HomeMy WebLinkAboutPW CNT 85-11/Chg Or 1 r` CHANGE ORDER NO. 1
�
_
5
TO: a 1 DATED: December 12, 1985.
JIM FISCHER INC.
407 N. Casaloma Drive
Appleton, WI 54915
Your present contract with the City of Oshkosh, Contract No. 85-11 9
is hereby amended and changed as follows:
( insert here work and/or materials to be added or eliminated and
the unit and/or lump sum price to be added to or deducted from the
contract. ) ADDITIONAL WORK DONE TO DATE ON 1985 SIDEWALK REHABILITATION PROGRAM
1 . 4" concrete sidewalk, 36,224.47 @ $1.22/sq.ft.= $44,193.85
2. 6" concrete sidewalk, 3,145.25 @ $1.60/sq.ft.= $ 5,032.40
3. 4" wheel chair ramps, 646.57 @ $1.60/sq.ft.= $ 1,034.51
4. Sidewalk removal, 23,206.62 @ $0.22/sq.ft.= $ 5,105.46
5. Concrete sawing, 2,834.33 @ $1.25/lin.ft.= $ 3,542.91
8. 2" asphalt replace. , 2,336.72 @ $0.90/sq.ft.= $ 2,103.05
Additional Work
1 . Roof Drains under walk @ $65.00 lump sum= $ 65.00
2. Extra Stone, @ $123.00 lump sum= $ 123.00
3. Re-Bar, @ $114.00 lump sum= $ 114.00
4. Curb & gutter, 90.2 @ $12.00/1in.ft.= $ 1,082.40
TOTAL ADDITIONAL WORK DONE TO DATE = $62,396.58
Recommended ; CITY O//F//
'�' OSHK�:Eli 2
/
Director' •E blic orks City Manager
f, ,,
/7
! sl
City Clerk
Approved and accepted:
7' Cpntractcr
I certify that provision has been made to pay the liability that
will accrue to the City of Oshkosh, Wisconsin, under the within
Change Order.
.-i-k_ -`� ' Lt.' v.:,t,;(- -./
ComptrolLer
Approved as to form;
City Attorney