HomeMy WebLinkAboutMiron Construction/Chg Or G-12/Oshkosh Centre CHANGE Distribution to: ORDER OWNER ❑ ARCHITECT ❑ AM DOCUMENT G701 CONTRACTOR ❑ ., FIELD ❑ OTHER ❑ PROJECT: Oshkosh Centre CHANGE ORDER NUMBER: G-12 (name, address) Oshkosh, WI INITIATION DATE: November 4, 1985 TO (Contractor): F-- ARCHITECT'S PROJECT NO: 1383 P. G. Miron Construction Co.� 806 Valley Road CONTRACT FOR: General Project Work - Menasha , WI 549` 2 Entire Project 1 CONTRACT DATE: December 20, 1984 You are directed to make the following changes in this Contract: Provide special floor coating per Section 0980 - Special Coatings in the following rooms : Color shall be Sand Beige. 133 140 1_34 141 1" P 1 , t' ' 1- 3 142 13 6 143 1 q .' ) 138 14 3 e :_s 139 152 Add $12, 075. 00 (This work was originally in contract and was deleted by Change Order No. 1) , ,_ , . rolls (Proposal attached) ?,(Ly2 ar Not valid until signed by both the Owner and Architect. City Co+ jptrolie Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. The original (Contract Sum) (Giiaaa+need-Max-irtltrrizi-C-esF) was $ 3 , 675, 000. 00 • Net change by previously authorized Change Orders $ (496, 234. 37) . The (Contract Sum) (Gt rxtrtred-Maxitrmm-Cost) prior to this Change Order was $ 3, 178, 765. 63 • The (Contract Sum) -(Guaraaxeed-A4axiFaucr-Cost-) will be (increased) (el reared 4u-netaflged) 12, 075. 00 by this Change Order $ . The new (Contract Sum) (6ea a•fit-eee-4•MaL+rti-Ees4.3 including this Change Order will be $ 3 , 190, 840. 63 The Contract Time will be 4.iurrease41)-(decreased) (unchanged) by ( 0 ) Days. The Date of Substantial Completion as of the date of this Change Order therefore is March 28, 1986 . Authorized: Reinke, Hansche, Last, Inc. P. G. Miron Constr. Co. The City of Oshkosh ARCHITECT CQr1TRALTOR O 8OF North Main StrPPt 806 Valley Road L Church Street Address Address Address Oshkosh, WI 54901 Me sha, WI 549E2 Oshkosh, WI/ 5490/1 BY A BY BY Wi liars D. Fruel�,City Mr DATE 20316/ DATE // — ( J E ''1 1' / t/ e �''k, I)rTui�� °`�rw , Cl AIA DOCUMENT G701 • CHANGE ORDER • APRIL 1978 EDITION • MA® • © 1978 Dated' 11'22/II5 G701 —1978 THE AMERICAN INSTITUTE OF ARCHITECTS,1735 NEW YORK AVE., N.W.,WASHINGTON, D.C. 20006 OCT k _. Isi;S IIA Telephone (414)734-4161 { 4- P. G . MIRON CONSTRUCTION CO . , INC. CONTRACTORS • CONSTRUCTION MANAGERS • MACHINE ERECTORS • DESIGN SERVICES P.O. Box 962 Appleton, WI 54912 October 22, 1985 Reinke, Hansche, Last, Inc. 805 N. Main Street Oshkosh, Wisconsin 54901 RE: OSHKOSH CENTRE Gentlemen: We are pleased to quote the sum of $12,075.00 to furnish and install three coats of urethane. Our price includes one of four basic colors, and sealing any expansion joints. We hope this meets with your approval. Should you have any questions please feel free to call. Sincerely, P. G. MIRON CONSTRUCTION :4 Gregory A. Kippenhan President GAK/kb CHANGE Distribution to: ORDER OWNER ❑ ARCHITECT LI A1A DOCUMENT C701 CONTRACTOR ❑ FIELD ❑ OTHER ❑ PROJECT: Oshkosh Centre CHANGE ORDER NUMBER: G-12 (name, address) Oshkosh, WI INITIATION DATE: November 4, 1985 TO (Contractor): 17". ARCHITECT'S PROJECT NO: 1383 P. G. Miron Construction Con 806 Valley Road CONTRACT FOR: General Project Work - Menasha , WI 549' 2 Entire Project L _j CONTRACT DATE: December 20, 1984 You are directed to make the following changes in this Contract: Provide special floor coating per Section 0980 - Special Coatings in the following rooms : Color shall be Sand Beige. 133 140 134 141 A, f"� s ., r' 1, ? , 135 142 ¢ 136 143 137 144 16� - . 13 8 145 L w10, 139 152 osfe:o.ti.snsco.Ns`t A4,6 $12 , 075 . 00 (This work was originally in contract and was deleted by Change Order No. 1) (Proposal attached) Not valid until signed by both the Owner and Architect. } Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. The original (Contract Sum) ( a-rafrtee4 Max+r trrmt{es4) was $ 3 , 675, 000. 00 • Net change by previously authorized Change Orders $ (496, 234 . 37) . The (Contract Sum) (GvarAnie.ed-Maxirrrnm-C-e t) prior to this Change Order was $ 3 , 178, 765. 63 • The (Contract Sum) {r-4uaraate€2d-1■4axifra.Aza-Cost will be (increased) (deepeasecf•}{a+neh-a•Rged) 12, 075. 00 by this Change Order $ 3 , 190, 840. 63 The new (Contract Sum) (Gtta t eedM x+rt+I+tl:rEes4) including this Change Order will be $ The Contract Time will be liacxeas.e<i;I)-(c e.cr-eased) (unchanged) by ( 0 ) Days. The Date of Substantial Completion as of the date of this Change Order therefore is March 28, 1986 . Authorized: Reinke, Hansche, Last, Inc. P. G. Miron Constr. Co. The City of Oshkosh ARCHITECT C�f�Uff7�1TRAV0 O I RGc North Main Straat ley Road V Church Street Address Address Address Oshkosh, WI 54901 Menasha, WI 549`2 Oshkosh, WI 54901 1 a BY BY ..�\�.�.. �o_ ire�- By Wil/ 13.-p,,,d lam D. F y Ma ag DATE ////3/Si' DATE //— —_R IE i', 2.(.L���Qi D� nt �. arrwa� r,t., ' ler MA DOCUMENT G701 • CHANGE ORDER • APRIL 1978 EDITION • AIAg • © 1978 THE AMERICAN INSTITUTE OF ARCHITECTS,1735 NEW YORK AVE., N.W.,WASHINGTON, D.C. 20006 Dated: 11/22/85 G701 —1978 OCT 47_ f.-J65 MTelephone (414)734-4161 P. G . MIRON CONSTRUCTION CO . , INC . CONTRACTORS • CONSTRUCTION MANAGERS • MACHINE ERECTORS • DESIGN SERVICES P.O. Box 962 Appleton, WI 54912 October 22, 1985 Reinke, Hansche, Last, Inc. 805 N. Main Street Oshkosh, Wisconsin 54901 RE: OSHKOSH CENTRE Gentlemen: We are pleased to quote the sum of $12,075.00 to furnish and install three coats of urethane. Our price includes one of four basic colors, and sealing any expansion joints. We hope this meets with your approval. Should you have any questions please feel free to call. Sincerely, P. G. MIRON CONSTRUCTION ,,../\4______// i` / Gregory A. Kippenhan G nhan President GAK/kb crohitocts REINKE • HANSCHE • LAST • INC • PY-VAVRA ARCHITECTS ENGINEERS INC. 805 NORTH MAIN STREET • OSHKOSH, WISCONSIN 54901 • TELEPHONE 414 231-6950 November 13 , 1985 Mr. William Frueh, City Manager City of Oshkosh 215 Church Street Oshkosh, WI 54901 RE: OSHKOSH CENTRE PROJECT NO. 1383 Dear Mr. Frueh: Enclosed are five ( 5 ) copies of Change Order No. G-12 (Special Floor Coating) for review and approval. Please have two ( 2 ) copies returned to this office. Also attached is the chart of available colors. CSA has chosen the Sand Beige. Very truly yours , /Aaf4-6)'11 DAVID E. MALMGREN, AIA DM/bf Encl. 01LT1383 .DEM