HomeMy WebLinkAboutMiron Construction/Chg Or G-8 CHANGE Distribution to: JUL 3 0 1985 ORDER OWNER I ARCHITECT ❑ AuG 1985 AIA DOCUMENT G701 CONTRACTOR LI 21 FIELD ❑ OTHER ❑ PROJECT: Oshkosh Centre CHANGE ORDER NUMBER: G-8 (name, address) Oshkosh, Wisconsin INITIATION DATE: July 26, 1985 TO (Contractor): ARCHITECT'S PROJECT NO: 1383 1-7). G. Miron Const. Co. , Inc. 806 Valley Road CONTRACT FOR: General Project Work - Menasha, WI 54952 Entire Project CONTRACT DATE: December 20, 1984 You are directed to make the following changes in this Contract: Increase contract completion time by 21 days. Contractor was delayed in his masonry work due to lack of special shape bricks. APPROVED AG1 .i19:5 � CITY ATT• r OSHKOSH,WISCONS I hereby cer, f-i that thr: rl 3Ct SS 1.ry provisions have been niat_: tc ,�.;�� �:�_: liability which wilt accrue und=.:r this con ia,JJ. 2- a irk (Support documents attached) City Comptroller Not valid until signed by both the Owner and Architect. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. The original (Contract Sum) {Gt ttantccd Phi H t-n9--C—t) was $ 3,675,000.00 Net change by previously authorized Change Orders $ (520,893.61) The (Contract Sum) (Gerararrteeel-A4exinttwii-C-ost) prior to this Change Order was $ 3,154,106.39 The (Contract Sum) (E,vxranteed-M sttntim-east) will be (itTereased•}-f 4eercased) (unchanged) by this Change Order $ 00.00 The new (Contract Sum) (Guaaanteed-Maximumlo.s.) including this Change Order will be $ 3,154,106.39 • The Contract Time will be (increased) (dccx-Qa-sed) (trrIJhangedj by ( 21 ) Days. The Date of Substantial Completion as of the date of this Change Order therefore is March 28, 1986 • Authorized: Reinke, Hansche, Last, Inc. P. G. TMiiron Const. Co. The City of Oshkosh 8u 1v�Tz h Main Street 806 CONTRACTOR Road 201 NChurch Street Address Address Address Oshkosh, WI 54901 Menasha, WI 54952 Oshkosh, 54901 BY BY r.� 5..i ��< BY William Pte rue City Mans Y DATE 7/3V,O,f DATE - ✓ DATE /j} AIA DOCUMENT G701 • CHANGE ORDER • APRIL 1978 EDITION • AIA® • © 1978 Z 1/IA,r t . /eta THE AMERICAN INSTITUTE OF ARCHITECTS,1735 NEW YORK AVE., N.W., WASHINGTON, D.C. 20006 City Clerk"01 —1978 imTelephone (414)734-4161 P. G . MIRON CONSTRUCTION CO . , INC. CONTRACTORS • CONSTRUCTION MANAGERS • MACHINE ERECTORS • DESIGN SERVICES P.O. Box 962 Appleton,WI 54912 Afp -v July 10, 1985 REINKE, HANSCHE, LAST, INC. 805 North Main Street Oshkosh, Wisconsin 54901 Re: Oshkosh Centre Gentlemen: We received the enclosed correspondence from the city's brick supplier for the above project. • By not receiving these shapes in a timely fashion, we are requesting an additional 21 day extention. Our mason contractor has lost many of his craftsman due to this delay. We will continue to make every effort possible to make up for these delays. Sincerely, P. G. MIRON CONSTRUCTION CON,`PANY,' INC. 1 LZ__2..•- 1 Greg Kippenhan President GK/cl i7itculskt s BRICK COMPANY July 1, 1985 Fox Valley Stone and Brick Company 1745 Breezewxod Lane Neenah; Wisconsin 54956 Attn: Mr. Steve Boegh Re: Convention Center Oshkosh, Wisconsin Dear Steve: Confirmin__g_ our phone conversation, this is to advise that the special shapes for the above project are in the kiln and scheduled to be ready for pickup the morning of July 5, 1985. The shapes were manufactured at the same time as the stretcher a dick m and from the same clay. However, due to the nature of spec is required for handcutting-and, more importantly, for additional drying. Stretcher brick require only one pass through the dryer before going into the kiln for firing. With special shapes, we take the added precaution of putting than into our shuttle kiln for the first drying process prior to going through the regular dryer and then on into the tunnel kiln for firing. This lessens the chance of the special shapes bloating and distorting. We regret any delay this may have caused, but feel confident that your customer will be much happier with the end product. Yours very truly, MIDLAND BRICK COMPANY • Lawrence and, Adninistrati ales Manager LRH:cc cc: Ottumwa Plant 101 Ashworth Road • West Des Moines. Iowa 50265 • (515) 223-1450