Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Oshkosh Centre/Chg Or G-18
CHANGE - Distribution to: ORDER OWNER ❑ ARCHITECT ❑ , MA DOCUMENT G701 CONTRACTOR CI 1, .. FIELD ❑ OTHER ❑ PROJECT: OSHKOSH CENTRE CHANGE ORDER NUMBER: G-18 (name, address) Oshkosh, Wisconsin INITIATION DATE: January 29, 1986 TO (Contractor): ARCHITECT'S PROJECT NO: 1383 EP. G. MIRON CONSTRUCTION CO, INC1. 806 Valley Road CONTRACT FOR: GENERAL PROJECT WORK Menasha, WI 54952 Entire Project L I CONTRACT DATE: December 20, 1984 You are directed to make the following changes in this Contract: 1. Furnish one additional Satin Bronze Ashtray. (Plans showed required one additional than was indicated on accessory schedule, hole already cut for ashtray) Add $140.07 2. Delete Acoustic Tile Ceiling In Room 202 Deduct $ (45.00) 3. Furnish and install steel angles to support light fixtures in main exhibition hall Add $1,614.30 4. Furnish and install Oak boards at wall locations where operable partitions terminate. (Required because of electrical plugmold continuous around room and fill needed bove and below plugmold for operable part ,t4!0P .tq :seal" ) Add $1,005.05 TOTAL- AEIb $2,714.42 �, U. IL .�- oposals Attached) :lb- ci t ? l tvati'd'"G it signed by both the Owner and Architect. - Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. The original (Contract Sum) (M NieMa c W44) was $3,675,000.00 Net change by previously authorized Change Orders $ (479,999,37) The (Contract Sum) (64t.l F> s X itS nNt) prior to this Change Order was $3,195,000.63 . The (Contract Sum) (XtX itglYd iX XXtXt) will be (increased) (idea£ga"slid) iii ;a£Pid) $ 2,714.42 by this Change Order $ . The new (Contract Sum) ip lg1 g 0154) including this Change Order will be $3,197,715.05 . The Contract Time will be kIXtXgouctx(I 1d) (unchanged) by ( 0 ) Days. The Date of Substantial Completion as of the date of this Change Order therefore is March 28, 1986 . Authorized: RETNKR HANSCHE LAST, Ilse. P. G. MIRON CONSTRUCTION CO. THE CITY OF OSHKOSH ARCHITECT CONTRACTOR OWNER 805 N. Main Street 806 Valley Road 215 Church Street Address Address Address Oshkosh, S/W^I '7/�15�/4901 M., asha, WI 54952 _ Osh osh, WI . 4901 BY / ` (�" ' 1.,� u... BY .�, ...r. �e3. r / _' e. ::::1;liam f �'� 2 / DI F7Ich,City Manage DATE •f G /B 1 DATE -3/- c rir►a� Ls Q t Clerk MA DOCUMENT G701 • CHANGE ORDER • APRIL 1978 EDITION • AtA0 • © 1978 2/21/86 THE AMERICAN INSTITUTE OF ARCHITECTS,1735 NEW YORK AVE., N.W., WASHINGTON, D.C. 20006 G701 —1978 Telephone(414)734-4161 P. G . MIRON CONSTRUCTION CO . , INC. CONTRACTORS • CONSTRUCTION MANAGERS • MACHINE ERECTORS • DESIGN SERVICES P.O. Box 962 Appleton, WI 549,12 . ,. (.. ./.1 January 24, 1986 Reinke, Hansche, Last, Inc. 805 N. Main Street Oshkosh, Wisconsin 54901 Attention: Mr. David E. Malrigren RE: OSHKOSH CENTRE Dear Dave: The following is a list of extras for the above captioned project. 1) Furnish one additional satin bronze ashtray as instructed. Block Iron & Supply $ 121.80 P. G. Miron Management Fee 18.27 TOTAL $ 140.07 2) Delete ceiling in Room #202. Sullivan Brothers, Inc. ($ 45.00) 3) Furnish and install stell angels at trusses for light fixtures in Main Convention Room. Labor $ 731.13 Equipment 180.00 Yard Materials 9.61 Appleton Structural Steel 483.00 1,403.74 P. G. Miron Management Fee 210.56 TOTAL $1,614.30 'A January 24, 1986 RE: OSHKOSH CENTRE 4) As instructed we have furnished and installed additional oak at wall locations where movable partitions terminate. Labor $ 525.50 Mueller Lumber 202.44 Block Iron & Supply 11.02 Lee's Color Studio 135.00 873.96 P. G. Miron Management Fee 131.09 TOTAL $1,005.05 To date, we have not received a written quotation for vinyl base from the people who are installing the carpet for the city of Oshkosh. Should you have any questions please feel free to call. Sincerely, P. /G. MIRON CONSTRUCTION Gregory A. Kippenhan President GAK/kb