HomeMy WebLinkAboutPW CNT 85-01/CHG OR 1 Tu: Donna Serwas, City Clerk
From: Gerald Konrad , Director of Public Works
Date: May G. 1986
Si CONTRACT CENTENNIAL CONTRACTORS INC.
Attached please find the original copy of Notice of Intent to
File a Lien against subject contract -from PTS Contractors Inc.
c. c. : Ed Nokes
John Pence
George Russell
__ __ _
FORM 881 LIEN NOTICE Wisconsin Legal Blank Co.. Inc.
Section 779.02 (2) (b)
Milwaukee, Wis.
LIEN NOTICE
May 5 , 1986 , 19
FILED
TO: City of Oshkosh
(Owner or Authorized Agent) MAY 0 81986
215 Church Avenue
CITY CLERK
OSHKOSH, WIS.
Oshkosh, WI 54902-1130
(Address)
As a part of your construction contract, your contractor or builder has already advised you that those who furnish
labor or materials for the work will be notifying you.
You are hereby notified, that the undersigned first furnished labor or materials on 2/20/8 6, 2,23/86,
3/3/86 & 3/10/86 , 19 , for the improvement now under construction on your real estate at
Contract I - 85-01 - Sewer Interceptor
(Legal Description or P. O. Address of job)
in the amount of X4, 260 . 00 against Centennial Contractors , Inc . -
-General -Contractor - 70 West County Road "C" - Little Canada, MN 55117
Please give your mortgage lender the extra copy of this notice within ten (10) days after you receive this, so your
lender will also know that the undersigned is included in the job.
PTS Contractors , Inc .
Name
■
By: Signature
Hubert J. Jos i , V. President
Route 3 , Cty. Trk. "JJ"
Street Address
Green Bay, WI 54301
City or Town State
SECTION 779.02 (2) (B) —THIS NOTICE MUST BE GIVEN WITHIN 60 DAYS AFTER FURNISHING FIRST LABOR OR MATERIALS, IN TWO
(2) SIGNED COPIES BY PERSONAL SERVICE OR REGISTERED MAIL WITH RETURN RECEIPT REQUESTED.
-c."-
�:anoe Order wc. J. .1anuary ..::::" l986
Contract wo. 85-01
�
�
/
Owner: City of Dsnxosn /
Contractor: Centennial Contractors Corporation ,/
7:.ngineer: r.owaro wee0les Tammen & ,E5leroendoff
Contract wo. 85-014 Sewer ^nterceotor. is nereoy amended ano cnangeo as
fo| iows:
Item No. � (See Attached) Nil! Change In Cost $0. 00
Item No. 2 (See Attached) Increase Cost $5. 496. 93
item mo. 3 (See Attacned) mo Change In Cost $0. 00
Item No 4. (See Attached.: Increase Cost $13, 692. 12
Iten wo. 5 (See Attached) Increase Cost *3. 2c:0. 69
ILen No 6 (5ee Attached) Increase Cost $29. 450. 74
:..till:..till No. 7 (S $� 0W ee �t�a�heo/ No Lnange .
Item No. 8 (See Attached) No Cnano $0 00 e ~
I',- em No. 9 (See Attacned" Increase Cost $3, 446. 78
:tem No. 10 (See Attached) Increase Cost $2, 288. 73
�tew mo. z1 (See Attached) Decrease Cost (Credit ) (-$8. 746. 56)
Item Mo. 12 (See Attached) Decrease Cost (Credit ) (-$19. 436=80)
Total $29. 412. 83
----------------- ---------- �2 215 z95 0@
3rioinal Amount of Cont~act , , -
` otal Amount of Previous Change Orders to Date $0. 00
____________
Previous Ao:lusted Contract Amount $2_ 2-15, 195. N0
Change Order No. 1 :Amount , .
_ __________
Totai Amount of Corrent; Contract I no.luoino C. O. No. .i. $2, 244, 607. 83
__ ________
RECGMMENDED:
-
' • ="- 2� '
�v:
_ .
Irector of o� c worxs �ity wanager
)
-- _ LA .
City (-Jerk
. . -
.... ^--
, ,,.'...^�� tr. ' , 1 t c..... ,--":,;,<' ---" -�---
Aoorcw4 0 and Accepted
Centennial Construction Corp.
I certify tnat orovision nas been mane to oay the lianility that wzli
accrue to the City of Osnkosn, wisconsin, unoer the within Change Droer.
,,, i . '
-�,����� (� (,
1: Comptroller
Ilb -
' ' -
Czty Att Orr e�
Change Oroer No.
_ , Page 2
�ontract *o. 85-01, Sewer Interceptor
Item Ne, :i - Centennial Contractors proposed to install the sewer
interceptor tnrough tne Ohio St. Right of way oy Jacking in lieu of the
sPecifieo ooen out metnod. Centennial requested an increase in tne
contrazc amount of 122, 00 order to instai 'l tne oioe via Jacxkng.
The City of Oshkosn elected to have Centennial install the pioe via the
open cut metnod as bid. Sc! cnange in toe contract amount or time is
therefore necessary.
Item No. 2 - This item is for the extra time and material cost reouired
to install the interceptor sewer between M. H. i-22 to m. hi. 1-20 at a
lower elevation than shown on the contract plans. The lower elevation
was reouired because the invert of the existing sewer at the wastewater
treatment plant was found to be 1. 34 feet lower than the as built
elevation shown on the contract orawings' This item resulted in an
increase cost of $5, 496. 93.
Iterl! N5:?.,_ 3 - This item is for field modifications to Junction Cnamber 1-
22. Centennial requestec that the Chamber oe snifteo 1 foot to tne east
so that the walls of the chamber could be constructed orior to the
removal of the existing east wail of the existing mannole. Tnis change
was approved at no cnange in the contract amount or time.
can Nc 4 - This item ie for extra work required oue to the hiooen poor
c000itions of the existing 34° x 53" discharge line from toe wastewater
treatment plant. The line had to be removed from service curing
installation of the new interceptor because of wide ooen joints between
existing pioe seIT:ents. This admitional work item, including encasement
cf te rep^aceo line in concrere, resuiteo in an increase in cost of
$13, 692, i2.
Item No. 5 - Tnis item is for extra work required to remove ano replace
an existing 6" water main in Dempsey Trail. Tne existing main was not
soown on the contract brawings. The location of the main necessitated
its removal and replacement during construction of tne new ,nterceotor.
This item resulted in an increase in cost of $3, 220. 89.
Item No. 6 - This item is for the extra work required to install the new
interceptor in the vicinity of M. H. 1-18. Tnere was an existing 20inch
water main and 8inch connecting main that were not shown on the contract
crawings. The locations of these mains was such that the interceotor nao
to be installed by Jacking in lieu of ooen cutting. This work resulted
in an increase in cost of $29, 450. 74.
‘ '
Change Order No. l Page 3
Contract No. 85-01 , Sewer interceptor
Item No. 7 - Centennial Contractor' s submitted a claim an tne amount of
$702. 35 for delays encountered oue to an aoandoneo storm sewer wnzch was
not shown on the contract drawings' Immediately after encountering the
s:o'er sewer Centrnniai encountered ano oro^e an electric service which
was shown on the contract orawinqs. The power company would not allow
Centennial to oroceeo until the reoazrs were comoleted. [entennzai ` s
claim for the delays due to the abandoned storm sewer were therefore
rejected. No change in the contract amount or time is required by this
item.
Item !:‘;q, 8 - Centennial suomitted a claim in the amount of $1, 669. 39 for
worx required to reinstall a 4incn water service to a ousiness on the
north side of 8th St. between M. H. No. 1-2 and M. H. No. 1-1. This claim
was reJected because tne contract documents require tne contractor to
reinstall any building service which has to be removed. No change in the
contract amount or time is required by this item.
Item Nq. g - This item is for extra excavation, oackfzil; and paving
costs required due to an existing gas main location in 8th St. in the
vzrinity of M. H. No. 1-1. The contract plans showed the gas main along
the north right of way. The gas main was actually near the middle of the
richt of way at M. H. No. 1-1 . The gas main location reouired movement of
the new Junction chamber and associated extra costs. This work resulted
in an increase in cost of $3, 446. 78.
ltem No. 10 - This item is for grading and oaving costs for an additional
321 square yards of bituminous pavement alonc the north side of tne oaveo
right of way between Scutn :N:ain St. art Nebraska Street . Me oavement
was in poor shape pr� or to cons�ruLtior of tne new interceptor. The
pavement immediately aoJacent was being replaced oue to construction
activities associated with the new interceptor. This work resulted in an
increase cost of $2, 288. 73.
Item No. 11 - This item is for a credit to the contract required in oroer
to allow 100 feet of incorrectly placed interceotor sewer to remain in
place immediately east of M. H. No. 1-17. The contractor placed the sewer
at an incorrect slope resulting in a . 34foot elevation error after 100
feet . It was determined that the elevation error could be made up at
another location in the system without adversely affecting the hydraulics
of the system. The credit to the contract for this item is $8, 746, 56
It.pm No, .2 - This item is for a credit to tne contract reouzred in oroer
to allow 168 feet of incorrectly placed interceptor sewer to remain in
place in the vicinity of M. H. No. 1-16. The contractor placed the
sewer off line and at an incorrect slope resulting in elevation errors up
to . 18feet. It was determined that the installation could remain without
adversely affecting the nydraulics of tne system. The credit to tne
contract for this item is $19, 436. 80