 54901 BY O BY !�/� � �- BY G _ Atiat e r DATE 8 S Bf DATE � ' D•TE AIA DOCUMENT G701 • CHANGE ORDER • APRIL 1978 EDITION • AIA@ • © 1978 V 1,4714_, (_1• ^ - THE AMERICAN INSTITUTE OF ARCHITECTS,1735 NEW YORK AVE., N.W.,WASHINGTON, D.C. 20006 701 —19 JUL : C 1985 Telephone (414)734-4161 4 P. G . MIRON CONSTRUCTION CO . , INC. CONTRACTORS • CONSTRUCTION MANAGERS • MACHINE ERECTORS • DESIGN SERVICES P.O. Box 962 Appleton,WI 54912 July 29, 1985 Reinke, Hansche, Last, Incorporated 805 N. Main Street Oshkosh, Wisconsin 54901 RE: OSHKOSH CENTRE Gentlemen: • We propose to furnish labor and material to complete the work on .revised sheet A-7, dated June 28, 1985, for the sum of $15,000.00. This figure is broken down as follows: Wood Doors and Cabinets $ 1,854.00 Steel Studs and Drywall 3,511.00 HVAC 2,100.00 Fire Protection 283.00 Acoustical Ceilings 322.00 Painting 1,060.00 Glass & Glazing 172.00 Hollow Metal 515.00 Electrical 2,400.00 12,217.00 P. G. Miron's Management Fee 1,832.00 P. G. Miron's Labor 951.00 TOTAL $15,000.00 Should you have any questions regarding this quotation, please feel free to contact me. Sincerely, P. G. MIRON CONSTRUCTION /1 1, Greg Kippenhan President GK/kb