HomeMy WebLinkAboutMiron Construction/Ch Or G-10/steel to frame roof penetrations CHANGE Distribution to: ORDER OWNER ❑ ARCHITECT ❑ AM DOCUMENT G701 CONTRACTOR ❑ FIELD ❑ OTHER ❑ PROJECT: Oshkosh Centre CHANGE ORDER NUMBER: G-10 (name, address) Oshkosh, Wisconsin INITIATION DATE: September 17, 1985 TO (Contractor): ARCHITECT'S PROJECT NO: 1383 E.P. G. Miron Construction Co. ,Inc.l 806 Valley Road CONTRACT FOR:General Project Work - Menasha, WI 54952 Entire Project Li CONTRACT DATE: December 20, 1984 You are directed to make the following changes in this Contract: Provide additional structural steel to frame around roof penetrations. Add $6,075.14 C`� fl.. . Af / 'ttt`r.Ai1O'.EY' � - ,Z.r,..rEcj"fi1S osloos4,W�SGtN t' I 'let: . J . i, (Proposal Attached) Not valid until signed by both the Owner and Architect. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. The original (Contract Sum) (Ertiarartteed- Maximum-East) was $ 3,675,000.00 Net change by previously authorized Change Orders $ (505,893.61) The (Contract Sum) (6uararrteed-M xirrttmrEost) prior to this Change Order was $ 3,169,106.39 The (Contract Sum) {Giraranteed-Maxirrtmi{-nst) will be (increased) (Ttetreased)tunrharged) by this Change Order $ 6,075.14 • The new (Contract Sum) (G uasan-tecaci-Maxiax €est) including this Change Order will be $ 3,175, 181.53 The Contract Time will be (4r}c-ceased)-(de€r-ased) (unchanged) by ( 0 ) Days. The Date of Substantial Completion as of the date of this Change Order therefore is March 28, 1986 • Authorized: Reinke, Hansche, Last, Inc. P. GR.ACMiiron Construction Co. The City of Oshkosh AFAIT�rth Main Street t3U6TValTley Road OWNER. Church Street Address Address Address Oshkosh, WI 54901 Menasha, WI 549/52 Oshkosh, WI 54901 BY iR,� � BY L � C r,1' . • BY ! f }(, 1 dg� DATE 7A3/of DATE ,46% DATE / / y/ ) /9 , / AIA DOCUMENT G701 • CHANGE ORDER • APRIL 1978 EDITION • AIA® • © 1978 And: C s I ,, 1 i 1l!, ,d %' , ,� !!, THE AMERICAN INSTITUTE Of ARCHITECTS,1735 NEW YORK AVE., N.W., WASHINGTON, D.C. 20006 City Clerk 701 — • i AUG 2 2 1985 Vi Telephone (414) 734-4161 P . G . MIRON CONSTRUCTION CO . , INC . P " _ CONTRACTORS • CONSTRUCTION MANAGERS • MACHINE ERECTORS • DESIGN SERVICES P.O. Box 962 Appleton,WI 54912 August 22, 1985 Reinke, Hansche, Tast, Inc. 805 N. Main Street Oshkosh, Wisconsin 54901 RE: OSHKOSH CENTRE Gentlemen: The following is a breakdown of the costs incurred to furnish and install the framing required for roof penetrations. Appleton Structural Steel $3,150.00 84.00 !t 1,775.00 P. G. Miron Labor $146.56 48.96 195.52 Insurance & Payroll Expense 78.21 5,282.73 +P. G. Miron's Management Fee 792.41 ,SAL $6,075.14 Please issue a change order in the above amount at your earliest convenience. Should you have any questions please feel free to call. Sincerely, P .G. MIRON CONSTRUCTION 2:• \)31/K-', 4S-1' Greg Kippenhdn President GK/kb encs. CHANGE Distribution to: ORDER OWNER ❑ ARCHITECT ❑ AIA DOCUMENT G701 CONTRACTOR ❑ FIELD ❑ OTHER ❑ PROJECT: Oshkosh Centre CHANGE ORDER NUMBER: G-10 (name, address) Oshkosh, Wisconsin September 17, 1985 Se INITIATION DATE: P TO (Contractor): � ARCHITECT'S PROJECT NO: 1383 P. G. Miron Construction Co. ,Inc_I 806 Valley Road CONTRACT FOR:General Project Work. - Entire Project Menasha, WI 54952 L _j CONTRACT DATE: December 20, 1984 You are directed to make the following changes in this Contract: Provide additional structural steel to frame around roof penetrations. Add $6,075.14 APPROVED q heri t -...., i have be,* .: .. ,Hal kl• ;5 aecrUe k. .,. ,. .■ QSHXOSH,Wi5COht N ,,. lyl 1 << .___..,.. _�_._ Cat' Comptroller (Proposal Attached) Not valid until signed by both the Owner and Architect. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. The original (Contract Sum) (Emaranteed-MaemarrrEost) was $ 3,675,000.00 Net change by previously authorized Change Orders $ (505,893.61) . The (Contract Sum) (Guaranteed-Maximum€ost)-prior to this Change Order was $ 3,169,106.39 The (Contract Sum) ranteed-Maxir nTT COst) will be (increased) (decreased)tunthar grd) $ 6,075.14 by this Change Order • The new (Contract Sum) (C.a.ar- a>.tged-Maxi+lw+-€est) including this Change Order will be $ 3,175,181.53 The Contract Time will be 414c4ease4)-({1eefeased) (unchanged) by ( 0 ) Days. The Date of Substantial Completion as of the date of this Change Order therefore is March 28, 1986 Authorized: Reinke, Hansche, Last, Inc. P. G. Miron Construction Co. The City of Oshkosh AFAIT r P th Main Street 8S6TVa r c Road OWNER zi5 Church Street Address Address Address Oshkosh, WI 54901 Menasha, WI 54952 Oshkosh, WI 54901 BY s ,Y,'/, Cl Y anacer �c� BV DATE � 'c� K(1/644 1 DATE .17O`f%, DATE �/ AIA DOCUMENT G701 • CHANGE ORDER • APRIL 1978 EDITION • AIA • © 1978 And' '; I_ ��� � 1f THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON, D.C. 2000E City Cler AUG 2 2 1985 Telephone (414) 734-4161 4 P. G . MIRON CONSTRUCTION CO . , INC . P G 7 CONTRACTORS • CONSTRUCTION MANAGERS • MACHINE ERECTORS • DESIGN SERVICES P.O. Box 962 Appleton, WI 54912 August 22, 1985 Reinke, Hansche, Ta st, Inc. 805 N. Main Street Oshkosh, Wisconsin 54901 RE: OSHKOSH CENTRE Gentlemen: The following is a breakdown of the costs incurred to furnish and install the framing required for roof penetrations. Appleton Structural Steel $3,150.00 84.00 1,775.00 P. G. Miron Labor $146.56 48.96 195.52 Insurance & Payroll Expense 78.21 5,282.73 +P. G. Miron's Management Fee 792.41 TOTAL $6,075.14 Please issue a change order in the above amount at your earliest convenience. Should you have any questions please feel free to call. Sincerely, P ,G. MIROl Ci CNSTRJTIO—/ Greg Kippenhan President GK/kb encs.