HomeMy WebLinkAboutPW CNT 84-01/CHG OR 7 2 Chance Order No. 7 January , 1986 ~/"' , , Contract No. 84+81, Low Lift/High Service Pumoing Station / // ,• / C.wner: City of Oshxosh / Contractor: Fluor Bros. Construction Co. Engineer: Howard Needles Tammen & Bergenooff • Contract No. 84-01, Low Lift/High Service Pumping Station, is hereby amended and changed as follows: $2, 420. 00 Item No 1 (See Attached) Increase Cost ` $819 0N Item No 2 (See Attached) Increase Cost ^ ^ $680 00 Item No. 3 (See Attached) Increase Cost ^ ^ $234 �� Item ho 4 (See Attached) Increase Cost ^ ^ $94 �0 item No. 5 (See Attached) Increase Cost ^ ^ $1, 091. 00 Item No. (See Attached) Increase Cost ^ Item No. 7 (See Attached) Increase Cost Item No^ 8 (See Attached) Decrease Cost ( reo $495. 00 Cit ) (-$670. 00> ^ $592 00 Item No. 9 (See Attached) Increase Cost ^ ^ $73 �0 Item No 10 (See Attached) Increase Cost ^ ^ $2, 015. 00 Item NO. 11 (See Attached) Increase Cost ~ $810 00 Item No 12 (See Attached) increase Cost ^ ~ $201 00 Item No. 13 (See Attached) Increase Cost ^ , $441. 00 Item No. 14 (See Attached) Increase Cost $441 Total $8, 295. 00 ------ - -- ----- Original Amount of Contract $1, 393, 700. 00 Total Amount of Previous Change Orders to Date $40, 785' 00 Previous Adjusted Contract Amount $1, 434, 485. 00 Change Order No. 7 Amount $9, 295. 00 Total Amount of Current Contract Including C. O. ho. 1 $1, 443, 780. 00 __________________________________________ RECOMMENDED: / ' I� By A-71 -- K�/ z ����`---_-- - -- ---� - - ��[�. ' City Manager D11 -ctor of Pubi �= -.r�s y ) __ _~~- __-_______1 City C1erk ���_ ����� � �________ -__ Approved rid Accepted /'^�4.- Fluor Bros. Construction Co. ' I certify that provision has been maoe to pay the liaoility that will accrue to tne City of Oshkosh, Wisconsin, unoer tne within Change Order. ` �` k / _._____-___ Adnrcved As - f Fcirm- Comptroller Januav Contract `+4- ...PacE, V ift /M10n Service �'um:iYG Station Item No, 1 - install a concentric reducer and I ' fitting at tne south end of the new 30" diameter ductile iron line in tne existing north reservoir. Also provide for a watertight installation of the valve operator through tne roof of tne existing north reservoir. i'ne City of Oshkosh will furnish the reducer and ' T' fitting. Item No. 2 - Provide and install seven gate valves between each of the air release valves on the discharge lines of all low lift DUmDS and nigh service p umps. It em No._ 3 - Delete tne galvanized flashing as snawn on the contract drawings at the soldier and rowlock courses along tne south and north parapet wall and provide corregated copper flashing. Item No. 4 - Install aluminum Handrail and cnain at the bottom of tne steps in both high service tanks. Item No. 5 - Provide a bronze aluminum angle at the aluminum door on the south side of the new stat ion. Item No. 6 - Provide steel strapping on the C '+" diameter ductile iron pipe in the existing north reservoir. Item No_ 7 - Provide and install additional structural steel bracing for the exhaust fan platform in the new pump station. Item No. 6 - Provide a credit for deleting the insect screens tnat were to be installed around the exhaust fan platform. The insect screens are not reduired. Item No_ 9 - Provide a credit for deleting the 6' x 12' concrete pad adiacent to the entrance stoop on the north side of tne structure. Install a concrete sidewalk along the east and south sides of the new pump station. • Item No. 10 - Provide and install a 3/4" PVC conduit through tne east wall of the new pump stat ion. The new conduit will be utilized for wiring to a yard light to be installed by City of Oshkosh personnel. Item No. 11 - Provide and install a galvanized coping on tne top of the parapet walls on the north and south sides of the station. Item No_ is - Provide and install two ductile iron piping spool pieces necessary to complete the new piping in the existing filter building gallery. Labor for installing piping to be provided at no additional cast to the contract. Item No 13 - Provide and install additional control wiring to each of the four magmeters on the discharge piping of each high service pump. Item No, 14 -Provide Sika grout to completely fill the void between each low lift discharge pipe and the main, floor slab in the new pump station.