HomeMy WebLinkAboutMiron Construction/Change Order G-16/ CHANGE Distribution to:
ORDER OWNER ❑
ARCHITECT ❑
AIA DOCUMENT G701 CONTRACTOR ❑
FIELD ❑
OTHER ❑
PROJECT: OSHKOSH CENTRE CHANGE ORDER NUMBER: G-16
(name, address) OSHKOSH, WISCONSIN
INITIATION DATE: January 13, 1986
TO (Contractor):
ARCHITECT'S PROJECT NO: 1383
P. G. Miron Construction Co.
806 Valley Road CONTRACT FOR: General Project C-ork
Menasha, WI 54952 Entire Project
LJ CONTRACT DATE: December 20, 1984
You are directed to make the following changes in this Contract:
Provide expansion joint covers at through-wall Masonry control joints. Covers re.:uested
by A/E to prevent splitting of wall covering and to cover joint in wall covering.
ADD $75 3.o o
� ��► 9 Div
(Proposal Attached)
Not valid until signed by both the Ooner and Architect
Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time.
The original (Contract Sum) (Guaranteed Maximum Cost) was $ 3,675.000.00
Net change by previously authorized Change Orders $ (481,419. 37)
The (Contract Sum) (Guaranteed Maximum Cost) prior to this Change Order was $ 3,193,580.63
The (Contract Sum) (Guaranteed Maximum Cost) will be (increased) (decreased) (unchanged)
by this Change Order $ 753.00 .
The new (Contract Sum) (Guaranteed Maximum Cost) including this Change Order will be $ 3,194, 333.63 .
The Contract Time will be (increased) (decreased) (unchanged) by ( ) Days.
The Date of Substantial Completion as of the date of this Change Order therefore is March 28, 1986 .
Authorized:
REINKE, HANSCHE, LAST, INC. P. G. MIRON CONSTRUCTION CO. THE CITY OF OSHKOSH
ARCHITECT CONTRACTOR Ol NE_'
805 North Main- Street 806 Valley Road 215 'Church street-
Address Address Address
Oshkosh, WI ^54^901 Menasha, WI 54952 Oshkosh, WI 54901
GY 5 "� • I;Y / AiT Siam D.Fru,h,(TCIT- x
DAI L /1171/4)‘ _i_\II /--Z-_g6 IAnH: U}' 'IA)6-- 44i-1,6"G e-to./
-- _— S-erwas,city0
I. •
AIA DOCUMENT 6701 • ( la V`.� Iii
TIif .��11"SIC \.. IAtil :1 1. ..
Date: 2/7/86 1. 701 107/3
Telephone (414)734-4161
r 4.
a P. G . MIRON CONSTRUCTION CO . , INC .
P " G ` CONTRACTORS • CONSTRUCTION MANAGERS • MACHINE ERECTORS • DESIGN SERVICES
P.O. Box 962 Appleton, WI 54912
January 2, 1986
Reinke, Hansche, Last, Inc.
805 N. Main St.
Oshkosh, WI 54901
ATTN: Mr. Dave Malmgren
RE: Oshkosh Centre
Oshkosh, WI
Dear Dave:
As requested, please see the breakdown below for the expansion
joints change order dated December 27, 1985.
Construction Specialties $263.00
16-Hours Labor 392.00
P.G. Miron Management Fee 98.00
$753.00
We would be willing to do this on a time and material not to
exceed basis, for the 16 labor hours if you so choose.
Sincerely:
P.G. MIRON CONSTRUCTION COMPANY, INC.
1
/ /
A. Kippenhan
President
GAK/dmk
" Telephone (414)734-4161
P . G . MIRON CONSTRUCTION CO . , INC.
CONTRACTORS • CONSTRUCTION MANAGERS • MACHINE ERECTORS • DESIGN SERVICES
P.O. Box 962 Appleton, WI 54912
December 27, 1985
REINKE, HANSCHE, LAST, INC.
805 North Main Street
Oshkosh, Wisconsin 54901
RE: Oshkosh Convention Centre
Oshkosh, Wisconsin
Dear Sir:
We propose to furnish labor and material to provide Construction
Specialties Model #EAFW expansion joint covers in Room Nos. 107,
108, 109, 117, stair No. 1 for the sum of $753.00. This figure
is based on using one color at all locations. There is a four to
six week order time needed for delivery. Please inform us as to
your decision.
Sincerely,
P. G. MIRON CONSTRUCTION COMPANY, INC.
Gregory A. Kippenhan
President
GAK/cjl
a
CHANGE Distribution to:
ORDER OWNER LI
ARCHITECT ❑
AM DOCUMENT 0701 CONTRACTOR ❑
FIELD ❑
OTHER ❑
PROJECT: OSHKOSH CENTRE CHANGE ORDER NUMBER: G-16
(name, address) OSHKOSH, WISCONSIN
INITIATION DATE: January 13, 1986
TO (Contractor):
ARCHITECT'S PROJECT NO: 1383
P. G. Miron Construction Co.
806 Valley Road CONTRACT FOR: General Project Work
Menasha, WI 54952 Entire Project
L _j CONTRACT DATE: December 20, 1984
You are directed to make the following changes in this Contract:
Provide expansion joint covers at through-wall Masonry control joints. Covers requested
by A/E to prevent splitting of wall covering and to cover joint in wall covering.
ADD $753.00
ld',- .,-":-...;\-- 1 do
Al 1,1*T..
\._ a.:'' '..,-,-.:
(Proposal Attached) r
Not valid until signed by both the O\o nor and Architect.
Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time.
The original (Contract Sum) (Guaranteed Maximum Cost) was $ 3,675.000.00
•
Net change by previously authorized Change Orders $ (481,419.37)
•
The (Contract Sum) (Guaranteed Maximum Cost) prior to this Change Order was $ 3, 193,580.63
•
The (Contract Sum) (Guaranteed Maximum Cost) will be (increased) (decreased) (unchanged)
by this Change Order $ 753.00 .
The new (Contract Sum) (Guaranteed Maximum Cost) including this Change Order will be $ 3,194, 333.63 .
The Contract Time will be (increased) (decreased) (unchanged) by ( ) Days.
The Date of Substantial Completion as of the date of this Change Order therefore is March 28, 1986 .
Authorized:
REINKE, HANSCHE, LAST, INC. P. G. MIRON CONSTRUCTION CO. THE CITY OF OSHKOSH
ARCHITECT CONTRACTOR NER
805 North Main Street 806 Valley Road 215 Church Street
Address Address Address
Oshkosh, WI 54901 Menasha, WI 54952 Oshkosh„WI 54901
_- � __
�� � _
BY /2"(C91744.4- BY 111 �� / /f/��.1�_ l��� C �
B ~ . —
DATE /47/fir I)A FE - (o 72Z/1 A) .:e4e. •aj
AIA DOCUMENT C701 • ( If 1, (,f , Hi ill vI'Ki. N', ) I • • I" Date: 2/7/86
Ill! \.A1CRI(;AN IA'tii.IF tii \K, '11, I ' , ,.i.A '0 • ... , _ G701 -1978
Telephone (414)734-4161
F P. G . MIRON CONSTRUCTION CO . , INC.
P G CONTRACTORS • CONSTRUCTION MANAGERS • MACHINE ERECTORS • DESIGN SERVICES
P.O. Box 962 'Appleton, WI 54912
December 27, 1985
REINKE, HANSCHE, LAST, INC.
805 North Main Street
Oshkosh, Wisconsin 54901
RE: Oshkosh Convention Centre
Oshkosh, Wisconsin
Dear Sir:
We propose to furnish labor and material to provide Construction
Specialties Model #EAFW expansion joint covers in Room Nos. 107,
108, 109, 117, stair No. 1 for the sum of $753.00. This figure
is based on using one color at all locations. There is a four to
six week order time needed for delivery. Please inform us as to
your decision.
Sincerely,
P. G. MIRON CONSTRUCTION COMPANY, INC.
Gregory-A. Kippehhan
President
GAK/cjl
s,61g703Q
Telephone (414)734-4161
P. G . MIRON CONSTRUCTION CO • • INC.
P ' CONTRACTORS • CONSTRUCTION MANAGERS • MACHINE ERECTORS • DESIGN SERVICES
P.O. Box 962 Appleton, WI 54912
January 2, 1986
Reinke, Hansche, Last, Inc.
805 N. Main St.
Oshkosh, WI 54901
ATTN: Mr. Dave Malmgren
RE: Oshkosh Centre
Oshkosh, WI
Dear Dave:
As requested, please see the breakdown below for the expansion
joints change order dated December 27, 1985.
Construction Specialties $263.00
16-Hours Labor 392.00
P.G. Miron Management Fee 98.00
$753.00
We would be willing to do this on a time and material not to
exceed basis, for the 16 labor hours if you so choose.
Sincerely:
P.G. MIRON CONSTRUCT ION COMPANY, INC.
//c
Gregor`A. Kippnhan
President
GAK/dmk