HomeMy WebLinkAboutPW CNT 85-10/CHG OR 1 CHANGE ORDER NO. 1 TO: ROBERT ALBRIGHT CONST. DATED: June 25, 1985 1633 Brooks Road Oshkosh, Wisconsin 54901 Your present contract with the City of Oshkosh, Contract No. 85-10 9 is hereby amended and changed as follows: ( insert here work and/or materials to be added or eliminated and the unit and/or lump sum price to be added to or deducted from the contract. ) ADD TO BLDG. ADDNS. & ALTERATIONS TO PARKS, STREET/SANITATION & ELECTRICAL DEPTS. SEE ATTACHED ITEMIZED LISTING. TOTAL ADDED BY CHANGE ORDER #1 $34,113.05 TOTAL DEDUCTED BY CHANGE ORDER #1 222.00 NET ADDED BY CHANGE ORDER #1 $33,891 .05 Recommended ; T7 l . CI OF OSHKOSH -\ __(- i/ /s Z B , �irecto-J: of=-Public Works City 'Ia ar City Clerk Armor.. ved , an.'l acc5 epted`; i � I c € �, // I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order . ...� 4,-6..7'�_'ti .ire'✓V .L'L' .._... _,......._._ Comptioller App owed as to form: J i Ly A t;t o r.`.e�, _.__�s CHANGE ORDER #1 - CONTRACT 85-10 Electrical & Sign Dept. alterations @ 926 Dempsey Trail 1. Furnish & install 2 coats of paint (dark color) from floor to 9' above first floor. ADD $560.00 Sanitation Garage @ 639 Witzel Avenue 1. Provide interior liner panel on all walls ADD $5,400.00 2 . Provide all labor, materials & taxes to connect the bldg. sanitary sewer line into the existing city garage sanitary sewer in lieu of the storm sewer line extending out of the last addition to the city garage. This change is required by the Plumbing Inspector. ADD $897.00 Park Dept. Building Addn. @ 805 Witzel Avenue 1. Deepen & modify foundations as necessary to circumvent the landfill and bear on the clay subgrade. Changes are to include but not limited to: A. Addn. excavation & backfill; B. Dewatering of excavations as required; C. Addn. concrete & rebar required; D. Provide foundation walls under all masonry walls; E . All labor, materials, & taxes . ADD $19,216.05 2. Provide 4" PSK fiberglass wall insulation & 6" PSK roof insulation in lieu of 2" in room A104. ADD $3,240.00 3. Provide interior metal liner panel on the exterior walls of room A104. ADD $4,800.00 4. To offset a portion of the cost of change to Sanitation (2 .) , replace the concrete base for the exterior oil storage tank w/a concrete saddle over its ' top and eliminate two hold down straps . Also eliminate one of magnesium anodes . DEDUCT $222.00 TOTAL ADDED BY THIS CHANGE ORDER $34,113.05 TOTAL DEDUCTED BY THIS CHANGE ORDER - $ 222.00 TOTAL - CHANGE ORDER #1 $33,891 .05 NEW CONTRACT TOTAL INCLUDING CHANGE ORDER `1 . $440,434.05