HomeMy WebLinkAbout0158261-Plumbing (addn to #155857) � CITY OF OSHKOSH No 158261
OSHKOSH PLUMBING PERMIT -APPLICATION AND RECORD
ON THE WATER
Job Address 1816 VINLAND ST Owner CENTURY OAKS HOMES LLC Create Date 10/14/2013
Contractor O'NEILL ENTERPRISES INC Category 442-Commercial-Interior(New/Relocated Fixt� Plan D9-504-0513-P
Inspector Jerry Fabisch
Bathtub 0 Clothes Wshr 0 Classrm Sink 0 Surgeons Sink 0 Roof Drain 0 Deduct Meters 0
Shower 0 Lndry Tray 0 Exam Sink 0 Sterilizer 0 Soda Disp 0 Wtr Sewer Mtrs 0
Whirlpool _ 0 Sump Pump
Lavatory 0 San Sump/Pump 0 FIr/Wst Sink 0 Bidet 0 Site Drain 4 Misc. 1
Toilet 0 Water Softner 0 Hand Sink 2 Urinai 0 Wait.St. 0 Fixtures
Kit Sink 0 Standp Rec _ 0 Lab Sink 0 Beer Tap 0 Ice Chest p
Disposal 0 Gar Drain 0 Plaster Sink 0 Dip Well 0 Comm Ice Maker 0
Dishwasher 3 Local Waste 0 Sculry Sink 1 Drink Ftn 0 Int Grease Trap 0
Floor Drain 1 Bar Sink 0 Serv Sink 0 Wash Ftn 0 Ext Grease Trap 1
Hose Bibb 2 Breakrm Sink 0 Shamp Sink 1 Catch Basin 0 Eye Wash Statn 0
Water Heater 0 Pedicure chair
Use/Nature CO /MM Additional fixtures added to permit#155857 �
of Work
I
I
Size Material Type # Conn.Type
Sanitary Sewer
Storm Sewer
Water Service
Parcel Id#
1211433009
Valuation $1,000.00 Plan Approval $0.00 Permit Fees $153.00 ❑ Permit Voided !,
Issued By .-.�—'f . Date 10/15/2013
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement,the City strongly urges the permit applicant to contact the
easement holder(s)and to secure any necessary approvals before starting such activity.
Signature Date
AgenUOwner
Address 522 W 6TH AVE OSHKOSH WI 54902 -5916 Telephone Number 920-230-2007
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of
Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone
Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.