Loading...
HomeMy WebLinkAboutPW CNT 85-10/CHG OR 2 CHANGE ORDER NO. 2 TO: ROBERT ALBRIGHT CONST. DATED: July 8, 1985 1633 Brooks Road Oshkosh, Wisconsin 54901 Your present contract with the City of Oshkosh, Contract No, 85-10 , is hereby amended and changed as follows: ( insert here work and/or materials to be added or eliminated and the unit and/or lump sum price to be added to or deducted from the contract. ) ADD TO BLDG. ADDNS. & ALTERATIONS TO PARKS, STREET/SANITATION & ELECTRICAL DEPTS. SEE ATTACHED ITEMIZED LISTING. TOTAL ADDED BY CHANGE ORDER #2 $509.00 Recommended : �y C I OF G�t?�5. ' n r, -" Director of Pub is Works City Manager City Clerk A ,,roved and acce ted —I--Contras for v'°"°' I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Comptroller Approved as to forms _City Attorney ._ CHANGE ORDER #2 - CONTRACT 85-10 Sanitation Garage @ 639 Witzel Avenue Change 30" diameter gravity vent exhaust to 36" diameter as required by State . The State won' t allow the bldg. to be classified as"unoccupied" for ventilation design, due to the nature of the stored materials, but has accepted the bldg. as "unoccupied" for other design considerations . Cancellation charge for ordered 30" vent $99.00 Additional cost for 36" vent & roof curb $410.00 TOTAL ADDED BY CHANGE ORDER #2 $509.00 •