HomeMy WebLinkAboutMiron Construction/Change Order G-15/Elevator CHANGE
ORDER cr,',.I '�
AKCI II 1 E(I
A/A 1X()CL),A 1LV!7 C701 (_O,N T R:1CTORR ❑
HEED ❑
OTHER ❑
PROJECT: OSHKOSH CENTRE CHANGE ORDER NUMBER: G-15
(name, address; Oshkosh, Wisconsin
INITIATION DATE: January 13, 1986
TO (Contractor):
ARCHITECT'S PROJECT NO: 1383
• P. G. Miron Construction Co.
806 Valley Road CONTRACT FOR: General Project Work
Menasha, Wisconsin 54952 Entire Project
CONTRACT DATE: December 20, 1984
S c)u are directed to make the following changes in this Contract:
Install a Non-penetrable ceiling in Elevator
Equipment Room 114 per State Elevator
Elevator Inspection
ADD $363.00
r
p
(Proposal Attached)
\rat arid until signed by both the Oooncr and Architect_
c: Jtwc rtf thr Contractor !:rOcate- nen'v',M, :nclue n5 any adjustment in the Contract Sum or Cnn•:,ct Tinu'.
The original ,Contract Sum! ;Guaranteed :Maximum Cost) was $ 3,675,000.00
Net change by previously authorized Change Orders c (481,782. 37)
•
The (Contract Sum) (Guaranteed Maximum Cost) prior to this Change Order was s 3, 193, 217.63
The (Contract Sum) (Guaranteed Maximum Cost± will be (increased) (decreased, (unchanged)
by this Change Order S 363.00
•
The new (Contract Sum! ;Guaranteed Maximum Cost) including this Change Order will be S 3,193, 580.63
•
The Contract Time will he (increased! (decreased) (unchanged) by ( 0 ) Days.
The Date of Substantial Completion as of the date of this Change Order therefore is March 28, 1986
Authorized:
REINKE, HANSCHE, LAST, INC P. G. MIRON CONSTRUCTION CO. THE CITY OF OSHKOSH
ARC !Jj C CONT R 0
dO� N. Main Street Nob T Malley Road 11'.' s Church Street.
\ddr ss Address Addr ss
6shkosh, WI 54901 , Menasha, WI 54952 Fish sh, WI 5 901
BY A (R4 BY 3u C(.• ` ' •v W0.1-/am
W 0.lj am D.F uP• Cit
.nage
DATE //�G DATE — And% llt,,ai G - 14 Lra"
Donna__i.- Re was,City Clerk
MA DOCUMENT cast • cHAAc r ();DER 11,11 ._f)IllC)N • A,.;" ar: Date: 2/7/86
HI Ir AA'rcICAN. 1AtiTI1Thr or AR:.ti: E TS, lass .N}.\. 1(�'-:K s.. 5'.:A`,H'V(,TOA t)C G701 1978
Telephone (414)734-4161 6'
k P. G . MIRON CONSTRUCTION CO . , INC.
CONTRACTORS • CONSTRUCTION MANAGERS • MACHINE ERECTORS • DESIGN SERVICES
P.O. Box 962 Appleton, WI 54912
January 1, 1986
Reinke, Hansche, Last, Inc.
805 N. Main St.
Oshkosh, WI 54901
RE: Oshkosh Center
Oshkosh, WI
Gentlemen:
We propose to furnish labor and material to install a ceiling in
the equipment room #114 for the sum of $363.00. This figure does
not include any painting.
The breakdown is as follows:
Appleton Lathing $316.00
P.G. Miron Management Fee 47.00
$363.00
Sincerely:
P.G. Miron Construction Corporation, Inc.
7�
' , /
Gregory A. Kippenhan
President
GAK/dmk
. ,
0 [-1:713 17:3)En
AU
APPLETON LATHING CORPORATION
,..
1195 N. Perkins St.
- •
APPLETON, WI 54914 - . •_
Phone 734•1741
,
TO
CHANGE ORDER NO.. -
-
ir .1 LA L -
_
*mime
DA
PHO' NE
.4,..e..HAUE Atin 1147A1Irell
JON NUMBER
.,
. .
__e_itelt#41etar_ _a.z a ip m a,ri-f-
c .-.-
4,
. ..
r . .
. _._13_ ___5*-_l____,4401_,./-___i__!1_____Wri.f./APt,/.( .. , . •
_____.
, /...„„,,,
---k-ir --,-1
!,. , :-....1,,....._L,..;._,....C4,..._...ct.z_e__:t2(.:..7%If gI. - 4.:,
4
, --.- ..1-**#1,_____1____/_11,SiSe/1 ..2 V'x :-.)41 dit.c.ces
-----------— - - - --
, .. .
-
_ ______ _,.
_
, .
- :t•,, .,-•!-., .
•
iii -<)il 0
l'Idta: This revision becomes • tt of,end in conftAillibi4fth,the Width*contra-a.:
,.,...;*-4&,2,-
WE AGREE netemmake changes as specified above,at this price $
,..:;,.--' •'".,:
PREVIOUS
Date ."',...i:':fr 11_.-.- , . CONTRACT $
,,,,, ..4.0 ,..0 • '44." REVISED ... -,%..=:, ..I':''''
,
nature) cotrraAcr $
g
t
„,
ACCEPTED:.The: :, ,-. ” des and specifications of this Change Order are satisfarrtrid
are herebtiecetAkt: ) WOrk,' under same terms and coAciftitppevear ed
in misfiled contract-thilese o fpulated. ..‘--
.'''''.'7,•..;•4 -. -,,,.,
_... .
,-,
Pete
- . ' slaieturs
4.0
CHANGE
ORDER tA',NiK
ARC1111( I Li
A/A DO( LINILN''r (;70/ CON IRACTOR ❑
FIELD ❑
OTHER ❑
PROJECT: OSHKOSH CENTRE CHANGE ORDER NUMBER: G-15
(name, address) Oshkosh, Wisconsin
INITIATION DATE: January 13, 1986
TO (Contractor):
ARCHITECT'S PROJECT NO: 1383
P. G. Miron Construction CO-71
806 Valley Road CONTRACT FOR: General Project Work
Menasha, Wisconsin 54952 Entire Project
LCONTRACT DATE: December 20, 1984
1'cu are directed to make the following changes in this Contract:
Install a Non-penetrable ceiling in Elevator
Equipment Room 114 per State Elevator
Elevator Inspection
ADD $363.00
\-
9 1
(Proposal Attached) y
N t v,:;:ci untli •inncci I;v h(Oit ;he Ov:nc-r anci Architect.
S Mc C. 1.'.:(t(1r ^e.catt agreement ren y,rth, including any ad,urment in the Contract Sum or Cnr;r.trt lints
The original Contract Sum! !Guaranteed .Maximum Cost) was S 3,675,000.00
Net change b', previously authorized Change Orders $ (481,782.37)
The Contract Sumi (Guaranteed Maximum Cost) prior to this Change Order was s 3,193, 217.63
•
The (Contract Sum) (Guaranteed Maximum Cost) will be (increased) (decreased) (unchanged)
b■5 this Change Order $ 363.00
The new (Contract Sum) !Guaranteed Maximum Cost) including this Change Order will he S 3,193,580.63 .
The Contract Time \\ill be (increased (decreased: (unchanged) by ( 0 ) Days.
The Date of Substantial Completion as of the date of this Change Order therefore is March 28, 1986
Authorized:
REINKE, HANSCHE, LAST, INC P. G. MIRON CONSTRUCTION CO. THE CITY OF OSHKOSH
SRC` iU ( N. Main Street COST bx�Tgalley Road o�� 15 Chtlrch Street
-lddr�« Adcir•�c Addr cs.
bshkosh, WI 54901 Menasha, WI 54952 Fist:kosh,,/WWII 54901
�j'
>> acm+ '�' C�`�l / z-�. t- dam D.Fr eh i_ •-ger
DATE //17//I DATE. —1C iz, s; 'I/t. L
And ') . • 4 ' • 1
leak
Aix oocUuP•T Crat • CHANGE ORDr AFti, i ;1)111((S. 1 Date: 2/7/86
i:. ,,,..,:'H.,( .\N (NT HO . Of AK(Ctn LC 's, 17i; '-,, l',' )1r,te o(. tc vv' vt. .°.ti. ,•. G7O1 — 1978
im Telephone (414)734-4161
P. G . MIRON CONSTRUCTION CO . , INC .
CONTRACTORS • CONSTRUCTION MANAGERS • MACHINE ERECTORS • DESIGN SERVICES
P.O. Box 962 Appleton, WI 54912
January 1, 1986
Reinke, Hansche, Last, Inc.
805 N. Main St.
Oshkosh, WI 54901
RE: Oshkosh Center
Oshkosh, WI
Gentlemen:
We propose to furnish labor and material to install a ceiling in
the equipment room #114 for the sum of $363.00. This figure does
not include any painting.
The breakdown is as follows:
Appleton Lathing $316.00
P.G. Miron Management Fee 47.00
$363.00
Sincerely:
P.G. Miron Construction Corporation, Inc.
.�t, " .
Gregory A. Kippenhan
President
GAK/dmk
- ;
: A NCaC (�( n1E
APPLETON LATHING CORPORATION
1195 N. Perkins St.
APPLETON, WI 54914
Phone 734-1741
TO
CHANGE ORDER NO.. -
/r.2`.7 3-tS"
PHONE
`` ,.#Co S k M•er,. T-Q1r. an NUMBER
DATE OREItreT1NA-CONTRACT
. sTq.i'. L1. .90 man+ r.,..___i_ty _______________
3
,. _ -�r!--.-.__-�-_"'x^7,1,-/!. -• •2 i H..�° :.,.Se■�� ces� Alt '4"..-._
r
- .1(111-12/'r " MA) ... .;sge,......../4,.._ .:-- .g____________-• _______. ,
IMdbe 7hi:revision - . • .�
•__ becomes • rt of,and in cottfor>Ia With the sedating contrjet
WE AGREE fieretiknake changes as s
•
pecified pacified above,at this price 4 $
Date
PREVIOUS
;` CONTRACT
E �� _, ".. AMOUNT ..
REVISED
�►r. nature) TCONTRac". $ » ,
t y .r
are�eby atkci0 .t� and specifications of this Change Order are sat�sf if
in arfg at Cw,ttact ur leSs,o under same terms and ed
ipulated. '
ti $
Date '-- .;;
Signature
rte.. "�$if