Loading...
HomeMy WebLinkAboutMiron Construction/Change Order G-17/Oshkosh Centre CHANGE Distribution to: ORDER OWNER ❑ ARCHITECT ❑ AM DOCUMENT G701 CONTRACTOR ❑ FIELD ❑ OTHER ❑ PROJECT: OSHKOSH CENTRE CHANGE ORDER NUMBER: G-17 (name, address) Oshkosh, Wisconsin INITIATION DATE: January 13, 1986 TO (Contractor): ARCHITECT'S PROJECT NO: 1383 I—P. G. Miron Construction Co. ,Inci 806 Valley Road CONTRACT FOR: General Project Work Menasha, WI 54952 Entire Project 1 CONTRACT DATE: December 20, 1984 You are directed to make the following changes in this Contract: Provide Oak Trim on Corridor Light Fixtures. Structural beams in the two locations would not allow fixtures to be installed at design height. A/E requested that light fixtures be dropped in height and oak trim added to cover unfinished portion of light fixture. ADD $667.00 f L l(J 6 II i1 1 l r , (Proposal Attached) City a ...._. ._ ... Not valid until signed by both the Owner and Architect. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. The original (Contract Sum) (Guaranteed Maximum Cost) was $ 3,675,000.00 Net change by previously authorized Change Orders $ (480,666.37) The (Contract Sum) (Guaranteed Maximum Cost) prior to this Change Order was $ 3,194,333.63 The (Contract Sum) (Guaranteed Maximum Cost) will be (increased) (decreased) (unchanged) by this Change Order $ 667.00 The new (Contract Sum) (Guaranteed Maximum Cost) including this Change Order will be $ 3,195,000.63 The Contract Time will be (increased) (decreased) (unchanged) by ( 0 ) Days. The Date of Substantial Completion as of the date of this Change Order therefore is March 28, 1986 • Authorized: REINKE, HANSCHE, LAST, INC. P. G. MIRON CONSTRUCTION CO. 1TNHNE CITY OF OSHKOSH ARCHITECT COONTR Va101e Road OL15 RChurch Street 805 North Main Street t8s b6 Y Address Address Addr s Oshkosh, WI 54901 Menasha, WI 54952 Ostskosh, WI 54901. BY W(04 EN., c ( 7,r i,4..--- I Bey" :s i. u F F• w gr " iJe!CG DATE 9/�T��L DATE /- (6 And: 71•ounce C. Serwas,Citycle AIA DOCUMENT G701 • CHANGE ORDER • APRIL 1978 EDITION • AIA® • © 1978 Date: 2/7/86 THE AMERICAN INSTITUTE OF ARCHITECTS,1735 NEW YORK AVE., N.W.,WASHINGTON, D.C. 20006 G701 —1978 Telephone (414)734-4161 P. G . MIRON CONSTRUCTION CO . , INC . P G CONTRACTORS • CONSTRUCTION MANAGERS • MACHINE ERECTORS • DESIGN SERVICES P.O. Box 962 Appleton, WI 54912 December 27, 1985 Reinke, Hansche, Last, Inc. 805 N. Main Street Oshkosh, Wisconsin 54901 RE: OSHKOSH CENTRE Gentlemen: We propose to furnish labor and material to trim the light fixtures in the corridor with oak plywood as instructed for the sum of $667.00 (Six Hundred, Sixty-Seven Dollars) . Please issue a change order in the above amount at your earliest convenience. Should you have any questions please feel free to call. Sincerely, P. G. MIRON CONSTRUCTION ah� Gregory A. Kippenhan President GAK/kb • CHANGE Distribution to: ORDER OWNER ❑ ARCHITECT ❑ AIA DOCUMENT G701 CONTRACTOR ❑ FIELD ❑ OTHER ❑ PROJECT: OSHKOSH CENTRE CHANGE ORDER NUMBER: G-17 (name, address) Oshkosh, Wisconsin INITIATION DATE: January 13, 1986 TO (Contractor): ARCHITECT'S PROJECT NO: 1383 �P . G. Miron Construction Co. ,Inc7.1 806 Valley Road CONTRACT FOR: General Project Work Menasha, WI 54952 Entire Project CONTRACT DATE: December 20, 1984 You are directed to make the following changes in this Contract: Provide Oak Trim on Corridor Light Fixtures. Structural beams in the two locations would not allow fixtures to be installed at design height. A/E requested that light fixtures be dropped in height and oak trim added to cover unfinished portion of light fixture. ADD $667.00 1 1 t (, .(. .tip t (Proposal Attached) r .+5r Not valid until signed by both the Oocner and Architect. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. The original (Contract Sum) (Guaranteed Maximum Cost) was $ 3,675,000.00 Net change by previously authorized Change Orders $ (480,666.37) • The (Contract Sum' (Guaranteed Maximum Cost) prior to this Change Order was $ 3,194,333.63 • The (Contract Sum! (Guaranteed Maximum Cost) will be (increased) (decreased) (unchanged) by this Change Order $ 667.00 The new (Contract Sum) (Guaranteed Maximum Cost) including this Change Order will be $ 3,195,000.63 The Contract Time will be (increased) (decreased) (unchanged) by ( 0 ) Days. The Date of Substantial Completion as of the date of this Change Order therefore is March 28, 1986 Authorized: REINKE, HANSCHE, LAST, INC. P. G. MIRON CONSTRUCTION CO. THE CITY OF OSHKOSH ARCHITECT CONTRACTOR O R., 805 North Main Street 806 Valley Road lw� hunch Street Address Address Address Oshkosh, WI 54901 Menasha, WI 54952 Oshkosh WI 54901 ' am • aeh�,Ci•Pl ag DirE AO DATE (t6 And: onga . . _ erwas, ityClerk AIA DOCUMENT G701 • ( Ii•AV(ir • AI'hII l' tt FI/IIItr‘• • • - , Date: W7-6 111 \\II.RicAN i's1 I: rr (1 :A,( hill( H !•4t ,An.v lint. vv. ,_.. G701 — 1978 Telephone(414)734-4161 P. G . MIRON CONSTRUCTION CO . , INC. P G ' CONTRACTORS • CONSTRUCTION MANAGERS • MACHINE ERECTORS • DESIGN SERVICES P.O. Box 962 Appleton, WI 54912 December 27, 1985 Reinke, Hansche, last, Inc. 805 N. Main Street Oshkosh, Wisconsin 54901 RE: OSHKOSH CENTRE Gentlemen: We propose to furnish labor and material to trim the light fixtures in the corridor with oak plywood as instructed for the sum of $667.00 (Six Hundred, Sixty-Seven Dollars) . Please issue a change order in the above amount at your earliest convenience. Should you have any questions please feel free to call. Sincerely, P. G. MIRON CONSTRUCTION ` ;YJ Gregory A. Kippenhan President GAK/kb - CHANGE Distribution to: ORDER OWNER ❑ ARCHITECT ❑ A!A DOCUMENT G701 CONTRACTOR LI FIELD ❑ OTHER ❑ PROJECT: OSHKOSH CENTRE CHANGE ORDER NUMBER: G-l7 (name, address) Oshkosh, Wisconsin INITIATION DATE: January 13, 1986 TO (Contractor): ARCHITECT'S PROJECT NO: 1383 P. G. Miron Construction Co. ,Inc.) 806 Valley Road CONTRACT FOR: General Project Work Menasha, WI 54952 Entire Project dCONTRACT DATE: December 20, 1984 You are directed to make the following changes in this Contract: Provide Oak Trim on Corridor Light Fixtures. Structural beams in the two locations would not allow fixtures to be installed at design height. A/E requested that light fixtures be dropped in height and oak trim added to cover unfinished portion of light fixture. ADD $667.00 hTh • aar1 (Proposal Attached) !4i;-',, Not valid until signed by both the Owner and Architect. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. The original (Contract Sum) (Guaranteed Maximum Cost) was $ 3,675,000.00 Net change by previously authorized Change Orders $ (480,666.37) The (Contract Sum) (Guaranteed Maximum Cost) prior to this Change Order was $ 3 ,194, 333.63 The (Contract Sum) (Guaranteed Maximum Cost) will be (increased) (decreased) (unchanged) by this Change Order $ 667.00 • The new (Contract Sum) (Guaranteed Maximum Cost) including this Change Order will be $ 3,195 ,000.63 The Contract Time will be (increased) (decreased) (unchanged) by ( 0 ) Days. The Date of Substantial Completion as of the date of this Change Order therefore is March 28, 1986 Authorized: REINKE, HANSCHE, LAST, INC. P. G. MIRON CONSTRUCTION CO. THE CITY OF OSHKOSH ARCHITECT C NJRACTOR O v.ER 805 North Main Street 80o Valley Road 2JH Church Street Address Address Addr Oshkosh, WI 54901 Menasha, WI 54952 Os ikosh, WI 54901 BY AL(.917A-1/ RY A. �� s £ /,-E_�'.! RYW1 iam n_Fru i,City. 1i� id / • DATE f/l7/e( _ [);\Tt_ 1 -C) '"I Donna /C.Serwas,CCii•tyCler AIA DOCUMENT G7111 • ( fI,AAGI ()KEW: • Ai'R11 iii-r: 1 M,t1' H • AI V • Date: 2:/7/86 ME:WI:_RICAN INCIIIt_'If IN \K: :1 i( H I ..A 1 s% N, AI-I'Hi.t(iA IH G701 - 1978 Telephone (414)734-4161 P. G . MIRON CONSTRUCTION CO . , INC. P G CONTRACTORS • CONSTRUCTION MANAGERS • MACHINE ERECTORS • DESIGN SERVICES P.O. Box 962 Appleton, WI 54912 December 27, 1985 Reinke, Hansche, Last, Inc. 805 N. Main Street Oshkosh, Wisconsin 54901 RE: OSHKOSH CENTRE Gentlemen: We propose to furnish labor and material to trim the light fixtures in the corridor with oak plywood as instructed for the sum of $667.00 (Six Hundred, Sixty-Seven Dollars) . Please issue a change order in the above amount at your earliest convenience. Should you have any questions please feel free to call. Sincerely, P. G. MIRON CONSTRUCTION 'AO Gregory A. Kippenhan President GAK/kb •