Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Miron Construction/Ch Or G-11/roof drain piping
CHANGE Distribution to: ORDER OWNER ❑ ARCHITECT ❑ A!A DOCUMENT G701 CONTRACTOR ❑ FIELD ❑ OTHER ❑ PROJECT: Oshkosh Centre CHANGE ORDER NUMBER: G-11 (name, address) Oshkosh, Wisconsin INITIATION DATE: September 17 , 1985 TO (Contractor): ARCHITECT'S PROJECT NO: 1383 EP. G. Miron Construction Co_ ,Inc CONTRACT FOR: General Project Work - 806 Valley Road Entire Project Menasha, WI 54952 LJ CONTRACT DATE: December 20, 1984 You are directed to make the following changes in this Contract: Additional material and labor to renovate Add $3,584. 10 roof drain piping. 00:0JV L+ 5 p$HKOSN,WISCVN51 City Cor-npttc ier (Proposal attached) Not valid until signed by both the Owner and Architect. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. The original (Contract Sum) EC-rua-Fa•rtee-d--Max.l-muµT+Cost-} was $ 3,675,000.00 . Net change by previously authorized Change Orders $ (499,818.47) . The (Contract Sum) (Gvatarfiteed-Ma-xi-mH-na-C-o514 prior to this Change Order was $ 3,175,181.53 • The (Contract Sum) (Fnta-raftteed-Mate+rstlt --Get) will be (increased) (decrease4)-(44Ftc-h.a-aged) $ 3,584.10 by this Change Order The new (Contract Sum) (Gtia-r-aftteed-A i-mbi-Rt-C-0st) including this Change Order will be $ 3,178,765.63 • The Contract Time will be{i-Fiereased}-(f}ecfeased) (unchanged) by ( 0 ) Days. The Date of Substantial Completion as of the date of this Change Order therefore is March 28, 1986 - Authorized: Reinke, Hansche, Last, Inc. P.G. Miron Construction Co. The City of Oshkosh ' flffErth Main Street WOMI(iey Road 02\nE Church Street Address Address Address Oshkosh, WI 54901 Menasha, WI 54952 Oshkosh,/�n1I 54901 BY A' �Y / 1i��� y _� (. d'st"-eldte"-t B Y ✓ .,�`. ` ((_ f)(1�'(+ ' ' By �'�'� Ci}�/ Manager (.,, ,,DATE 9/'.Z3/S.. DATE - ' "'I DATE / t91 WSJ AIA DOCUMENT G701 • CHANGE ORDER • APRIL 1978 EDITION • AIA® • © 1978 And: .w . . A ,/7 THE AMERICAN INSTITUTE OF ARCHITECTS,1735 NEW YORK AVE., N.W., WASHINGTON, D.C. 20006 1 AUG 2 2 1915 • Telephone (414) 734-4161 . A t P. G . MIRON CONSTRUCTION CO . , INC . P G t CONTRACTORS • CONSTRUCTION MANAGERS • MACHINE ERECTORS • DESIGN SERVICES P.O. Box 962 Appleton, WI 54912 Azaust 22, 1985 Reinke, Hansche, Test, Inc. 805 N. Main Street Oshkosh, Wisconsin 54901 RE: OSHKOSH CENTRE Gentlemen: Enclosed is a proposal from Drucks Plumbing for additional work completed on the above captioned project. This proposal is for rerouting the roof drains as necessary. A breakdown is as follows: • Drucks Plumbing $3,116.61 +P. G. Miron's Management Fee 467.49 TOTAL $3,584.10 Please issue a change order in the above amount at your earliest convenience. Should you have any questions please feel free to call. Sincerely, P. _G. MIRON CONSTRUCTION Greg Kippenhan President GK/kb enc. CHANGE Distribution to: SEP 2 3 1985 ORDER OWNER ❑ ARCHITECT ❑ AIA DOCUMENT G701 CONTRACTOR ❑ FIELD ❑ OTHER LI PROJECT: Oshkosh Centre CHANGE ORDER NUMBER: G-11 (name, address) Oshkosh, Wisconsin INITIATION DATE: September 17, 1985 TO (Contractor): ARCHITECT'S PROJECT NO: 1383 EP. G. Miron Construction Co. ,Inc 806 Valley Road CONTRACT FOR: General Project Work - Menasha, WI 54952 Entire Project LJ CONTRACT DATE: December 20, 1984 You are directed to make the following changes in this Contract: Additional material and labor to renovate roof drain piping. Add $3,584.10 •'iSlc "S APPROVED ' 4,.,,;!•NOV 4 4 ;5 _ CITYATTO' EY Lt,xx. -- City Cornp¢ro le (Proposal attached) • OSHKOSH,WISCONSIN Not valid until signed by both the Owner and Architect. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. The original (Contract Sum) (- an-teed-Max-i4aiu-m_Cos4 was $ 3,675,000.00 • Net change by previously authorized Change Orders $ (499,818.47) • The (Contract Sum) eeel Maxir+ C--- ost) prior to this Change Order was $ 3,175,181.53 • The (Contract Sum) (E tia-raflteeel-Mds+r tlr -Ees4) will be (increased) (c-leerewec#)-(t.IrIeha.Rged) by this Change Order $ 3,584.10 . The new (Contract Sum) (6tiar-anteee -Maxi- tr -C-ost-) including this Change Order will be $ 3,178,765.63 • The Contract Time will be-fiflereased} (dccfeased) (unchanged) by ( 0 ) Days. The Date of Substantial Completion as of the date of this Change Order therefore is March 28, 1986 Authorized: Reinke, Hansche, Last, Inc. P.G. Miron Construction Co. The City of Oshkosh I orth Main Street TRMI ey Road 021E Church Street Address Address Address Oshkosh, WI 54901 Menasha, WI 54952 Oshkos , WI 54901 ■ // �J BY lI - r CI%'- k _ •"� BY /� id BY G•� N1c1118� DATE 9/423/83 DATE - - DATE "a sj i, r AIA DOCUMENT G701 • CHANGE ORDER • APRIL 1978 EDITION • AlA® • © 1978 n 1, 1 ,G701 195 THE AMERICAN INSTITUTE OF ARCHITECTS,1735 NEW YORK AVE., N.W., WASHINGTON, D.C. 20006 C I ty Clerk AUG 2 2 19$5 Telephone (414)734-4161 `$ P. G . MIRON CONSTRUCTION CO . , INC. P G CONTRACTORS • CONSTRUCTION MANAGERS • MACHINE ERECTORS • DESIGN SERVICES P.O. Box 962 Appleton, WI 54912 August 22, 1985 Reinke, Hansche, Last, Inc. 805 N. Main Street Oshkosh, Wisconsin 54901 RE: OSHKOSH CENTRE Gentlemen: Enclosed is a proposal from Drucks Plumbing for additional work completed on the above captioned project. This proposal is for rerouting the roof drains as necessary. A breakdown is as follows: Drucks Plumbing $3,116.61 +P. G. Miron's Management Fee 467.49 TOTAL $3,584.10 Please issue a change order in the above amount at your earliest convenience. Should you have any questions please feel free to call. Sincerely, P. G. MIRON CONSTRUCTION f Greg Kippenhan President GK/kb enc.