Loading...
HomeMy WebLinkAboutMiron Construction/Change Order G-16/ CHANGE Distribution to: ORDER OWNER ❑ ARCHITECT ❑ AIA DOCUMENT G701 CONTRACTOR ❑ FIELD ❑ OTHER ❑ PROJECT: OSHKOSH CENTRE CHANGE ORDER NUMBER: G-16 (name, address) OSHKOSH, WISCONSIN INITIATION DATE: January 13, 1986 TO (Contractor): ARCHITECT'S PROJECT NO: 1383 P. G. Miron Construction Co. 806 Valley Road CONTRACT FOR: General Project C-ork Menasha, WI 54952 Entire Project LJ CONTRACT DATE: December 20, 1984 You are directed to make the following changes in this Contract: Provide expansion joint covers at through-wall Masonry control joints. Covers re.:uested by A/E to prevent splitting of wall covering and to cover joint in wall covering. ADD $75 3.o o � ��► 9 Div (Proposal Attached) Not valid until signed by both the Ooner and Architect Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. The original (Contract Sum) (Guaranteed Maximum Cost) was $ 3,675.000.00 Net change by previously authorized Change Orders $ (481,419. 37) The (Contract Sum) (Guaranteed Maximum Cost) prior to this Change Order was $ 3,193,580.63 The (Contract Sum) (Guaranteed Maximum Cost) will be (increased) (decreased) (unchanged) by this Change Order $ 753.00 . The new (Contract Sum) (Guaranteed Maximum Cost) including this Change Order will be $ 3,194, 333.63 . The Contract Time will be (increased) (decreased) (unchanged) by ( ) Days. The Date of Substantial Completion as of the date of this Change Order therefore is March 28, 1986 . Authorized: REINKE, HANSCHE, LAST, INC. P. G. MIRON CONSTRUCTION CO. THE CITY OF OSHKOSH ARCHITECT CONTRACTOR Ol NE_' 805 North Main- Street 806 Valley Road 215 'Church street- Address Address Address Oshkosh, WI ^54^901 Menasha, WI 54952 Oshkosh, WI 54901 GY 5 "� • I;Y / AiT Siam D.Fru,h,(TCIT- x DAI L /1171/4)‘ _i_\II /--Z-_g6 IAnH: U}' 'IA)6-- 44i-1,6"G e-to./ -- _— S-erwas,city0 I. • AIA DOCUMENT 6701 • ( la V`.� Iii TIif .��11"SIC \.. IAtil :1 1. .. Date: 2/7/86 1. 701 107/3 Telephone (414)734-4161 r 4. a P. G . MIRON CONSTRUCTION CO . , INC . P " G ` CONTRACTORS • CONSTRUCTION MANAGERS • MACHINE ERECTORS • DESIGN SERVICES P.O. Box 962 Appleton, WI 54912 January 2, 1986 Reinke, Hansche, Last, Inc. 805 N. Main St. Oshkosh, WI 54901 ATTN: Mr. Dave Malmgren RE: Oshkosh Centre Oshkosh, WI Dear Dave: As requested, please see the breakdown below for the expansion joints change order dated December 27, 1985. Construction Specialties $263.00 16-Hours Labor 392.00 P.G. Miron Management Fee 98.00 $753.00 We would be willing to do this on a time and material not to exceed basis, for the 16 labor hours if you so choose. Sincerely: P.G. MIRON CONSTRUCTION COMPANY, INC. 1 / / A. Kippenhan President GAK/dmk " Telephone (414)734-4161 P . G . MIRON CONSTRUCTION CO . , INC. CONTRACTORS • CONSTRUCTION MANAGERS • MACHINE ERECTORS • DESIGN SERVICES P.O. Box 962 Appleton, WI 54912 December 27, 1985 REINKE, HANSCHE, LAST, INC. 805 North Main Street Oshkosh, Wisconsin 54901 RE: Oshkosh Convention Centre Oshkosh, Wisconsin Dear Sir: We propose to furnish labor and material to provide Construction Specialties Model #EAFW expansion joint covers in Room Nos. 107, 108, 109, 117, stair No. 1 for the sum of $753.00. This figure is based on using one color at all locations. There is a four to six week order time needed for delivery. Please inform us as to your decision. Sincerely, P. G. MIRON CONSTRUCTION COMPANY, INC. Gregory A. Kippenhan President GAK/cjl a CHANGE Distribution to: ORDER OWNER LI ARCHITECT ❑ AM DOCUMENT 0701 CONTRACTOR ❑ FIELD ❑ OTHER ❑ PROJECT: OSHKOSH CENTRE CHANGE ORDER NUMBER: G-16 (name, address) OSHKOSH, WISCONSIN INITIATION DATE: January 13, 1986 TO (Contractor): ARCHITECT'S PROJECT NO: 1383 P. G. Miron Construction Co. 806 Valley Road CONTRACT FOR: General Project Work Menasha, WI 54952 Entire Project L _j CONTRACT DATE: December 20, 1984 You are directed to make the following changes in this Contract: Provide expansion joint covers at through-wall Masonry control joints. Covers requested by A/E to prevent splitting of wall covering and to cover joint in wall covering. ADD $753.00 ld',- .,-":-...;\-- 1 do Al 1,1*T.. \._ a.:'' '..,-,-.: (Proposal Attached) r Not valid until signed by both the O\o nor and Architect. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. The original (Contract Sum) (Guaranteed Maximum Cost) was $ 3,675.000.00 • Net change by previously authorized Change Orders $ (481,419.37) • The (Contract Sum) (Guaranteed Maximum Cost) prior to this Change Order was $ 3, 193,580.63 • The (Contract Sum) (Guaranteed Maximum Cost) will be (increased) (decreased) (unchanged) by this Change Order $ 753.00 . The new (Contract Sum) (Guaranteed Maximum Cost) including this Change Order will be $ 3,194, 333.63 . The Contract Time will be (increased) (decreased) (unchanged) by ( ) Days. The Date of Substantial Completion as of the date of this Change Order therefore is March 28, 1986 . Authorized: REINKE, HANSCHE, LAST, INC. P. G. MIRON CONSTRUCTION CO. THE CITY OF OSHKOSH ARCHITECT CONTRACTOR NER 805 North Main Street 806 Valley Road 215 Church Street Address Address Address Oshkosh, WI 54901 Menasha, WI 54952 Oshkosh„WI 54901 _- � __ �� � _ BY /2"(C91744.4- BY 111 �� / /f/��.1�_ l��� C � B ~ . — DATE /47/fir I)A FE - (o 72Z/1 A) .:e4e. •aj AIA DOCUMENT C701 • ( If 1, (,f , Hi ill vI'Ki. N', ) I • • I" Date: 2/7/86 Ill! \.A1CRI(;AN IA'tii.IF tii \K, '11, I ' , ,.i.A '0 • ... , _ G701 -1978 Telephone (414)734-4161 F P. G . MIRON CONSTRUCTION CO . , INC. P G CONTRACTORS • CONSTRUCTION MANAGERS • MACHINE ERECTORS • DESIGN SERVICES P.O. Box 962 'Appleton, WI 54912 December 27, 1985 REINKE, HANSCHE, LAST, INC. 805 North Main Street Oshkosh, Wisconsin 54901 RE: Oshkosh Convention Centre Oshkosh, Wisconsin Dear Sir: We propose to furnish labor and material to provide Construction Specialties Model #EAFW expansion joint covers in Room Nos. 107, 108, 109, 117, stair No. 1 for the sum of $753.00. This figure is based on using one color at all locations. There is a four to six week order time needed for delivery. Please inform us as to your decision. Sincerely, P. G. MIRON CONSTRUCTION COMPANY, INC. Gregory-A. Kippehhan President GAK/cjl s,61g703Q Telephone (414)734-4161 P. G . MIRON CONSTRUCTION CO • • INC. P ' CONTRACTORS • CONSTRUCTION MANAGERS • MACHINE ERECTORS • DESIGN SERVICES P.O. Box 962 Appleton, WI 54912 January 2, 1986 Reinke, Hansche, Last, Inc. 805 N. Main St. Oshkosh, WI 54901 ATTN: Mr. Dave Malmgren RE: Oshkosh Centre Oshkosh, WI Dear Dave: As requested, please see the breakdown below for the expansion joints change order dated December 27, 1985. Construction Specialties $263.00 16-Hours Labor 392.00 P.G. Miron Management Fee 98.00 $753.00 We would be willing to do this on a time and material not to exceed basis, for the 16 labor hours if you so choose. Sincerely: P.G. MIRON CONSTRUCT ION COMPANY, INC. //c Gregor`A. Kippnhan President GAK/dmk