Super Excavators, Inc./Ceape, Hazel Sewer Interceptor
CONSTRUCTION CONTRACT THIS AGREEMENT, made on the 24th day of January, 1986, by and between the CITY OF OSHKOSH, party of the first part, hereinafter referred to as the CITY, and SUPER. EXCAVATORS, INC., of N59 W14601 Bobolink Ave., Menomonee Falls, WI 53051, party of the second part, hereinafter referred to as the CONTRACTOR, WITNESSETH: That the City and the Contractor, for the consideration hereinafter named, agree as follows: ARTICLE I . SCOPE OF WORK The Contractor hereby agrees to furnish all of the materials and all of the equipment and labor necessary, and to perform all of the work shown on the plans and described in the specifications for the project entitled or described as follows: for Ceape Avenue/Hazel Street Sewer Interceptor, pursuant to Resolution #18 adopted by the Common Council of the City of Oshkosh on 19th day of December, 1985, all in accordance and in strict compliance with the Contractor's proposal and the other contract documens referred to in ARTICLE V of this contract. ARTICLE II. TIME OF COMPLETION The work to be performed under this contract shall be commenced and the work completed within the time limits specified in the General Conditions and/or Contractor's proposal. ARTICLE III. PAYMENT (a) The Contract Sum. The City shall pay to the Contractor for the performance of the contract the sum of $2,860,855.00, adjusted by any changes as provided in the General Conditions, or any changes hereafter mutually agreed upon in writing by the parties hereto, provided, however, in the event the proposal and contract documents are on 1 a "Unit Price" basis, the above mentioned figure is an estimated for the performance of the contract the amounts determined for the total number of each of the units of work as set forth in the Contractor's proposal; the number of units therein contained is approximate only, and the final payment shall be made for the actual number of units that are incorporated in or made necessary by the work covered by the contract. (b) Progress Payments. In the event the time necessary to complete this Contract is such that progress payments are required, they shall be made according to the provisions set forth in the General Conditions. ARTICLE IV. CONTRACTOR TO HOLD CITY HARMLESS The Contractor covenants and agrees to protect and hold the City of Oshkosh harmless against all actions, claims and demands of any kind or character whatsoever which may in any way be caused by the negligent digging up of streets, alleys or public grounds or which may result from the faulty, carelessness or neglect of said Contractor, his agents, employees or workmen in the performance of said work or caused by the violation of any City ordinance, and shall refund to the City all sums which it may be obliged or adjudged to pay on any such claims or demands within a reasonable time after demand thereof. ARTICLE V. COMPONENT PARTS OF THE CONTRACT This contract consists of the following component parts, all of which are as fully a part of this contract as if herein set out verbatim, or if not attached, as if hereto attached: 1 . General Conditions 2. Advertisement for Bids 3 . Instructions to Bidders 4 . Specifications, including any addenda 5 . Plans 6 . Contractor ' s Proposal 7 . This Instrument In the event that any provision in any of the above component parts of this contract conflicts with any provision in any other of the component parts, the provision in the component part first enumer- ated above shall govern over any other component part which follows it numerically except as may be otherwise specifically stated. IT IS HEREBY DECLARED, UNDERSTOOD AND AGREED that the word "Con- tractor" wherever used in this contract means the party of the second part and its/his/their legal representatives, successors and assigns. 2 IN WITNESS WHEREOF, the City of Oshkosh, Wisconsin, has caused this contract to be sealed with its corporate seal and to be sub- scribed to by its City Manager and City Clerk and countersigned by the Comptroller of said City, and the party of the second part hereunto set its, his or their hand and seal the day and year first above written. In the Presence of: CONTRACTOR SUPER E VATORS I C. (Seal of Contractor * if a Corporation ) ( : .ecif . T: tle) By: _/ �% /�. ia. (Specify Title) CITY OF OSH OSH c !/ By /� � -.` ( / (Wi - e-s) Wi{ am D. Frueh, City Manager IV .*l • _00/11,1i t_ �� _ ..I And: 4>267. (Wi ;Vs) Donna C.Serwas, City Clerk I certify that provisions have been made to pay the liability that will accrue to the City of Oshkosh under the within contract. Edward A. Nokes, City Comptroller Approved as form t I Warren P. Kraft, Asst, City Attorney 3 . . � WISCONSIN SOCIETY OF ARCHITECTS �: ,V THE AMERICAN INSTITUTE OF ARCHITECTS �' . h 106 .tom WIS. AIA DOCUMENT FEB. 1976 ED. WIS. A312 • BOND NO . 0450-74-094462–C — PUBLIC IMPROVEMENT PERFORMANCE/LABOR AND MATERIAL PAYMENT BOND THIS BOND IS TO BE USED ON PUBLIC IMPROVEMENT CONTRACTS PURSUANT O TO SECTION 289.14 WISCONSIN STATUTES AND ACTS AMENDATORY THERETO. 07 KNOW ALL MEN BY THESE PRESENTS: that (Here insert name and addreaa or legal title of the Contractor, referred to in Sec. 289.14 Wisconsin Statutes aa the prime contractor) SUPER EXCAVATORS, INC . , N59 W14601 BOBOLINK AVE . , MENOMONEE FALLS, WI 53051 EMPLOYERS INSURANCE OF WAUSAU A Mutual Company as Principal, hereinafter called Principal, and, (Here insert the legal title and addreu of su.ety) 2000 WESTWOOD DRIVE WAUSAU, WI 54401 duly authorized and licensed to do business in the State of Wisconsin, as Surety, hereinafter called Surety, are held and firmly bound unto (Name and address or legal title of Owner) CITY OF OSHKOSH, CITY HALL, 215 CHURCH AVE . , P .O . BOX 1130, OSHKOSH, WI 54902 as Obligee, hereinafter called Owner, for the use and benefit of claimants as hereinafter provided in the amount of TWO MILLION EIGHT HUNDRED SIXTY THOUSAND EIGHT HUNDRED 2, 860, 855 . 00 FIFTY–FIVE AND 00 /100 Dollars ($ ), (Here insert • sum at least equal to the contract price) for the payment whereof Principal and Surety bind themselves, their heirs, executors, administrators, suc- cessors and assigns, jointly and severally, firmly by these presents. WHEREAS, Principal has by written agreement dated DEC . 2 0 19 8 5, entered into a contract with Owner for PUBLIC WORKS CONTRACT NO . 86-04/05 FOR CEAPE AVE . /HAZEL STREET SEWER INTERCEPTOR ''SEWER REHABILITATION PROGRAM 1B 't in accordance with drawings and specifications prepared by (Here insert fun name, title and address) which contract is by reference made a part hereof and is required by Section 289.14, Wisconsin Statute.. to contain in substance the following provision: The Contractor shall pay all claims for labor per- machinery, vehicles, tractors, equipment, fixtures, ap- formed and materials furnished, used or consumed in paratus, tools, appliances, supplies, electric energy, making the public improvement or performing the gasoline, motor oil, lubricating oil, greases, premiums public work, including, without limitation because of for workmen's compensation insurance and contri- v specific enumeration, fuel, lumber, building materials, butions for unemployment compensation. The said written agreement, drawings, specifications and amendments are hereinafter referred to as the Contract. PUBLIC IMPROVEMENT PERFORMANCE/LABOR-MATERIAL BOND TWO PAGES tt WIS. AIA DOC. WIS. A312 FEB., 1976 ED. PACE 1 Cops. 1969 Wisconsin Society of Architects/AIA 781 North Jefferson Streec, Milwaukee, Wisconsin 53202 NOW, 111ERL1"O1:L., 1111✓ CUN1)111UN Ur 11i1J Ul;L1v.v11U.v, as rcquireo bv . Wisconsin Statutes. is such that, if the Principal shall faithfully perform the said contract and p:r: every person entitled thereto for all the claims for labor performed and materials furnished under the Contract. to he used or consumed in making the public improvement or performing the public work as provided in the Contract• then this obligation shall be null and void: othen,it:e it shall retrain in full force and effect, subject, however, to the following conditions: 11 No assignment. modification or change of the Principal and the Surety upon this bond for the Contract, or change in the work covered thereby, or recovery of any damages he may have sustained by any extension of time for the completion of the Con- reason of the failure of the Principal to comply with tract shall release the sureties on the bond. the Contract or with the Contract between the Prin- cipal and his subcontractors. If the amount realized 2) Not later than one year after the completion of on this bond is insufficient to satisfy all claims of work under the Contract, any party in interest may the parties in full, it shall be distributed among the inaintain an action in his own name against the parties pro rata_ Signed and sealed this 9TH day of JANUARY , 19_86 IN THE PRESENCE OF: SUPER EXCAVATORS, INC . P711 ' COI/44d 114 By: (Seal) Witness Title: //+C e «X-, EMPLOYERS INSURANCE OF WAUSAU A Mutual Company Name of Surety tke, 0)1: 1112Alit.X► r 1 By: ,Z� 49 (Seal) i Witness Tide: ATTO.R —IN—FACT JAMES D. GERSCH APPROVED B IN THE PRESENCE OF: w Owner 411.116,41,11 A .AG 1, 4 .do By: 4 t.. (Seal) Witness Tide: *This bond shall be approved in the case of the state by the state official authorized to enter into such con- tract, of a county by its district attorney, of a city by its mayor, of a village by its president, of a town by its chairman, of a school district by the director or president and of any other public board or body by the presiding officer thereof. Any correspondence in relation to this bond should be directed to: Wausau Insurance Companies Bonding Box 150 Wausau. Wisconsin 54401 PUBLIC IMPROVE\IF.NT PERFORMANCE/LABOR-MATERIAL BOND TWO PAGES WIS. A1% DOC. WIS. A312 FEB.. 1976 ED. PAGE 2 NoOm;:l Acknowledgement—Attorney in Fact On this 9TH day of JAN. 19 86 before me. WISCONSIN JILL D. ZENTKOWSKI STATE OF , a Notary Public in and for said County of MILWAUKEE S.S. MILWAUKEE County, State aforesaid, residing therein, duly commissioned and sworn, personally appeared JAMES D. GERS CH known to me to be the person whose name is subscribed to the within instrument as the attorney in fact of EMPLOYERS INSURANCE OF WAUSAU A Mutual Compac.✓ and acknowledged to me that he subscribed the name of EMPLOYERS INSURANCE OF WAUSAU A Mutual Company thereto as surety, and his own as attorney in fact IN WITNESS WHEREOF, I have hereunto set my hand and affixed my official seal, at my office in the said county of MILWAUKEE the day and year in this certificate first above written (?y ,c1 i for the county Public in and o y of MILWAUKEE State of WISCONSIN 8-7-88 My commission expires No. 204-011- 0 2121 EMPLOYERS INSURANCE OF WAUSAU A mutual Company POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS: That the EMPLOYERS INSURANCE OF WAUSAU A Mutual Company,a corporation duly organized and existing under the laws of the State of Wisconsin, and having its principal office in the City of Wausau, County of Marathon, State of Wisconsin,has made,constituted and appointed,and does by these presents make,constitute and appoint — James D. Gersch — its true and lawful attorney-in-fact,with full power and authority hereby conferred in its name,place and stead,to execute, seal, acknowledge and deliver ANY OR ALL BONDS, UNDERTAKINGS, RECOGNIZANCES OR OTHER WRITTEN OBLIGATIONS IN THE NATURE THEREOF INCLUDING CONSENTS OF SURETY AND WAIVERS TO THE CONDITIONS OF CONTRACTS Y Z �ifftE�o ind the corporation thereby as fully and to the same extent as if such bonds were signed by the President,sealed with w the corporate seal of the corporation and duly attested by its secretary hereby ratifying and confirming all that the said 1 attorney-in-fact may do in the premises. Z This power of attorney is granted pursuant to the following resolution adopted by the Board of Directors of said Company at a meeting duly called and held on the 18th day of May, 1973,which resolution is still in effect: Q "RESOLVED,that the President and any Vice President—elective or appointive—of EMPLOYERS INSURANCE OF W WAUSAU A Mutual Company be,and that each of them hereby is,authorized to execute powers of attorney qualifying D_ the attorney named in the given power of attorney to execute on behalf of EMPLOYERS INSURANCE OF WAUSAU A Q Mutual Company bonds,undertakings and all contracts of suretyship;and that any secretary or assistant secretary be, F— and that each or any of them hereby is,authorized to attest the execution of any such power of attorney,and to attach O thereto the seal of EMPLOYERS INSURANCE OF WAUSAU A Mutual Company." Z "FURTHER RESOLVED,that the signatures of such officers and the seal of EMPLOYERS INSURANCE OF WAUSAU w A Mutual Company may be affixed to any such power of attorney or to any certificate relating thereto by facsimile,and O any such power of attorney or certificate bearing such facsimile signatures and facsimile seal shall be valid and binding O upon the EMPLOYERS INSURANCE OF WAUSAU A Mutual Company when so affixed and in the future with respect F— to any bond, undertaking or contract of suretyship to which it is attached." Z IN WITNESS WHEREOF,EMPLOYERS INSURANCE OF WAUSAU A Mutual Company has caused these presents to be in 2 signed by the vice president and attested by its assistant secretary,and its corporate seal to be hereto affixed this 15th day 0 Q of November , 19 80 , Z ~ °" EMPLOYERS INSURANCE OF WAUSAU A Mutual Company (.1) +r cop.AIE j VJ , = 10 SEAL;, F- ,,r�'1 By ∎=��=i!!�� — --- - - pir R.D.Farnswort Vice President Q } Attest: �J / 1iltital O D.J.Borrell Assistant Secretary QSTATE OF WISCONSI ) )ss. o COUNTY OF MARATHON ) cc On this 15th day of NovemhPr ,1980 ,before me personally came w R.D.Farnsworth to me known,who being by me duly sworn,did depose oand say that he is a vice president of the EMPLOYERS INSURANCE OF WAUSAU A Mutual Company,the corporation 0- described in and which executed the above instrument;that he knows the seal of said corporation;that the seal affixed to said 0 instrument is such corporate seal and that it was so affixed by order of the Board of Directors of said corporation and that he J signed his name thereto by like order. > IN WITNESS WHEREOF, I have hereunto set my hand and affixed my official seal the day and year herein first above Q written. F- O Z "424("VII/Zitzow Notary Public — NOTARY PUBLIC to STATE OF WISCONSIN = MY COMMISSION IS PERMANENT H STATE OF WISCONSIN ) CERTIFICATE CITY OF WAUSAU )ss. COUNTY OF MARATHON ) I, the undersigned, assistant secretary of EMPLOYERS INSURANCE OF WAUSAU A Mutual Company, a Wisconsin corporation, do hereby certify that the foregoing and attached power of attorney, WHICH MUST CONTAIN A VALIDATING STATEMENT PRINTED IN THE MARGIN THEREOF IN RED INK,remains in full force and has not been revoked;and furthermore that the resolution of the Board of Directors set forth in the power of attorney is still in force. Signed and sealed in the City of Wausau,Marathon County State of Wisconsin,this 9TH day of JANUARY 19 86 i if € D.J.Borrell Assistant Secretary .SEAL ,' NA NOTE: IF YOU HAVE ANY QUESTIONS REGARDING THE VALIDITY OR WORDING OF THIS POWER OF ATTORNEY,CALL TOLL FREE(800)826-1661.(IN WISCONSIN,CALL(800)472-0041). n . 477:7P ° .. CERTIFICATE OF INSURANCE Wausau Insurance Companies This is to certify that the insurance policies (described below by a policy number)written on forms in use by the company have been issued. This certificate is not a policy or a binder of insurance and does not in any way alter, amend or extend the coverage afforded by any policy referred to herein. Name and address of Insured Producer No.: 2 1 0 5 SUPER EXCAVATORS, INC . Place: MILWAUKEE, WI 53216 N59 W14601 BOBOLINK AVE . Date Issued: 1 10 86 MENOMONEE FALLS, WI 53051 Region: ML 1_ I Kind of Coverage CO.* Expiration Date Policy Number ** Unless otherwise indicated, this policy affords full coverage under the Workers Compensation laws of all states(except states where coverage can be provided only by Workers State Funds,and Canada)and as designated in the policy and endorsements for Employers Compensation** 3 3 8 86 0 416 00 094462 Liability. Limits of Liability Comprehensive 12 I 3 8 86 0426 0 4 094462 Bodily Injury Property Damage General Liability $ 500, 000 Each Occurrence $ 100, 000 Each Occurrence Special Multi-Peril or Trademark(Section II only) $ 500, 000 Aggregate $ 100, 000 Aggregate Products-Completed Operations: IX Included ❑ Excluded Single Limit $ Each Occurrence Contractual-All Written Contracts: EX Included ❑ Not Covered $ Aggregate Owners', Landlords' $ Each Occurrence $ Each Occurrence and Tenants'Liability $ Aggregate Contractual Liability $ Each Occurrence $ Each Occurrence Designated Contracts Aggregate $ g9 ate 9 Only Single Limit $ Each Occurrence $ Aggregate Automobile Liability 1 2 1 3 8 86 1 0 4 2 6 06 094462 $ Per Person X] All Owned Autos X Hired and Nonowned Autos $ Per Accident $ Per Accident Specified Autos Only Single Limit $ 1, 000, 000 Per Accident $ 5, 000, 000 Each Occurrence Umbrella 2 3 8 86 0426 0 5 094462 $ 5, 000, 000 Aggregate Products-Completed Operations Liability $ 10, 000 Retention Special Provisions/Locations/Specified Autos: PUBLIC WORKS CONTRACT NO. 86-04/05 FOR CEAPE AVE . /HAZEL STREET SEWER INTERCEPTOR "SEWER REHABILITATION PROGRAM 1B" Notwithstanding any requirement, term or condition of any contract or other document with respect to which this certificate may be issued or may pertain, the insurance afford- ed by the policy (policies)described above is subject to all of the terms,exclusions and conditions of such policy(policies)during the term(s)thereof. *The entry of a number in this column means that the coverage is afforded by the company designated by the same number. Issued to: *Issued by 2. EMPLOYERS INSURANCE OF WAUSAU A Mutual Company • CITY OF OSHKOSH 3. WAUSAU UNDERWRITERS INSURANCE COMPANY CITY HALL 5. WORLDWIDE UNDERWRITERS INSURANCE COMPANY 2 1 5 CHURCH AVE . 7. ILLINOIS EMPLOYERS INSURANCE OF WAUSAU P.O . BOX 1 1 3 0 1. WAUSAU LLOYDS 1 OSHKOSH, WI 54902 e• Signed Auihonzed Comoany Represeniahve ii 784 (5)155736 0 Cr-5 ) 2--k--7 Change Order No. -.1 September 4 . 1986 Contract No. 86-04/05, Ceape Avenue/Hazel St. Sewer Interceptor Owner : City of Oshkosh Contractor: Super Excavators Inc. Engineer : Howard Needles Tammen & Berdendoff Contract No. 86-04/05, Ceape Avenue/Hazel St. Sewer interceptor is hereby amended and changed as follows: Item No. 1 - Addition of a 12" Storm Sewer $14 , 178.00 and Catch basins on Washington Ave. (See Attachment A) Item No. 2 - Change in Pavement Type from $45,233 .46 Bituminous to 7"Concrete on Washington Avenue and Hazel St . for work included in Contract 86-04105. (Attachment 8) Item No- 3 - Additional Pavement Restoration $41 ,415.69 requested by City of Oshkosh on Washington Avenue and Hazel St . (Attachment B) Total $100,827 . 15 Original Amount of Contract $2 ,828,455.00 Total Amount of Previous Change Orders to Date 0.00 Previous Adiusted Contract Amount $2,828,455.00 Change Order No. 1 Amount $100,827. 15 Total Amount of Current Contract Including C.O. No. I. $2,929, 282. 15 RECOMME7ED: (((t ? , By Director of Pu i ic Works city Manager j lib-Att. A 1(.4,A / HNTB, /Resident Engineer , Cit Clerk -atez--7(>-• _,. 6",,, __- -./.----\--._____ Approved and Accep ed Super Excavators )c. I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin , under the within Change Oraer . Appro eci As a 'or : Comptroller Ilk -- 411 4 i Wk City Attorney Arnial nor A _ i ._ SUPER _ _ ,. E X C H V <\ T 0 R S . : .. - ';. r ' SUPER EXCAVATORS, INC. r ESTABLISHED IN 1950 May 23, 1986 - .. City of Oshkosh 215 Church Avenue - - __ P. 0. Box 1130 Oshkosh, Wisconsin 54902 Attn: Mr. Jerry Conrad Director of Public Works Re: Storm Sewer installation _ Washington Street Dear Mr. Conrad: The following is an invoice for installation of sewer work not included in our contract for the Hazel Street/Ceape Avenue Interceptor. DESCRIPTION QUANTITY UNIT PRICE AMOUNT 269.2 12" Storm Sewer LF $ 23.00 $ 6783l-OO 6801103 Manholes without castings --EA 600.00 1,800.00 8" Catch basin/Inlet lead LF 14.00 ' ,'r Wiz:vv 1436.40 Catch Basins/inlets 8 EA 450.00 .40.75te759 ,rpoo.00 Abandon Catch Basins/Manholes 3 EA 75.00 225.00 :�fT,tvc-i IvL.i uio t3'sE 1 1A U(O liCald TOTAL AMOUNT DUE $1 ,7�8.00 1 14,178.44 Submitted by: (F&t&AL) SUP or EXCAVATORS, INC. /i Thomas Ritzer, P. 442.1 RECEIVED Vice President MAY 26 1986 HOWARD, NEEDLES.TAMMEN &BERGENDOFF WIILWAUKE E. WISCONSIN PUBLIC WORKS CONTRACTORS • MUNICIPAL • COMMERCIAL • INDUSTRIAL • NEW DEVELOPMENTS N59 W14601 BOBOLINK AVE. • MENOMONEE FALLS, WI 53051 • (414)252-3200 VIEMOIMNsial AM CHnsl u SUPER _ ... ( , . ,_„0,41 ___ . ,,,4 . r••• .. '."...V-. _ C Yr, E XC /yV /\ T ❑ RS «- ,+ . - SUPER EXCAVATORS, INC. . ESTABLISHED IN 1950 _. August 12, 1986 . _. _ Howard, Needles, Tammen & Bergendoff _ P.O. Box 526 -. ..... . , Oshkosh, WI 54902 + Y '" , a" Attn: George Russell,Jr., P.E. Project Engineer . _ -- ,_ .. RECEIVED ED , Re: Ceape Street/Hazel Street Interceptor City No. 86-4 and 86-5UG 15 1966 Super No. 85028 HOWARD.,M TAMatEN Dear Mr. Russell, II SEN,Maff - Restoration of Washington Avenue and Hazel Street has been res ore. R concrete pavement in lieu of the specified bituminous pavement. In accordance with my discussions with yourself and Steve Dittmer of the ...City Engineering Office, the following is the final added quantities to the contract: A. Washington Avenue 3,821.( 1. 3,832 Cq.Yd. -7" Pavement @ $ 8.08 $ 30,9C2.SC 30 42?.dl 2. 1,573.1 Sq.Yd. -- Pavement Removal 4.20 6,607.02 3. 2,773.2 Sq.Ft. Sidewalk and Driveway Removal 0.30 831.96 4. 134.0 Cu.Yd. Unclassified Excavation 4.15 556.10 1,6141.y 5. 1,132.C Del.Yd. 7" Concrete Pavement 13.65 15,4';9.99 Ida 312.Sb 6. 814.6 Sq. Ft. 4" and 5" Walk 1.60 1,303.36 7. 3,419 Sq.Ft. 6" Walk and Drive 1.75 5,983.25 8. 1,152 LF Lawn Restoration behind curb 4.20 4,838.40 9. 024.4 u Da., M.L.11....l 5.50 '1,53'1.20 10. 00 3q.Yd. Di Lu,,,.L L 11 8i1..I Ll it 11.34 997.92 11. 21 Lr Ctandard Curb and Cuttcr 10.50 220.50 Subtotal $ 72,295.26 4S, 439,w, B. Hazel Street 710.40 1. ' ,' 7" Concrete Pavement 8.08 14,232.92 $14, 306 ,4S 210: 1 2. 219.5 Bq.Yd. Pavement Removal 4.20 921.90 862. 42 498.41 . 722.4 Cq.rt. Driveway & Sidewalk Removal 0.30 216.72 Zoq, s2 129.0 4. . 133.0 3 ..FL. 4" and 5" Sidewalk 1.60 244.0o 206.yd 5. 843.9 Sq.Ft. 6" Sidewalk 1.75 1,476.83 O.K. 306.4 6. 320 Lr Lawn Restoration behind curb 4.20 1,344.00 7. -0- Unclassified Excavation -0- 20. 8. 338.5 Cq.Yd. 7" Concrete Pavement 13.65 4,620.53 2po•87 Subtotal 23,057.70 421,201,Yq PUBLIC WORKS CONTRACTORS • MUNICIPAL • COMMERCIAL • INDUSTRIAL • NEW DEVELOPMENTS N59 W14601 BOBOLINK AVE. • MENOMONEE FALLS, WI 53051 • (414)252-3200 ////li Howard Needles, Tammen & Bergendoff Page 2 P.O. Box 526 Oshkosh, WI 54902 ` Attn: George Russell, Jr., P.E. Project Engineer Summary of Extras: �� ��� '�6 3, 4 39. � - Washington Avenue $-?2,295.26 211 2 0 4.y9 Hazel Street TOTAL $95,352.96 door-79.1.3 f It must be understood that we are to be paid the bid unit price of $32.00/LF of sewer trench and that the 05,352.96 lc in addition to that price. Should you have any questions in regard to this matter, please feel free to give me a call. Very truly yours, SUPER EXCAVATORS, INC. omas G. Rit Vice President cc: Steve Dittmer TGR/sg , 9, Change Order No. 2 September 4 . 1986 Contract No. 86-04/05, Ceape Avenue/Hazel St . Sewer Interceptor Owner : City of Oshkosh Contractor: Super Excavators Inc. Engineer : Howard Needles Temmen & Bergendoff Contract No. 86-04/05. Ceape Avenue/Hazel St. Sewer Interceptor is hereby amended and changed as follows: Item No. 1 - Additional Sanitary and Storm $10,845 . 15 Connections at the Menomonee Park Pump Station . (Attachment A ) Item No. 2 - Addition of Bulkhead and Invert. $507 .67 to Manhole 8/46. (Attachment B) State St . Pump Station Landscaping Credit ( -$3,000.00) (Attachment C) Quantity Ad,ustment (Attachment £H ( -$46,937 .75) Total ( -$38 ,584 .93) Original Amount of Contract $2,828,455.00 Total Amount of Previous Change Orders to Date 100,627. 15 Previous Ad)usted Contract Amount $2,929,282. 15 Change Order No. 2 Amount ( -$38,584 .93) Total Amount of Current Contract Including C.O. No. 2 $2,890,697.22 RECOMMEN E D: /Y , ,,_ - ' By _ _ , , : L!,',)6 , _.k...,,____zt,z, t4. _ _ `6ii-eCtor of F)LI ,b i :t orks City Manager <L, :3 \ HNTB, esident Engine r r City -Ierk Approved and Accepte Super Excavators I . I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh . Wisconsin , under the within Change Order . "kJ' ',( k•-•,'t ''i (, Uil 1,/ Ap r ved As T.4111 F.rm: Comptroller City Attorney Cp mica mE1,r A . ze . SUPER __ ( ._ ... .... _ ___ E X C /. V /. T ❑ RS , , ��; \_ SUPER EXCAVATORS, INC. . ESTABLISHED IN 1950 - 1 August 15, 1986 RECEIVED Howard Needles Tamnen & Bergendoff P O. Box 526 AUC 19, see Oshkosh, Wisconsin 54902 Er<t�FF Re: Ceape Street/hazel Street Inteceptor YN dt,BEftG,W+kLKEE. WISCOOMSV4 City # 86-4 & 86-5 Super # 85028 _ Dear Mr. Russell: The following is the itemized billing for extra work performed at the Monomonee Park Pump Station Site: MATERIALS: '108 LF 6" SDR 35'6 PVC @ 1.53 $ 165.24 v 2 Ea 6x6 Wyes @ 12.65 25.30' ✓ 2 Ea 6" Cleanout Adaptor @ 11.07 22.14 41 Ea 6" 222° Bends @ 6.41 - 6.41/ ' 2 Ea 6" Male Plug @ 5.73 11.46' 41 Ea 6"X4 " Fernco - @ 17.59 17.59' ✓ 3 Ea 6" 45°Bend - @ 6.41 . 19.23' v10 Gal Hydro @ 6.72 67.20 ' ✓ 2 Cu Yd Concrete . @ 1+5.05 90.10 w25 Ton 3/8" Stone @ 5.04 126.00 ' ✓ 20 Ton Granular Backfill @ 4.52 90.40 ' $ 4,49.;-$3. (,4/,O'1 15 % Overhead & Profit 96./4 MATERIAL SUBTOTAL $ 4,34..565- 73T. .2 3 V EQUIPMENT: ✓ 13.5 Hrs. 166 Koehring Backhoe @ 35.00/Hr 472.50' /29.0 Hrs. 580 Case Backhoe @ 22.00/Hr 638.00' X23.0 Hrs. Air compressor & Hammer @ 30.00/Hr 690.00 ' 6/12.0 Hrs. Triaxle Dump Truck W/Oper @ 34.00/Hr 408.00 ' SUBTOTAL $ 2208.50 15% Overhead & Profit 331.28 EQUIPMENT SUBTOTAL 2539.78 V/ PUBLIC WORKS CONTRACTORS • MUNICIPAL • COMMERCIAL • INDUSTRIAL • NEW DEVELOPMENTS N59 W14601 BOBOLINK AVE. • MENOMONEE FALLS, WI 53051 • (414)252-3200 Page 2 LABOR 30.0 Hrs. Foreman @ 19.61 588.301 r 40.5 Hrs. Mason @ ,,19.11 773.96 37.5 Hrs. Pipelayer ,@ 18.21 682.88 ' 42.5 Hrs. Operator @ 20.94 889.95 ' , 7,0 ..1.911. -Hrs. Laborer/Learner @ 12.98 1+G.C22' /�•7 8 34.5 Hrs. Laborer @ 15.11 521.30 ' SUBTOTAL . 9-}e-/— 25'99.17 Plus 53.7 % Burden 1-988.5-C /932.17.5.° 15% Overhead and Profit T3 829.?9✓ 45405v£4.- 36/fill ✓ LABOR SUBTOTAL $ 4 SUBCONTRACTORS: Jim Fisher Construction C . (' " ' "01"1"j )tJ ) 296.00 au. • M. P. Kelley Plumbing Co. 852.98 �35 ?' $�tu p. SUBTOTAL 1148.98V, `� 6'og 5% Profit and Margin 57.45 ✓ �-a'Z3 SUBCONTRACTOR SUBTOTALS 1206.431/ SUMMARY: • Materials 4361.99 739• . 3" Equipment 2539.78✓ Labor 64+5- 43471,7I✓ Subcontractors 1206.43 TOTAL _ $ , 10 84St5� Enclosed is a copy of the work order covering this work. Process the change order to cover these additional costs. Very truly yours, SUPER EXCAVATORS, INC. 1/ .� ,_ 'i Thomas G. Ritzer' Vice President TGR/cpm enclosure . _ I I I 4� .`_til a t� JJj LEI - I MT C ..r 4 ' �, I } 1`► I 1 I c r\ _ — —,—� I 1 I T� 's '.!1 1 I I - `I1 'n 4 � I y 1 ei� I ri) eY1 .. I m i * S. fi i- ( 1 ' AI ' \ \. E 4 W SA \ i �. _ j � w � [r] Z W ° t 4 om\ ..'N-- - 'tL '�e - � ¢, ler . 1 .,I ,,4 �r 0` 9 imlia ,--1 1 I I I II r� i g Wz �� C , zo �` i I ) , Ii 4 0 g �� t 8 z N � v, A ,.; , I 1 w 0 � ' 1, .� ■ ti I z ; ' 1, al c■ k` y,, 4 11 I� �n O �; I h i 1 _, �� ` Q �. CC r 1 e : * a V T N. 1 ' I � i I it / v �� �I ! J in I O li teri 0....1 ,... ........ ...„ i,, 1 LI 1 to I v Qi — s. L, i.::: _._— _� —i—_- wz fi -. I 2 '4t :::41 I/g ri i A " lj 1 1 t....4i, —74— z r ca ` ____1J = C '' I I w C -J -.4- �i —I T iF O ii •+ IJ � z -. _ _ T U H C 1 1 J II >, � S , . v b II o I' a • et NI 2 ... sal c. L) t- .--st Q \ Q • � }7'I \ I I I t I ►q► v T s 1'' Y. 1 i a I �— — 1 _ ;, w o '"1 � 77. y--■ ...›.-:j - , 1. li p W O �1 y ... w . — 1 c, - , •, ‘, 0 ,,f.1) z - ...= .1 0 1.4,4 --. �I ! p (~ fr L� C 1 r 4 •• c` c ,. 'C • L J z z y i j L _,;.4 N Li . i� l I ( �I ^ J . \ v J '. T j / �j / -1 '. 1 -?4 1 v CAT) ����,,, - _ = w Z I .. I. L r i yJ :). O o N �, t :� 31 —I E"4 7. v " V ' „.4.49 '.... . . j..- z � N A A .4 _ Lit j 6:1. u il O a Z '' u 3 o w a = ., k v 3 c Z 4,4 o u ti a \ v - �' i 1 .1., ........ ' 4 r J p v _ .a *e--.,. 14223 y r ;1E) c , ..c 4 ' IA '.4 • z 1 ci .1 ei rn L.:_. 0.0 ,_, .,.. , . ... , .., „.4 cz , , , ... cir) R � lI i � , I 1 12 ,,1 is •-=‘1 ,.. .. -_ I 9® O I r 0..._, „,) r4 r:: ,.,,i .3 , •, 1 a . p-;-.M . 1.4 j ,.. 1 I 1 N 0 1 I p ° er II� � o _z "1 C. ,,z, -1) c T:11::: U r I f' .;:t.,,: , ...,.-.;_:: . •,..,/ „ ''TI • . L4 i . -i, rg} s e r_ , ►r r.t +ill -i -t SUPER EXCAVATORS, INC. { I N 59 W 14601 BOBOLINK AVENUE MENOMONEE FALLS, WISCONSIN 53051 ' - =; ' .�-= TELEPHONE 252-3;00 : s:Y��F�- Y� " YT3$4_ • WORK ORDER -. 4 .si Date 7 - 22 - �� } :. Charge to: / ' C17 cF �3flXdiA C.DtIf/`AC � rY'X- O�p r 1`• -; 3 Job i Q /I A L Q I / x xYr 4 1 - j-', s e- %a v e s� � fib,; I i - /-% e ,rz cr n I t•.- L•'' • Approved by / HOWARD NEEDLES TAMMEN 81. BERGENDOFF August 4, 1986 Mr. Thomas Ritzer Vice President • Super Excavators, Inc. N59W 14601 Bobolink Ave. Menomonee Falls, WI . 53051 Re: Oshkosh Sewer Rehabilitation Project • Ceape Avenue/Hazel St. Sewer Interceptor r , r ' ''ti- ` Deer Mr . Ritzer : Please find attached Change Order Initiator Requests to perform the following additional items on the subject contract: o Install a new 6" sewer to provide service to the zoo area. o Install .a 6" lateral to provide service to the existing public restrooms at the Me-nominee Park Pump Station. o Install new storm sewer piping to connect the existing sump pump in the basement of the Menominee Park Pump Station with the existing 24" storm sewer . Super Excavators is authorized to proceed on a time and material basis on all of these items. If you have any questions please do not hesitate to call . Very truly yours, - HOWARD NEEDLES TAMMEN & BERGENDOFF j;ifrtir 41,4 George E. Russell , P.E. Resident Engineer cc: Mr . Gerald Konrad, City of Oshkosh Mr. Thomas Konrad, City of Oshkosh Mr . Lloyd Hanke, Super Excavators Mr. Jeff Mazanec, HNTB HNTB File No. 6378-32-04/05 Architects Engineers Planners One Park Plaza-Suite 600,11270 West Park Place,Milwaukee,Wisconsin 53224,414 359-2300 Partners James F. Finn PE. Paul L Heineman PE. Gerard F.Fox PE, Browning Crow PE. Charles T.Hennigan PE, Daniel J.Watkins PE. Daniel J.Seigel PE, John L.Cotton PE, Francis X.Hall PE, Robert S.Coma PE. Donald A.Dupes PE. William Love AIA, Robert D.Miller PE. James L Tuttle,Jr.PE, Hugh E.Schae PE, Cary C Goodman AIA, Gordon H.Staney,Jr.PE, Harvey K.Hammond,Jr.PE Associates Daniel J.Appel PE, Robert W.Richards PE. Don R.Ort PE. Frederick H.Sterbenz PE, Robert B.Kollmar PE. Kendall T.Lincoln CPA, Jack P.Shedd PE, Roberts W Smilhem PE Richard D.Beckman PE. Harry 0.Beriossa PE. Ralph E.Robison PE, Cecil P.Counts-PE, Stephen G.Goddard PE. Stanley I.Mast PE. Robert W.Anna PE, Walter Sharko PE. James 0.Russell PE, Ross L.Jensen AIA. Frank T.Lamm PE. Alexander F.Silady PE, John W.Wight PE, Thomas K.Dyer PE, Ronald W Aaron AIA, H.Jerome Buller PE. Blaine M.Carriers PE,Michael P.Ingardia PE, Bernard L.Prince PE.Stephen B.Quinn PE.Saul A.Jacobs PE,James A.Smith, Ronald F.Turner AIA. C.Frank Harscner,Ill, Ewing H.Miller FAIA. Douglas C.Myhre PE.Carl J.Mellea PE Offices Alexandria.VA, Atlanta.GA. Austin.TX, Baton Rouge,LA, Boston.MA. Casper,WY, Charleston,WV. Chicago,IL, Cleveland,OH. Dallas,TX. Denver,CO, Fauheid. NJ, Houston.TX, Indianapolis, IN, Kansas City.MO, Lexington,KY, Lexington,MA, Los Angeles.CA, Miami,FL. Milwaukee.WI.Minneapolis, MN, Newark.GE, New York,NY, Orlando.FL. Overland Park,KS, Philadelphia.PA, Phoenix.AZ, Raleigh,NC, Seattle,WA, Tampa.FL,Tulsa,OK (� � o INITIATOR CHANGE ORDER REQUEST' Project Title Ceape Ave . /Hazel St . Sewer Interceptor ProjectNo. 6378 -contract No. 86-04/05 Contractor Super Excavators Inc. Proposed By ; HNTB Date 7/29/86 (Name) Prepares By : HNTB Date 7/29/86 • (Name) Change Request Justification : A new 6" lateral is required because no provisions were included in the original contract for picking up the existing bathroom facilities that are to remain in service . •The lateral from the • existing bathrooms currently runs into the 36" sewer which is to be abandoned. • Contractor authorized to proceed with this change © YES Q NO on Time and material Description of Work to be Performed: Install 6" lateral as shown on the attached sketch from M. H . 5-2A to the south wall of the existing pump station . Also provide interior plumbing -modifications necessary to connect existing restroom facilites . A new cleanout will be required before the service lateral passes through the station wall . The extra work shall include the , removal of piping to be abandoned- _ i as shown in the attached sketch . • The existing water service to the toilet in the south corner of the pump station is to .be abandoned back to a point to be determined in the field by the Engineer . All abandoned piping is to be removed . HNTB APPROVAL A ,. de DATE 11A k O',,WER APPROVAL a .d...4_ DATE • '. TRACTOR APPRQVAL DATE kMLU-11 INITIATOR CHANGE ORDER REQUEST' • Project Title Ceape Ave . /Hazel St . Sewer Interceptor ProjectNo. 6378 . _co„tract No. 86-04/05 Contractor Super Excavators Inc. Proposed by HNTB .y • Date 7/29/86 HNTB (Name) Prepared By : Date 7/29/86 Marne) ` Chance Request Justification : • A new 6" storm lateral is required because no provisions were •~<r included in the original contract for picking up flows from the existing pump stations sump pump . The sump pump must remain in service . I Contractor authorized to proceed with this change © YES Q NO on 7/29/86 Time and material Description of Work to be Performed: Install 6" lateral as shown on the attached sketch from the north wall of the pump station to the existing 24" storm sewer. Also provide interior piping modification so that the pump discharge runs above grade before exiting the N . E .. wall of the pump statior . The extra 'work shall include the removal of piping to be abandoned _ as shown in the attached sketch . • • hwTB APPROVAL )) ' -k1 DATE -) /Z7/0G 'r O',;N ER APPROVAL A „, ,�` w DATE '..: :;TRACTOR APPROVAL DATE /ri=0.-j\ \_._.rlril c INITIATOR CHANGE ORDER REQUEST'• Project Title Ceape Ave . /Hazel St . Sewer Interceptor Project No. 6 3 7 8 -t;ontract No. 86-04/05 Contractor Super Excavators Inc. Proposed by : HNTB Date 7/29/86 HNTB (Name) s) Prepared By : Date 7/29/86 • (Name) ss- Chance Request Justification : Sewer Extension required in order to connect existing sewers located in the zoo property . The existing sewers in the zoo were not shown on the as built drawings and no provisions had therefore _ been made to pick up the zoo sewers as part of the 86-04/05Contract Contractor authorized to proceed with this change • © YES El NO on 7/29/86 _ Time and Material Description of Work to be Performed: 'Install a new 6" diameter sewer as shown on the attached sketch. The new sewer should - be laid of a constant slope fram the • location where the existing sewer is connected to the invert of the new 15" sewer at M. H . No. 5-2A. - Proviae three new cleanouts along the line as indicated in the _ attached sketch . • • • FINTB APPROVAL ,� S /' DATE / 36 ig(1) _�',;itiER APPROVAL '���;���1 . s.� DATE ms - ' ;;TRACTOR APPROVAL DATE i'�\`VJ TJJ ° Made by G dl Date �l//p,� Job No. L�,8_72_ay `-"^BARD NEEDLE TAMMEN&BERGENOOFF Checked by Date ! Sheet No. For ENot PARK ' M ' S TION — . BAN PePJh N ���� , NOTE; ' x Ac T Lo�pT ou _ of AL Wets/ L�uES ; _ . I ; S ' , TO BE Lot A rc,o __rU—_FI FIELD 6Y fN 6 I N E E_R 1 , I ? 1 : , ! ! ; : 1 ! 1 • 1 Iii / iIii i SEE 'MIL 1 Z� 1 ATTACH ID rt - FEuL -- —. n.N#s z� i j I" , • \New , Y :1---0 Liu J c.o. , � -C.D---r SRN 'K \� - i , 7/Jy NEi✓ O' SeN 90 /vc \` -----MATCH: ; `ia,g3 21uv, sevFR FOR zao Lswe H Z U 1 v - ��.33 "'�.e f1ENOP'tINEF . . ; c4r 7,, /vv. 42.433 STATION _STaRM Servitra. ---. . , gS.Zi Su v. 41.14( • O - -1—.._._--- + 1 1VE , - . ��NNr FR 011 evttSG m�4_11-40(0_ v r t.rters INV q :t - 371 '��ss N ■ ' - ---- _— --- -- -- - _ -- j-► 1 - G 11040m _ - ,_ _ -_ _TO - ( _ 1 SUR$AC $SUH f a !�ETAI L A- n SumP CoNMECTto t , „Pvc— —1nrErru� _,t N . N;. =imp. _ _ 1-- N.E. SrA>rou Aftrolco WALL . is • 1 pa,' 45.11 * ' STokr . ---- _EXISTING ---- LATDIAL 0744 STbR. —1 \0 L C l. .O C i .. o \ Na N Q V `, O `1• o O o Q .. • . • .. * - - • -**. cA- °. - •'. 1 N' __ VW O 1 _ V O 6 a , NI V v ) o N. W- ■' It . 2 V Q o Pz, • , /...,/," .4. ' f•IA . ,...r...(....6.. /, a .t . ... 7 ;6-1:9.q. 0,74....-z %w t. .N.. .. t , ii; . .. o ____t__" - 41•4.",11 -IN t''' sbb\.t . ... ..:. 0 ! "NL.N...-. __ • ,t C - ., • % . Nro 46 jlicts z .... :: -,t,14, L 0 T! to CI kg- in I?. t /I :-... V fir. 4 �2 �••�• .� r • V ` W ' ' c0 ��- i . w ....1•'.. :1 :. ..•' O ,/ •,-/;',',.- . • I— • %`1' til NN (4.. • .r 1 `,,ti �.° :.'`- e d . , I iii • "' b•i r ' Li.• 111 i= - `-- 1p, z Q T yJ 3� • L v z .0 •.:1 d a •. - 111 1 11 I ¢ - : N t t■ / ° Made by 6RL Date?/3�/e� Job No.4�B_��4 HOWARD NEEDLES TAMMEN B.BERGENDOFF Checked by Date Sheet No. For , i T��C70IVA/ Cfried O 54A/fr4Ry AND .SL"2P LATZ'R�LS } -4 - -- _: ii __ .I_-._- _-y i I `r # `- -z. a: ` I/ I � 1 ! —I y i o 6 - - (Ni - -r �4 t 1—• - .__L-_ ..-. '---_I_�---.---, '' v I r ►. �, '' ----- > - � - - ! i E I W. Li CO La z 1f __ µ 7 1 1 'J i 1 to te a am _..,�.. , 4 £ ga .. ua c.N Cr zi C CO , it ` e t e O > ` V. .,�..,,r. - - C_ - . - 1` � a�• ___ - - ---- - - -'- O. . _ - - C ' �_J �a�a�.,�45L� _y. - - —._°' I do - '- ut _�.. 42 :Ltil ' :* 3 Z ; .., 4 ..• t !of Z --� H.._ _ --- 1 _ _..._t____ � '�E ; I I! 1 i : j i , Es 5 o r .._ —4' It I J� . � _ a --- 4. j i _ I � c- I r . _ _ .. ; � � _ ; ! 1 t►:� i ; , , ? : , , - i � I i J E --- I O - ea s 1 I 1 .! I 41— W , 4 • A1m H I SUPER ( E X C L) V A T C R 5 SUPER EXCAVATORS, INC. ESTABLISHED IN 1950 • August 13, 1986 • Howard Needles Tammen & Bergendoff P. 0. Box 526 Oshkosh, Wisconsin 54903 — _ Attn: Mr. George Russell - RECEIVED �/T.,�� Project Engineer 1 Re: Ceape Ave/ Hazel Street Interceptor AUG 15 19$6 City # 83-4 & 86-5 Super No. 85028 - . KWARlis NEEDLES, YAMMER 4 Dear Mr. Russell: xwa4___ . The following is the itemized billing for the extra work performed on July 24, 1986 to reconstruct sanitary Manhole 8/ 1 94 - Materials: 25=Ea. Barrell Block @ $1.65/EA 41.25v' 20 Ea. Concrete Brick @ 0.50/Ea 10.00✓ 1 Cu. Yd Concrete @ 45.05 Cu. Yd 45.05' 2 Bags Masonary Mortor @ 6.20/Bag 12.40V' 108.70v/ 15% Overhead & Profit 16.31 MATERIAL SUBTOTAL 125.01 Labor: 1 Hr Foreman @ $ 19.61 19.61v. 3.5 Hrs Mason @ 19.11 $S,L 44.97 5 Pipelayer @ 18.21 .. 9 I, O S 3 Labor/Learn @ 12.98 38.94" 216.49' ve 53.7% Burden 116.26 15% Overhead & Profit 49.91' LABOR SUBTOTAL 382.66 ' PUBLIC WORKS CONTRACTORS • MUNICIPAL • COMMERCIAL • INDUSTRIAL • NEW DEVELOPMENTS N59 W14601 BOBOLINK AVE. • MENOMONEE FALLS, WI 53051 • (414)252-3200 ,014://r Page 2 T " Summary: Material 125.01 Labor 382.66 TOTAL 507.67 Please process the change order to cover these additional costs Very truly yours, :ER EXCAVATORS, INC. 4-3‘).Y. Thomas G. Ritzer Vice President cpm C=O )c Date RECORD OF 9/es/�( HOWARD NEEDLES TAMMEN d BERDENOOFF Job TELEPHONE CALL No. 316 -3 2/4y/OJ' TO G A U S S C/,1 OF 1i -4-V FROM 'CS7 ZC)v OF Upn,, LkGie7 V4TDet,J SUBJECT DISCUSSED L tin scn prh-c. C n n ,9r (are- 7' farm p 5771-77-74.1 3 Q 0 6 crr.01-4-t igtrzorffitic i p saw/ 2b'co nrn ACTION TO BE TAKEN I �pLL ow ,, /11770.) h ty d S 4-1, RTTZEl NOTE: This record is to be retained in the file. GN119 574 5M Change Order No. 2 Page 1 of 1 Contract No. 86-04/05 FINAL QUANTITY ADJUSTMENTS Bid Bid Schedule Final 'As Net Unit Extended Item No. Quantity Built' Quantity Price Change Quantity Change Amount 1 150 LF 137 LF (-13 LF) $34/LF ( -$422.00) 2 595 LF 557 LF (-38 LF) $60/LF (-$2,280.00) 3 1100 LF 1106 LF +6 LF 549/LF +5294.00 4 1350 LF 1336.5 LF (-13.5 LF) $186.50/LF (-$2,517.75) 5. 5550 LF 5539 LF ( -11 LF) $300/LF ( -$3,300.00) 6. 366 VF - 334.72 VF (-31.28 VF) 5100/VF (-$3, 128.00) 7 . 1 EA 2 EA +1 EA 52400/EA +52,400.00 10. 130 EA "111 EA (-19 EA) 5500/EA ( -$9,500.00) 11 . 9040 LF 8900.5 LF ( -139.5 LF) 032iLF ( -54 ,464 .00) 12. 160 CY 0 CY (-160 CY) 5120/CY ( -$19,200.00) 13 . $10,000 LS $5,200 LS ( -$4,800 LS) LS ( -$4,800.00) TOTAL ( -546,937.75)