Loading...
HomeMy WebLinkAboutMiron Construction/Chg Or G-7 - CHANGE Distribution to: JUL 3 0 1985 ORDER OWNER 18, / AlA DOCUMENT G701 ARCHITECT ❑ CONTRACTOR ❑ AUG 21 1985 FIELD ❑ OTHER El PROJECT: Oshkosh Centre CHANGE ORDER NUMBER: G-7 (name, address) Oshkosh, Wisconsin TO (Contractor): INITIATION DATE: July 26, 1985 ARCHITECT'S PROJECT NO: 1383 P. G. Miron Const. Co. 806 Valley Road CONTRACT FOR: General Project Work - Menasha, WI 54952 Entire Project 1 CONTRACT DATE: December 20, 1984 You are directed to make the following changes in this Contract: 1. Remove existing buried 16" waterpipe interfering with placement of Pile No. 24. Add $216.48 2. Add concrete grade beam at column line N-6. Two piles to be driven at that location could not be driven due to obstructions. Piles were relocated, but grade beam was required between two piles to support column above. AF3 Add 387.66 PRO13 thereby >t; 1U i F Seer,/ r provisions;,i0fts have h; .,.,,�,ilE Which will r i►JG 16 ' ',5 accrl '@fit r t li„ c:ir}t i. Add $604.14 A I E NSI iii' _ e• 1. OSHKOSH,WISCONSI 1:1.,_kov,,,,,9. Cl City Comptroller Not valid until signed by both the Owner and Architect. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. The original (Contract Sum) (Gaararrteect-btaxnnam-Cusl) was $ 3,675,000.00 Net change by previously authorized Change Orders $ (521,497.75) The (Contract Sum) (Etlaranleed-Maxtmurrreast) prior to this Change Order was $ 3,153,502.25 The (Contract Sum) (EZrararrteetI-btaximtmrCast) will be (increased) (sec-ceaseel)-(trrtd.ta-rged) by this Change Order $ 604.14 The new (Contract Sum) ca.uaranteecLA4axiatum_Ces.t) including this Change Order will be $ 3,154,106.39 The Contract Time will be (irrc•reased)-( creased) (unchanged) by ( 0 ) Days. The Date of Substantial Completion as of the date of this Change Order therefore is March 7, 1986 . Authorized: Reeinke, Hansche, Last, Inc. P. G. Miron Const. Co. The City of Oshkosh WliN]orth Main Street c9WWPfey Road 9Wlt.'E hurch S• reet Address Address Address Oshkosh, WI 54901 Menasha, WI 54952 Oshkosh, 54901 BY BY, /� ire BY __ • F11. `y- DATE 7/.3/,�BJ DATE � ,} / • ,y DATE ✓7/5A.`) AIA DOCUMENT G701 • CHANGE ORDER • APRIL 1978 EDITION • AIA° • © 1978 ,, THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON, D.C. 20006 ����'� `' 1 1978 City Clerk MAY 21192` , . . • Telephone(414)734-4161 P. G . MIRON CONSTRUCTION CO . , INC. CONTRACTORS • CONSTRUCTION MANAGERS • MACHINE ERECTORS • DESIGN SERVICES P.O. Box 962 Appleton, WI 54912 • May 20, 1985 Reinke, Hansche, Last, Inc. 805 North Main Street Oshkosh, Wisconsin 54901 RE: Oshkosh Centre - Change Orders Dear Sir: Please see the enclosed for extra items which we are submitting for change order: 1. Remove 16" waterpipe (84-621-B) : Labor $102.31 Insurance and Payroll 40.93 Equipment 45.00 $188.24 P. G. Miron Management Fee 28.24 Total Change $216.48 2. Add additional concrete wall at column line N-6 (84-621D) : Labor $ 99.82 Insurance and Payroll 39.93 Equipment 2.50 Valley Ready Mixed Concrete 21.53 Viking Steel 173.31 $337.09 P. G. Miron Management Fee 50.57 Total Change $387.66 Total Amount Due $604.14 If you have any questions, please feel free to contact me. Sincerely, / --P. (9 1: MIRON TRUCTION COMPANY, INC. / Greg Kippenh President GK/cl Enclosures (4)