HomeMy WebLinkAboutPW CNT 85-11/Chg Or 1 r` CHANGE ORDER NO. 1 � _ 5 TO: a 1 DATED: December 12, 1985. JIM FISCHER INC. 407 N. Casaloma Drive Appleton, WI 54915 Your present contract with the City of Oshkosh, Contract No. 85-11 9 is hereby amended and changed as follows: ( insert here work and/or materials to be added or eliminated and the unit and/or lump sum price to be added to or deducted from the contract. ) ADDITIONAL WORK DONE TO DATE ON 1985 SIDEWALK REHABILITATION PROGRAM 1 . 4" concrete sidewalk, 36,224.47 @ $1.22/sq.ft.= $44,193.85 2. 6" concrete sidewalk, 3,145.25 @ $1.60/sq.ft.= $ 5,032.40 3. 4" wheel chair ramps, 646.57 @ $1.60/sq.ft.= $ 1,034.51 4. Sidewalk removal, 23,206.62 @ $0.22/sq.ft.= $ 5,105.46 5. Concrete sawing, 2,834.33 @ $1.25/lin.ft.= $ 3,542.91 8. 2" asphalt replace. , 2,336.72 @ $0.90/sq.ft.= $ 2,103.05 Additional Work 1 . Roof Drains under walk @ $65.00 lump sum= $ 65.00 2. Extra Stone, @ $123.00 lump sum= $ 123.00 3. Re-Bar, @ $114.00 lump sum= $ 114.00 4. Curb & gutter, 90.2 @ $12.00/1in.ft.= $ 1,082.40 TOTAL ADDITIONAL WORK DONE TO DATE = $62,396.58 Recommended ; CITY O//F// '�' OSHK�:Eli 2 / Director' •E blic orks City Manager f, ,, /7 ! sl City Clerk Approved and accepted: 7' Cpntractcr I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. .-i-k_ -`� ' Lt.' v.:,t,;(- -./ ComptrolLer Approved as to form; City Attorney