HomeMy WebLinkAbout0158217-Building (roof) � CITY OF OSHKOSH No 158217
�
OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD
ON THE WATER
Job Address 1550 FAIRLAWN ST Owner JACQUELINE R RONSON REV LIV TRUST Create Date 10/11/2013
Designer Contractor DARYL CONGER CONSTRUCTION
Inspector Nicole Krahn
Category 041 -Residential Roofing Plan
Type � Building � Sign 0 Canopy 0 Fence � Raze _�
Zoning R-1 Class of Const: Size
Unfinished/Basement Sq.Ft. Rooms Height Ft. ❑ Projection ',
Finished/Living Sq.Ft. Bedrooms Stories Canopies
Garage Sq.Ft. Baths Signs
Foundation � Poured Concrete 0 Floating Slab � Pier � Other
� Concrete Block � Post � Treated Wood
Occupancy Permit Occupancy Fee $0.00 Flood Plain Height Permit
Park Dedication #Dwelling Units 0 #Structures 0
Use/Nature SFR/Re-roofing'Removing old and replacing with new shingles. No structural work.
of Work
, i�
i
i
HVAC Contractor Plumbing Contractor
Electric Contractor
Fees: Valuation $6,800.00 Plan Approval $0.00 Permit Fee Paid $79.00 Park Dedication $0.00
Issued By: �� Date 10/11/2013 Final/O.P. 00/00/0000
—� ❑ PermitVoided Parcelld# 1306931800
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement
holder(s)and to secure any necessary approvals before starting such activity.
I have read and unde t af ine ' n formation. �^�J �
Signature Date X � ( �
AgenUOwner
Address __NESHKORO WI 54960 - 0000 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of
Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone
Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.