HomeMy WebLinkAboutMiron Construction/Change Order G-15/Elevator CHANGE ORDER cr,',.I '� AKCI II 1 E(I A/A 1X()CL),A 1LV!7 C701 (_O,N T R:1CTORR ❑ HEED ❑ OTHER ❑ PROJECT: OSHKOSH CENTRE CHANGE ORDER NUMBER: G-15 (name, address; Oshkosh, Wisconsin INITIATION DATE: January 13, 1986 TO (Contractor): ARCHITECT'S PROJECT NO: 1383 • P. G. Miron Construction Co. 806 Valley Road CONTRACT FOR: General Project Work Menasha, Wisconsin 54952 Entire Project CONTRACT DATE: December 20, 1984 S c)u are directed to make the following changes in this Contract: Install a Non-penetrable ceiling in Elevator Equipment Room 114 per State Elevator Elevator Inspection ADD $363.00 r p (Proposal Attached) \rat arid until signed by both the Oooncr and Architect_ c: Jtwc rtf thr Contractor !:rOcate- nen'v',M, :nclue n5 any adjustment in the Contract Sum or Cnn•:,ct Tinu'. The original ,Contract Sum! ;Guaranteed :Maximum Cost) was $ 3,675,000.00 Net change by previously authorized Change Orders c (481,782. 37) • The (Contract Sum) (Guaranteed Maximum Cost) prior to this Change Order was s 3, 193, 217.63 The (Contract Sum) (Guaranteed Maximum Cost± will be (increased) (decreased, (unchanged) by this Change Order S 363.00 • The new (Contract Sum! ;Guaranteed Maximum Cost) including this Change Order will be S 3,193, 580.63 • The Contract Time will he (increased! (decreased) (unchanged) by ( 0 ) Days. The Date of Substantial Completion as of the date of this Change Order therefore is March 28, 1986 Authorized: REINKE, HANSCHE, LAST, INC P. G. MIRON CONSTRUCTION CO. THE CITY OF OSHKOSH ARC !Jj C CONT R 0 dO� N. Main Street Nob T Malley Road 11'.' s Church Street. \ddr ss Address Addr ss 6shkosh, WI 54901 , Menasha, WI 54952 Fish sh, WI 5 901 BY A (R4 BY 3u C(.• ` ' •v W0.1-/am W 0.lj am D.F uP• Cit .nage DATE //�G DATE — And% llt,,ai G - 14 Lra" Donna__i.- Re was,City Clerk MA DOCUMENT cast • cHAAc r ();DER 11,11 ._f)IllC)N • A,.;" ar: Date: 2/7/86 HI Ir AA'rcICAN. 1AtiTI1Thr or AR:.ti: E TS, lass .N}.\. 1(�'-:K s.. 5'.:A`,H'V(,TOA t)C G701 1978 Telephone (414)734-4161 6' k P. G . MIRON CONSTRUCTION CO . , INC. CONTRACTORS • CONSTRUCTION MANAGERS • MACHINE ERECTORS • DESIGN SERVICES P.O. Box 962 Appleton, WI 54912 January 1, 1986 Reinke, Hansche, Last, Inc. 805 N. Main St. Oshkosh, WI 54901 RE: Oshkosh Center Oshkosh, WI Gentlemen: We propose to furnish labor and material to install a ceiling in the equipment room #114 for the sum of $363.00. This figure does not include any painting. The breakdown is as follows: Appleton Lathing $316.00 P.G. Miron Management Fee 47.00 $363.00 Sincerely: P.G. Miron Construction Corporation, Inc. 7� ' , / Gregory A. Kippenhan President GAK/dmk . , 0 [-1:713 17:3)En AU APPLETON LATHING CORPORATION ,.. 1195 N. Perkins St. - • APPLETON, WI 54914 - . •_ Phone 734•1741 , TO CHANGE ORDER NO.. - - ir .1 LA L - _ *mime DA PHO' NE .4,..e..HAUE Atin 1147A1Irell JON NUMBER ., . . __e_itelt#41etar_ _a.z a ip m a,ri-f- c .-.- 4, . .. r . . . _._13_ ___5*-_l____,4401_,./-___i__!1_____Wri.f./APt,/.( .. , . • _____. , /...„„,,, ---k-ir --,-1 !,. , :-....1,,....._L,..;._,....C4,..._...ct.z_e__:t2(.:..7%If gI. - 4.:, 4 , --.- ..1-**#1,_____1____/_11,SiSe/1 ..2 V'x :-.)41 dit.c.ces -----------— - - - -- , .. . - _ ______ _,. _ , . - :t•,, .,-•!-., . • iii -<)il 0 l'Idta: This revision becomes • tt of,end in conftAillibi4fth,the Width*contra-a.: ,.,...;*-4&,2,- WE AGREE netemmake changes as specified above,at this price $ ,..:;,.--' •'".,: PREVIOUS Date ."',...i:':fr 11_.-.- , . CONTRACT $ ,,,,, ..4.0 ,..0 • '44." REVISED ... -,%..=:, ..I':'''' , nature) cotrraAcr $ g t „, ACCEPTED:.The: :, ,-. ” des and specifications of this Change Order are satisfarrtrid are herebtiecetAkt: ) WOrk,' under same terms and coAciftitppevear ed in misfiled contract-thilese o fpulated. ..‘-- .'''''.'7,•..;•4 -. -,,,., _... . ,-, Pete - . ' slaieturs 4.0 CHANGE ORDER tA',NiK ARC1111( I Li A/A DO( LINILN''r (;70/ CON IRACTOR ❑ FIELD ❑ OTHER ❑ PROJECT: OSHKOSH CENTRE CHANGE ORDER NUMBER: G-15 (name, address) Oshkosh, Wisconsin INITIATION DATE: January 13, 1986 TO (Contractor): ARCHITECT'S PROJECT NO: 1383 P. G. Miron Construction CO-71 806 Valley Road CONTRACT FOR: General Project Work Menasha, Wisconsin 54952 Entire Project LCONTRACT DATE: December 20, 1984 1'cu are directed to make the following changes in this Contract: Install a Non-penetrable ceiling in Elevator Equipment Room 114 per State Elevator Elevator Inspection ADD $363.00 \- 9 1 (Proposal Attached) y N t v,:;:ci untli •inncci I;v h(Oit ;he Ov:nc-r anci Architect. S Mc C. 1.'.:(t(1r ^e.catt agreement ren y,rth, including any ad,urment in the Contract Sum or Cnr;r.trt lints The original Contract Sum! !Guaranteed .Maximum Cost) was S 3,675,000.00 Net change b', previously authorized Change Orders $ (481,782.37) The Contract Sumi (Guaranteed Maximum Cost) prior to this Change Order was s 3,193, 217.63 • The (Contract Sum) (Guaranteed Maximum Cost) will be (increased) (decreased) (unchanged) b■5 this Change Order $ 363.00 The new (Contract Sum) !Guaranteed Maximum Cost) including this Change Order will he S 3,193,580.63 . The Contract Time \\ill be (increased (decreased: (unchanged) by ( 0 ) Days. The Date of Substantial Completion as of the date of this Change Order therefore is March 28, 1986 Authorized: REINKE, HANSCHE, LAST, INC P. G. MIRON CONSTRUCTION CO. THE CITY OF OSHKOSH SRC` iU ( N. Main Street COST bx�Tgalley Road o�� 15 Chtlrch Street -lddr�« Adcir•�c Addr cs. bshkosh, WI 54901 Menasha, WI 54952 Fist:kosh,,/WWII 54901 �j' >> acm+ '�' C�`�l / z-�. t- dam D.Fr eh i_ •-ger DATE //17//I DATE. —1C iz, s; 'I/t. L And ') . • 4 ' • 1 leak Aix oocUuP•T Crat • CHANGE ORDr AFti, i ;1)111((S. 1 Date: 2/7/86 i:. ,,,..,:'H.,( .\N (NT HO . Of AK(Ctn LC 's, 17i; '-,, l',' )1r,te o(. tc vv' vt. .°.ti. ,•. G7O1 — 1978 im Telephone (414)734-4161 P. G . MIRON CONSTRUCTION CO . , INC . CONTRACTORS • CONSTRUCTION MANAGERS • MACHINE ERECTORS • DESIGN SERVICES P.O. Box 962 Appleton, WI 54912 January 1, 1986 Reinke, Hansche, Last, Inc. 805 N. Main St. Oshkosh, WI 54901 RE: Oshkosh Center Oshkosh, WI Gentlemen: We propose to furnish labor and material to install a ceiling in the equipment room #114 for the sum of $363.00. This figure does not include any painting. The breakdown is as follows: Appleton Lathing $316.00 P.G. Miron Management Fee 47.00 $363.00 Sincerely: P.G. Miron Construction Corporation, Inc. .�t, " . Gregory A. Kippenhan President GAK/dmk - ; : A NCaC (�( n1E APPLETON LATHING CORPORATION 1195 N. Perkins St. APPLETON, WI 54914 Phone 734-1741 TO CHANGE ORDER NO.. - /r.2`.7 3-tS" PHONE `` ,.#Co S k M•er,. T-Q1r. an NUMBER DATE OREItreT1NA-CONTRACT . sTq.i'. L1. .90 man+ r.,..___i_ty _______________ 3 ,. _ -�r!--.-.__-�-_"'x^7,1,-/!. -• •2 i H..�° :.,.Se■�� ces� Alt '4"..-._ r - .1(111-12/'r " MA) ... .;sge,......../4,.._ .:-- .g____________-• _______. , IMdbe 7hi:revision - . • .� •__ becomes • rt of,and in cottfor>Ia With the sedating contrjet WE AGREE fieretiknake changes as s • pecified pacified above,at this price 4 $ Date PREVIOUS ;` CONTRACT E �� _, ".. AMOUNT .. REVISED �►r. nature) TCONTRac". $ » , t y .r are�eby atkci0 .t� and specifications of this Change Order are sat�sf if in arfg at Cw,ttact ur leSs,o under same terms and ed ipulated. ' ti $ Date '-- .;; Signature rte.. "�$if