HomeMy WebLinkAboutMeyer Electric/CHG OR E-1/Grand Opera House t* FrV ) YkemPiner rbro DEC 1 8 1985 r; architects, inc. 1018 W. SOUTH PARK AVENUE • POST OFFICE BOX 2096 •L±6b S14, udNiSIN 54903 • 414/235-3310 COMMUNITY DEVELOPMENT CHANGE ORDER NO. E-1 OWNER'S COPY (••' FILE NO. 8133/79005 - Phases III & IV CONTRACTOR'S COPY DATE 19 December 1985 ARCHITECT'S COPY The City of Oshkosh OWNER 215 Church Avenue, Oshkosh, Wisconsin 54901 Meyer Electric, Inc. CONTRACTOR N2092 County G, Chilton, Wisconsin 53014 Electrical Work, Phases III & IV, Restoration and CONTRACT FOR Rehabilitation, The Grand Opera House, Oshkosh, Wisconsin IT IS HEREBY AGREED THE FOLLOWING CHANGE IN THE WORK SHALL BE COMPLETED IN ACCORDANCE WITH THE ATTACHED PROPOSAL AND SUBJECT TO TERMS OF THE ORIGINAL CONTRACT DATED 20 June 1985 SEE ATTACHMENT FOR THE SUM OF (ADD IX -19C6/9 TEN THOUSAND FOUR HUNDRED NINETY EIGHT AND NO/100THS DOLLARS ($ 10 ,498 . 00 ) ADD DEDUCT ORIGINAL CONTRACT 119,700. 00 PRIOR TO EXTRA ORDERS THIS ORDER NONE NONE 10,498 . 00 THIS ORDER 10,498 . 00 NONE CREDIT ORDERS NONE TOTAL TO DATE 10,498 . 00 NONE NET TOTAL TO DATE 130 .198 . 00 APPROVED ACCEPTED YARBRO- EMPIN pt, ARCHITECTS CITY OF :OSHKOSH, SCONSIN BY 2.; � ! c �� BY '*.✓ � - � �,{ City Manager siert . Y •ro BY t � ii- i�L �"i.. � �% �/ City _Clerk ACCEPTED App o al as to • MEYER ELECTRIC INC. BY •J ALA-_ _ rte' Attorney � ��- I hereby certify that the1',.: essary provisions BY , M--cs_'�, 2F% tiir have been made to pay the liability that will accrue under this contract. `_ v , City Comptroller ATTACHMENT Change Order No. E-1 Meyer Electric, Inc . 19 December 1985 RE : File 8133/79005-Phases III & IV Restoration and Rehabiliation The Grand Opera House City of Oshkosh, Wisconsin Page 1 of 4 Item No. 1 : (not used) Item No. 2 : Relocate dimmer bank from Room B. 06 to east wall , Room C. 09, with related feeder changes in accordance with Contractor ' s proposal dated July 25, 1985, copy attached. Deduct $ 4 , 500. 00 Item No. 3 : Provide separate emergency outlets at each location of RTU-1, 2, 3 , 4 , AHU-1 and Orchestra Pit heating system per Contractor ' s proposal dated July 25, 1985, copy attached. Add $ 2 ,200. 00 Item No. 4 : Delete two (2) type N3 fixtures, one in each of the ceilings of the east and west box seats, a total of two fixtures per Contractor ' s proposal dated September 25, 1985, copy attached. Deduct $ 150. 00 Item No. 5 : Omit four (4 ) type H3 fixtures adjacent to main chandelier C5, Main House Ceiling, Level G plan per Contractor ' s proposal dated September 17 , 1985, copy attached. Deduct $ 550. 00 Item No. 6 : Delete Swag Fixtures El in Rooms C. 06 and C. 08 . In Room C. 06 , install a new wall bracket fixture El-A (new Metal Craft No. 3064-2) over each lavatory - total of 3 fixtures. In Room C. 08 , install a new wall bracket fixture El-B (new Metal Craft No. 3069-2) over each lavatory - total of 3 fixtures . Per Contractor ' s proposal dated September 17, 1985, copy attached. Add $ 1,135. 00 ATTACHMENT - Change Order No. E-1 Page 2 of 4 Item No. 7 : Add a conduit system for controlling a future main chandelier winch. Per Contractor ' s proposal dated November 25 , 1985, copy attached. Add $ 670. 00 Item No. 8 : At exterior soffit, Historical South Entrance, change type R3 fixtures from Omega to McPhilben 43A9213 PB - three (3) fixtures involved. Per Contractor ' s proposal dated September 25, 1985, copy attached. Deduct $ 100. 00 Item No. 9 : At exterior soffit, Historical South Entrance, add three (3) type R3 as changed in Item No. 8 above. Per Contractor ' s proposal dated October 9 , 1985, copy attached. Add $ 949. 00 Item No. 10 : Change number and lengths of electric baseboard in various spaces in accordance with Contractor ' s proposal dated October 28 , 1985, copy attached. Add $ 505. 00 Item No. 11 : Change Phase II Air Handling Unit AHU-1 control wiring to allow space for the fresh air supply duct. Per Contractor ' s proposal dated October 28 , 1985, copy attached. Add $ 162. 00 Item No. 12 : Provide and install Distribution Panels 1/M and 2J. These were shown on drawings and specified as being installed as a part of Phase II Work which was not true. Per Contractor ' s proposal dated October 28 , 1985, copy attached. Add $ 2 ,865. 00 ATTACHMENT - Change Order No. E-1 Page 3 of 4 Item No. 13 : In Rooms D. 02 and D. 03, install in each room two (2) Progress P6690-30 white semi-recessed eyeball lighting fixtures. Switch with SS-2 . Relocate one D3 fixture as directed. Per Contractor ' s proposal dated October 28 , 1985, copy attached. Add $ 682 . 00 Item No. 14 : At future elevator equipment room, disconnect and relocate existing conduit as necessary to feed ceiling fixture B-4 and supply new wall outlet and switch, all in accordance with Architect ' s Drawing A-105 dated September 3 , 1985, copy attached. Per Contractor ' s proposal dated October 28 , 1985, copy attached. Add $ 120. 00 Item No. 15 : Provide electrical wiring for Roof Top Units RTU-2 , 3 and 4 . (Drawings showed this as Phase II Work which it was not. ) The labor on this extra is on an hourly basis not to exceed the stated amount. A future change order will adjust the $1, 982 . 00 labor cost based on submittal time records. Per Contractor ' s proposal dated October 28 , 1985 and breakdown dated October 30, 1985, copy attached. Add $ 3 , 958 . 00 Item No . 16 : Install track lighting system in Room C. 04 in accordance with Architect' s 20 November 1985 letter, copy attached. Per Contractor' s proposal dated November 25 , 1985, copy attached. Add $ 1, 300 . 00 ATTACHMENT - Change Order No. E-1 Page 4 of 4 Item No. 17 : Install conduit system for wheelchair controls per Architect ' s 31 October 1985 letter, copy attached. Per Contractor' s proposal dated November 25, 1985, copy attached. Add $ 407. 00 Item No. 18 : Provide two ceiling outlets for future decorate fixtures, one in Room C. 01 and one in Room C. 04 per Architect ' s letter dated 20 November 1985, copy attached. Per Contractor ' s proposal dated November 25, 1985, copy attached. Add $ 739. 00 Item No. 19 : Room C. 10, revise conduit and wiring to eliminate the existing LB condulet at base level , north wall. Per Contractor ' s proposal dated November 27 , 1985, copy attached. Add $ 106. 00 NET CONTRACT CHANGE, ADD $10 ,498 . 00 ITEMS No,Z, 3 Yytooldal MEYER ELECTRIC INC. N2092 County G CHILTON, WISCONSIN 53014 (414) 849-4707 July 25, 1985 Yarbro-Kempinger Architects, Inc. 1018 W. South Park Avenue P. 0. Box 2096 Oshkosh, WI 54903 REF: The Grand Opera House Oshkosh, WI Attn: Bob Yarbro In response to your letter of July 11, 1985 and the meeting of July 19, 1985 with some of the board members, we are pleased to quote you on the following items. Our proposal is as follows: C ITEM N . I NnT USE0 1N THI5 CI-}AW6E Roth. Item #2 - Relocate the dimmer location from Room B.06 as shown to the east wall of Room C.09. Omit feeders from panel DPjDIM. All conduit stubbed through common wall of Room C.09 and Room D. 10 state. All material and labor will comply with national, state and local codes. WE PROPOSE to furnish labor and material — complete in accordance with above specifications, and subject to conditions found on both sides of this agreement, for the sum of: dollars ($ ). Payment to be made as follows: ACCEPTED. The above prices, specifications and conditions are satisfac- Respectfully submitted, tory and are hereby accepted. You are authorized to do the work as specified. Payment will be made as outlined above. (Read reverse side). MEYER ELECTRIC INC. Date of Acceptance By By By Note:This proposal may be withdrawn by us if not accepted within days. 11E tY1 5 No, L,5 Ayeedaff MEYER ELECTRIC INC. N2092 County G CHILTON, WISCONSIN 53014 (414) 849-4707 Page 2 The Grand Opera House Oshkosh, WI Deduct from Contract - $ 4,500.00 Item #3 - HVAC fan shut down system to individual units - extend emergency circuit to RTU-1, 2, 3, and 4 AHV-1 and orchestra pit heating system. Add to Contract - $ 2, 200.00 May we have an answer to the above items as soon as possible so we can proceed with our work. If you have any questions, please feel free to call. WE PROPOSE to furnish labor and material — complete in accordance with above specifications, and subject to conditions found on both sides of this agreement, for the sum of: dollars ($ ). Payment to be made as follows: Monthly progress payment to be made the same as contract. ACCEPTED. The above prices, specifications and conditions are satisfac- Respectfully submitted, tory and are hereby accepted. You are authorized to do the work as specified. Payment will be made as outlined above. (Read reverse side). MEYER ELECTRIC INC. Date of Acceptance By By By Note:This proposal may be withdrawn by us if not accepted within 15 days. ITEM NO . if tWetrie-Jai MEYER ELECTRIC INC. N2092 County G CHILTON, WISCONSIN 53014 (414) 849-4707 September 24, 1985 Yarbro Kempinger Architects, Inc. 1018 West South Park Avenue Oshkosh, WI 54903 REF : Grand Opera House Oshkosh, WI Attn: Bob Yarbro Per your letter of September 19, 1985, we are pleased to quote you on the following: Delete *gawp N3 type fixtures/in the ceilings of the east and west box seats, a total of ftemw fixtures. j�j`o •oo Deduct $ If you have any questions, please feel free to call. C4a1 /Z.. yG -o �� o t o -0 9/is WE PROPOSE to furnish labor and material — complete in accordance with above specifications, and subject to conditions found on both sides of this agreement, for the sum of: dollars ($ ). Payment to be made as follows: ACCEPTED. The above prices, specifications and conditions are satisfac- Respectfully submitted, tory and are hereby accepted. You are authorized to do the work as specified. Payment will be made as outlined above. (Read reverse side). MEYER ELECTRIC INC. Date of Acceptance // By By 1 ' c---L-. 71(�.' By Note:This proposal may be withdrawn by us if not accepted within .� days. I TEM ■ o. 5` eAtileMar MEYER ELECTRIC INC. N2092 County G CHILTON, WISCONSIN 53014 (414) 849-4707 September 17, 1985 Yarbro-Kempinger Arthitects, Inc. 1018 W. South Park Avenue P. 0. Box 2096 Oshkosh, WI 54903 REF : The Grand Opera House Oshkosh, WI Attn: Bob Yarbro With reference to your letter dated September 6, 1985 requesting a proposal for the following: Main House Ceiling, Level G, Sheet No. E-7: Omit the four (4) H3 fixtures adjacent to main chandelier C5. The above proposal would involve a deduct of $550.00. If you have any questions, please feel free to call. WE PROPOSE to furnish labor and material — complete in accordance with above specifications, and subject to conditions found on both sides of this agreement, for the sum of: dollars ($ ). Payment to be made as follows: ACCEPTED. The above prices, specifications and conditions are satisfac- Respectfully submitted, tory and are hereby accepted. You are authorized to do the work as specified. Payment will be made as outlined above. (Read reverse side). MEYER ELECTRIC INC. Date of Acceptance By By C ✓ 1 l l' G1--L/ By Note:This proposal may be withdrawn by us if withm not/acce accepted P cle days. ITEM No . CO Yityiedar MEYER ELECTRIC INC. N2092 County G CHILTON, WISCONSIN 53014 (414) 849-4707 September 17, 1985 Yarbro-Kempinger Architects, Inc. 1018 W. South Park Avenue P. 0. Box 2096 Oshkosh, WI 54903 REF : Grand Opera House Oshkosh, WI Attn: Bob Yarbro We are please to quote you on a proposal for the following: Rooms C.06 and C. 08 i. Delete the El Swag fixture in each of the rooms as defined in the lighting fixture schedule. Delete 1 fixture outlet box and 2 fixtures in each room. 2. In Room C.06, install new wall bracket fixtures E1 A, one centered over each lavatory, wall mounted at 6' 6" to centerline of the box above finished floor. Three El-A fixtures are required. 3. In Room C.08, install new wall bracket mfixtures stEl'B, one centered over each lavatory, to centerline of the box above finished floor. Three El-B fixtures are required. WE PROPOSE to furnish labor and material — complete in accordance with above specifications, and subject to conditions found on both sides of this agreement, for the sum of: One thousand one hundred thirty five dollars ($ 1, 135.00 ). Payment to be made as follows: ACCEPTED. The above prices, specifications and conditions are satistac- Respectfully submitted, tory and are hereby accepted. You are authorized to do the work as specified. Payment will be made as outlined above. (Read reverse side). MEYER ELECTRIC INC. Date of Acceptance By By Note:This proposal may a withdrawn by us it not accepted within 30 days. ITEM Nei 7 Ari Mai MEYER ELECTRIC INC. N2092 County G CHILTON, WISCONSIN 53014 (414) 849-4707 November 25, 1985 Yarbro-Kempinger Architects, Inc. 1018 South Park Avenue Oshkosh, WI 54903 REF: Revised September 19 letter - future main chandelier winch Per our proposal dated September 24, 1985, following is the revised proposal for the future main chandelier winch. Add a conduit system for controlling a future main chandelier winch. The conduit system in Phases III-IV will consist of a two gang flush mounted outlet box in the north wall of lighting control room, G.05 and a two gang box in the attic upper truss work above the chandelier location. Connect the two boxes with a 3/4" conduit run. Pro*ide a 3/4" conduit for future feeder from panel 2/J in Room G.04 to the two gang box in Room G.05. $ 670.00 If you have any questions, pleaee feel free to call. WE PROPOSE to furnish labor and material — complete in accordance with above specifications, and subject to conditions found on both sides of this agreement, for the sum of: Six hundred and seventy dollars ($ 670.00 ). Payment to be made as follows: ACCEPTED. The above prices, specifications and conditions are satisfac- Respectfully submitted, tory and are hereby accepted. You are authorized to do the work as specified. Payment will be made as outlined above. (Read reverse side). MEYER ELECTRIC INC. Date of Acceptance. By By By Note:This proposal may be withdrawn by us it not cep ted within days.Y ITEM NO. eWeerledal MEYER ELECTRIC INC. N2092 County G CHILTON, WISCONSIN 53014 (414) 849-4707 September 25, 1985 Yarbro-Kempinger Architects, Inc. 1018 W. South Park. Avenue P. 0. Box 2096 Oshkosh, WI 59903 Attn: Bob Yarbro REF: Grand Opera House Oshkosh, WI Per your letter of September 23, 1985 in which you request a proposal for the following: Add 3 McPhilben 43A 9213 PB fixtures with lamps Glait 3 R3 Omega fixtures with lamps Deduct $100. 00 If you have any questions, please feel free to call. WE PROPOSE to furnish labor and material — complete in accordance with above specifications, and subject to conditions found on both sides of this agreement, for the sum of: dollars ($ ). Payment to be made as follows: ACCEPTED. The above prices, specifications and conditions are satisfac- Respectfully submitted, tory and are hereby accepted. You are authorized to do the work as specified. Payment will be made as outlined above. (Read reverse side). MEYER ELECTRIC INC. Date of Acceptance By By _. L010► By Note:This proposal may be withdrawn by us if not accepted withino,9O days. I T' isoi tWegyiedati MEYER ELECTRIC INC. N2092 County G CHILTON, WISCONSIN 53014 (414) 849-4707 October 28, 1985 Yarbro-r:empinger Architects, Inc. 1018 W. South Park Avenue Oshkosh, WI 54903 Attn: Bob Yarbro REF : Exterior soffit lighting With reference to your letter dated October 16, 1985 requesting a proposal for the following: Installation of 3 additional fixtures - exterior soffit lighting 4, 949. 00 If you have any questions, please feel free to call. WE PROPOSE to furnish labor and material — complete in accordance with above specifications, and subject to conditions found on both sides of this agreement, for the sum of: Nine hundred forty mine dollars ($ 949. 00 Payment to be made as follows: ACCEPTED. The above prices, specifications and conditions are satisfac- Respectfully submitted, tory and are hereby accepted. You are authorized to do the work as specified. Payment will be made as outlined above. (Read reverse side). MEYER ELECTRIC INC. Date of Acceptance By By Note:This proposal may a withdrawn by us if not�acce ted 7 Y p within�� days. ITEM WO. j 0 • YiecOoda," MEYER ELECTRIC INC. N2092 County G CHILTON, WISCONSIN 53014 (414) 849-4707 October 28, 1985 Yarbro-Kempinger Architects, Inc. 1018 W. South Park Avenue Oshkosh, WI 54903 Attn: Bob Yarbro REF: Electric baseboard heating units With reference to your letter dated October 2, 1985 requesting a proposal for the following: Room C . 01 - Ticket Sales: ,Change one 8'-0' long unit to one :L 5'-0'' long and one 3' -0" long. Mount the 5' -0" unit where originally shown and the 3'0''° long unit on the landing - west wall. Room D. 09 - Vestibule: Change one 8' 0" long unit to one 5' -0" long mounted on the north wall and one 3'-0 long mounted on the south wall. Room F. 06 - Storage: Change the 8'-0' unit to 6 '-0" and mount on the east wall adjacent to the return duct - but not touching. Room F. 07 - Vestibule: Change the 6 '-0 long unit to two 31 -0" long each, one mounted on the north wall and one on either the east or west wall. A connection between units and around the corner may be exposed wire mould. If you have any questions, please feel free to call. WE PROPOSE to furnish labor and material — complete in accordance with above specifications, and subject to conditions found on both sides of this agreement, for the sum of: Five hundred and five dollars ($ 505.00 ). Payment to be made as follows: ACCEPTED. The above prices, specifications and conditions are satisfac- Respectfully submitted, tory and are hereby accepted. You are authorized to do the work as specified. Payment will be made as outlined above. (Read reverse side). MEYER ELECTRIC INC. Date of Acceptance r , By By `/` _j �' ) By Note:This proposal may be withdrawn by us if not cepted within days. I-El-A H°. ►1 . Yiet0Mar MEYER ELECTRIC INC. N2092 County G CHILTON, WISCONSIN 53014 (414) 849-4707 October 28, 1985 Yarbro-Kempinger Architects, Inc. 1018 W. South Park Avenue Oshkosh, WI 54903 Attn: Bob Yarbro REF : Air Handling Unit With reference to your letter dated October 9, 1985 requesting a proposal for the following: n •: hanges to the Air Handling Unit AEU-1 control wiring ring in Room B-24 to allow for the fresh air supply AHU-1 to be installed. These changes occur on the north and east walls of that room. 162.00 If you have any questions, please feel free to call. • WE PROPOSE to furnish labor and material — complete in accordance with above specifications, and subject to conditions found on both sides of this agreement, for the sum of: One hundred sixty two dollars ($ 162. 00 ). Payment to be made as follows: ACCEPTED. The above prices, specifications and conditions are satisfac- Respectfully submitted, tory and are hereby accepted. You are authorized to do the work as MEYER ELECTRIC INC. specified. Payment will be made as outlined above. (Read reverse side). Date of Acceptance By By _ Note:This proposal may be withdrawn by us if not accepted withi C)days. By ITEM No. iZ Ayeedai MEYER ELECTRIC INC. N2092 County G CHILTON, WISCONSIN 53014 (414) 849-4707 October 28, 1885 Yarbro - Kempinger. Architects, Inc. 1018 W. South Park Avenue Oshkosh, WI 54903 REF: Panel LM & 2J Attn: Bob Yarbro As discussed the the October 10, 1985 job meeting with reference to Panel 1/N and 2J. Section 16000/7, paragraph 7, electric service and distribution equipment. Existing equipment in place of feeders and distribution panels. We are pleased to quote you for the installation of panel and 2J with all feeders and conduit. 2, 865. 00 If you have any questions, please feel free to call. WE PROPOSE to furnish labor and material — complete in accordance with above specifications, and subject to conditions found on both sides of this agreement, for the sum of: Two thousand eight hundred sixty five dollars ($ 2, 865. 00 ). Payment to be made as follows: ACCEPTED. The above prices, specifications and conditions are satisfac- Respectfully submitted, tory and are hereby accepted. You are authorized to do the work as specified. Payment will be made as outlined above. (Read reverse side). MEYER ELECTRIC INC. Date of Acceptance By By By Note:This proposal may be withdrawn by us if not accept d within0 days. ITEM r/rO, 13 eAtyze-Ja# MEYER ELECTRIC INC. N2092 County G CHILTON, WISCONSIN 53014 (414) 849-4707 October 28, 1985 Yarbro-Rempinger Architects, Inc. 1018 Sputh Park Avenue Oshkosh, WI 54903 Attn: Bob Yarbro REF : Alcove - West and East With reference to your letter dated October 9, 1985 requesting a proposal for the following: Rooms D. 02 and d/03, Alcoves west and east. At each fireplace, add two ( 2) Progress P6690-30 white Eyeball - Semi-Recessed Fixtures in the ceiling at 24" out from the fireplace wall. Switch with SS- 2. Relocate one D3 fixture in each space as determined on the job. $ 682.00 If you have any questions, please feel free to call. WE PROPOSE to furnish labor and material — complete in accordance with above specifications, and subject to conditions found on both sides of this agreement, for the sum of: Six hundred eighty two dollars ($ 682. 00 ). Payment to be made as follows: ACCEPTED. The above prices, specifications and conditions are satisfac- Respectfully submitted, tory and are hereby accepted. You are authorized to do the work as specified. Payment will be made as outlined above. (Read reverse side). MEYER ELECTRIC INC. Date of Acceptance By By 1 �� % ./ By Note:This proposal may be withdrawn by us if not acc ed within} 'Odays. ITEM ND . ! _ • eWetyieldal MEYER ELECTRIC INC. N2092 County G CHILTON, WISCONSIN 53014 (414) 849.4707 October 28, 1985 Yarbro-Kempinger Architects, Inc. 1018 W. South Park Avenue Oshkosh, WI 54903 Attn: Bob Yarbro REF : Wiring for elevator equipment room With reference to your letter dated September 10, 1985 requesting a proposal for the following: Disconnect and relocate conduit as necessary to feed ceiling fixture B-4 and supply new wall outlet and switch. (As per drawing Sheet No. A-105) x120. 00 If you have any questions, please feel free to call. WE PROPOSE to furnish labor and material — complete in accordance with above specifications, and subject to conditions found on both sides of this agreement, for the sum of: dollars ($ ). Payment to be made as follows: ACCEPTED. The above prices, specifications and conditions are satisfac- Respectfully submitted, tory and are hereby accepted. You are authorized to do the work as specified. Payment will be made as outlined above. (Read reverse side). MEYER ELECTRIC INC. Date of Acceptance " ‘7, 77—U,/ By Note:This proposal may be withdrawn by us if not accepted withirr--/ days. )T 1,1 o- Ill 1r 4.'"....?•Q74•••.**.enii;t1r7•;•ii;;.L..•1;17,1.;:::1•A'''''' -' ...IL,.,.., , 4f:' '. ''';""'''''—''' ./' ' ' . '''.. " .'';''' .. . - : r'":“., •'.' • ,,,..10.. '. : ... ., - .. •t., .C :„'•••••• ..'.."• , •N'•••••ji, • .., ,•,./.,,,,,..„ ,s -.. . :-, „.,% -• • • ' *4w,-* .. • , ..1.^,, j ;...... •, -•- • •-• ' '„ •....."••• ••,• - - - '• ••"*".1 • ',.•, •'-',, ,..0;',•,.. .,,...,:. - 4 P.i 0 ,,------- AL • ,*,,,, . ) A-05 I A -07 4...„, ;,1/.' • , J . ,.. , . 1--- - _ cA,__ _Z 0:—.1 r _ _ __ 1 1 • ________x-. 1 lr) 0,1 1 Ash' .. ,1 .I (%_...._------ Illir,:r-41115 :11-----t r - * (9 ) o, 9 ,.. • '41.125:1 4•,',A. - .; •••.. ' -• • •;•: t^-"rr• .„:. '...0 .d"...;.:-.<7..:'*. : ... ,, .• . 1 I , L flu $ 'V 15 c k ... 14 , 10 C I , z._ 1 ois 1 f41'•1',.. i 1 • ___4. r I , )(t 1 r ' . ■■•• 4) . i N. 1 6 • ,4 y, -- W. ,',--- 1 1 j f • if ,-4 4411.1 ' 1/4 i'•4 . 's 4A'sti es.•..e■ ■,1,. . 4 ‘...4211,-, , •‘41:10`.-- ■'1,, , r• ' ' 1 I- i-h .14 I ,..„. • s? 1 I :.1.-.);, ;. .,.., ... ,• ......- 1 1_ • -4, .•• •••• ••••••• o—- SP / -fib LETTER- . — -,- 1 12-0 pk-re17 8-3—0 FM- EiPLANNTION 7 Of evymeoL6 •..,-,,,- ..i''','..,,41 ' -ii., r,OF0(9" bE) EOLIFTMENT P)0011 — 46.1...E YARBRO—KEMPINGER ARCHITECTS , INC. PHASES III & IV PFALLER IIERBST ASSOCIATES , INC. RESTORATION & REHABILITATION FILE NO. 8133/79005 THE GRAND OPERA HOUSE . SHEET NO. A- 105 DATE: .1'1, 3 ,195r:; OSHKOSH, WISCONSIN • ITEM .(o. I c MEYER ELECTRIC INC. N2092 County G CHILTON, WISCONSIN 53014 (414) 849-4707 October 28, 1985 Yarbro-Xempinger Architects, Inc:. 1018 4. South Park Avenue Oshkosh, WI 5i903 Attn: Sob Yarbro REF : Wiring for Roof Top Units With reference to your letter dated October 9, 1985 requesting a proposal for the following: Wiring for Roof Top Units RTU-2, 3, and 4. 3, 958. 00 If you have any questions, please feel free to call. WE PROPOSE to furnish labor and material — complete in accordance with above specifications, and subject to conditions found on both sides of this agreement, for the sum of: Three thousand nine hundred fifty eight dollars ($ 3, 958. 00 ). Payment to be made as follows: ACCEPTED. The above prices, specifications and conditions are satisfac- Respectfully submitted, tory and are hereby accepted. You are authorized to do the work as specified. Payment will be made as outlined above. (Read reverse side). MEYER ELECTRIC INC. Date of Acceptance By By j By Note:This proposal may be withdrawn by us if not accepted within`()days. , TEA, yo, n; MEYER ELECTRIC INC. Electrical Contractors COMMERCIAL-RESIDENTIAL-INDUSTRIAL 37444adirAla N2092 County G Phone(414) Chilton, Wi. 53014 849-4707 October 30, 1985 Yarbro-Kempinger Architects, Inc. 1018 W. South Park Avenue Oshkosh, NI 54903 ATTN: Bob Yarbro REF; Proposal dated 10/28/85 - Wiring for Roof Top Units Dear Bob: Per your phone conversation of October 29, 1985 requesting a breakdown for the above proposal. The breakdown is as follows: Equipment $ 1, 037. 00 Conduit & Wire 892. 00 Labor 1, 982.00 Bond 47. 00 $ 3, 958. 00 If you have any questions, please feel free to call. Sincerely yours, MEYER ELECTRIC, INC. (L)(A-p/ 7Zerl h?? Lloyd Meyer LM/mc I TEiM eWeeletUar MEYER ELECTRIC INC. N2092 County G CHILTON, WISCONSIN 53014 (414) 849-4707 November 25, 1985 Yarbro-Kempinger Architects, Inc. 1018 W. South Park Avenue Oshkosh, WI 54903 Attn: Bob Yarbro REF: Track Lighting With reference to your letter dated November 20, 1985 requesting a proposal for the following: Installation of Track lighting system - Room C. 04 $ 1, 300.00 If you have any questions, please veel free to call. WE PROPOSE to furnish labor and material — complete in accordance with above specifications, and subject to conditions found on both sides of this agreement, for the sum of: One thousand three hundred dollars ($ 1,300.00 ). Payment to be made as follows: ACCEPTED. The above prices, specifications and conditions are satisfac- Respectfully submitted, tory and are hereby accepted. You are authorized to do the work as specified. Payment will be made as outlined above. (Read reverse side). MEYER ELECTRIC INC. Date of Acceptance By By By Note:This proposal may . withdrawn by us if not sUcepted within 30 days. yarbro-kempinger architects, inc. in as pfaller pfaller herbst associates, inc. 1018 WEST SOUTH PARK AVENUE.BOX 2096,OSHKOSH,WISCONSIN 54903 210 EAST MICHIGAN STREET, MILWAUKEE,WISCONSIN 5: TELEPHONE (414)235-3310 ARCHITECTS/PLANNERS TELEPHONE (414)271.11 ITEM 110 20 November 1985 Mr. Lloyd Meyer Meyer Electric , Inc. N2092 County G Chilton, Wisconsin 53014 RE : File 8133/79005 - Phases III & IV Restoration and Rehabilitation The Grand Opera House City of Oshkosh, Wisconsin Mr. Meyer : Please submit a proposal for a track lighting system to accent the Needlepoint Rug which will hang on the west wall of Lobby, Room C. 04 . See the enclosed copy of Drawing No. A-111 . Track Lighting System: Room C. 04 1. Center the track on the carpet width. 2. Mount the track on the vertical surface of the dropped beam and facing the west wall . Cut the power cover plate as re- quired so that the plate and track fit between the bottom of the ceiling crown mold and the soffit of the dropped beam. 3. The track is to be Progress TRAK-1, 120 V, 20 amp, Polished Brass., total length of 12 ' -0" (one 8 foot starter track and one 8 foot joiner track out to proper length) . 4 . Five (5) Progress P-6298-10 track fixtures, Polished Brass Finish. Lamp with 150 watt PAR-38 Spots. 5. Provide a separate 20 amp circuit with a 1000 watt dimmer. Locate the dimmer in the lighting control panel, Room C. 15. FOR THE GRAND OPERA HOUSE OSHKOSH, WISCONSIN Page 2 ITEM I, 20 November 1985 Mr. Lloyd Meyer RE : File 8133/79005 - Phases III & IV The Grand Opera House I have advised Scott Meyer of the above and he is making advance preparations for the track lighting system. A reply in time for the December 3 Board Meeting would be good. Sincerely, YARBRO-KEMPINGER ARCHITECTS, INC. and PFALLER HERBST ASSOCIATES , INC. by /2e)i-Lf Robert L. Yarbro RLY/mh Enc. c : Mrs. Lynne Webster Mrs. Betty MacNichol Chuck Lamine Mark F. Pfaller II Gordon Petzold w/copy of Drawing A-111 I TEN? 117 eAgyzedaff MEYER ELECTRIC INC. N2092 County G CHILTON, WISCONSIN 53014 (414) 849-4707 November 25, 1985 Yarbro-Kempinger Architects, Inc. 1018 W. South Park Avenue Oshkosh, WI 54903 Attn: Bob Yarbro REF : Revised Wheel Chair Lift With reference to your letter dated October 31, 1985 requesting a proposal for the following: Revised Wheel Chair Lift $ 407.00 If you have any questions, please feel free to call. WE PROPOSE to furnish labor and material — complete in accordance with above specifications, and subject to conditions found on both sides of this agreement, for the sum of: Four hundred and seven dollars ($ 407.00 ). Payment to be made as follows: ACCEPTED. The above prices, specifications and conditions are satisfac- Respectfully submitted, tory and are hereby accepted. You are authorized to do the work as specified. Payment will be made as outlined above. (Read reverse side). MEYER ELECTRIC INC. Date of Acceptance By By By Note:This proposal may be ithdrawn by us if not acc ted within 30days. yarbro-kempinger architects, inc. in aswithatlan pfaller herbst associates, inc. 1018 WEST SOUTH PARK AVENUE.BOX 2096,OSHKOSH,WISCONSIN 54903 TELEPHONE(41a1 235-3310 210 EAST MICHIGAN STREET,MILWAUKEE,WISCONSIN ARCHITECTS PLANNERS TELEPHONE (414)271 i rEf 7 ) �7 31 October 1985 Mr. Lloyd Meyer Meyer Electric, Inc. N2092 County G Chilton, Wisconsin 53014 RE : File 8133/79005 - Phases III & IV Restoration and Rehabilitation The Grand Opera House City of Oshkosh, Wisconsin Lloyd : We have verified with both Gordon Petzold ' s office and Sam Phillips of DILHR Elevator Section that the disconnect device for motor outlet No. 13 , Chair Lift, Room C. 04 , can be a single pole 20 amp rated toggle switch with a red painted cover plate. The extra work related to the chair lift consists of the three pull boxes, the lower landing control station box and the interconnecting z" conduit, the toggle disconnect and service to the pull box from the toggle disconnect. Please resubmit your proposal for this work. Sincerely, YARBRO-KEMPINGER ARCHITECTS , INC. and PFALLER HERBST ASSOCIATES , INC. by Robert L. Yarbro RLY/mh c : Gordon Petzold Mark F. Pfaller II FOR THE GRAND OPERA HOUSE OSHKOSH, WISCONSIN 7E-NI 18 tWeeRfridate MEYER ELECTRIC INC. N2092 County G CHILTON, WISCONSIN 53014 (414) 849-4707 November 25, 1985 Yarbro-Kempinger Architects, Inc. 1018 W. South Park Avenue Oshkosh, WI 54903 Attn: Bob Yarbro REF: Two Handing fixtures With reference to your letter dated November 20, 1985 requesting a proposal for the following: Two Hanging decorative fixtures Room C.01 - Ticket Booth Room C. 04 - Above window seat area $ 739.00 If you have any questions, please feel free to call. WE PROPOSE to furnish labor and material — complete in accordance with above specifications, and subject to conditions found on both sides of this agreement, for the sum of: Seven hundred thirty nine dollars ($ 739.00 Payment to be made as follows: ACCEPTED. The above prices, specifications and conditions are satistac- Respectfully submitted, tory and are hereby accepted. You are authorized to do the work as specified. Payment will be made as outlined above. (Read reverse side). MEYER ELECTRIC INC. Date of Acceptance By By J �1cst/ pv� By Note:This proposal may e withdrawn by us if not 9t cepted within 3Oda Y s. yarbro-kempinger architects, inc. in asw°;nat`°" pfalier herbst associates, inc. 10 8 WEST SOUTH PARK AVENUE. BOX 2096.OSHKOSH,WISCONSIN 54903 TELEPHONE 14141 235-3310 ARCHITECTS/PLANNERS 210 EAST MICHIGAN STREET,MILWAUKEE.WISCONSIN 5320. TELEPHONE(414)271-535' 20 November 1985 I C M 8 Mr. Lloyd Meyer Meyer Electric, Inc. N2092 County G Chilton, Wisconsin 53014 RE: File 8133/79005 - Phases III & IV Restoration and Rehabilitation The Grand Opera House City of Oshkosh, Wisconsin - Mr. Meyer : The Historical Decoration Committee has agreed with my recom- mendation that two hanging decorative fixtures should be added at the subject project. You are required to provide a ceiling outlet at each location and a single 600 watt dimmer in the control cabinet. If necessary, provide a feed circuit from Panel 1/D. Locations for these outlets are as follows : Room C. 01 - Ticket Booth: In the flat ceiling area at the top of the curved ceiling, centered on the south window. Room C. 04 - Above the window seat area in the flat ceiling area at the top of the curved ceiling, centered on the south window. A proposal for this work in time for the 3 December Board Meeting would be helpful. Sincerely, YARBRO-KEMPINGER ARCHITECTS , INC. and PFALLER HERBST ASSOCIATES , INC. by 41411‘ / °4-4° Robert L. Yarbr RLY/mh c : Mrs. Lynne Webster Mrs. Betty MacNichol Chuck Lamine Mark F. Pfaller II Gordon Petzold FOR THE GRAND OPERA HOUSE OSHKOSH, WISCONSIN STEM i 5 eWeeyeedar MEYER ELECTRIC INC. N2092 County G CHILTON, WISCONSIN 53014 (414) 849-4707 November 27, 1985 Yarbro-Kempinger Architects, Inc. 1018 W. South Park Avenue Oshkosh, WI 54901 REF: Grand Opera House Attn: Bob Yarbro Per request from Bob Yarbro, we are submitting the following proposal: Remove LB condulet as requested in Romm C10 $ 106.00 If you have any questions, please feel free to call. WE PROPOSE to furnish labor and material — complete in accordance with above specifications, and subject to conditions found on both sides of this agreement, for the sum of: One hundred and six dollars ($ 106.00 ). Payment to be made as follows: ACCEPTED. The above prices, specifications and conditions are satistac- Respectfully submitted, tory and are hereby accepted. You are authorized to do the work as specified. Payment will be made as outlined above. (Read reverse side). MEYER ELECTRIC INC. Date of Acceptance By By — �-� .L • — .AIM By Note:This proposal may be withdrawn by us if not accepted within 30days.