HomeMy WebLinkAbout0157958-Electric � CITY OF OSHKOSH No 157958
OSHKOSH ELECTRIC PERMIT -APPLICATION AND RECORD
ON THE WATER
Job Address 3377 OREGON ST Owner ANDREW J/AMY L HANSEN Create Date 09/27/2013
Contractor HOMEOWNER _ Category 612-Residential-Single Family Addition/R Plan
Inspector Adam Krause
Service '� New � Change � Temp � N/A Type 0 Overhead � Underground
Volts Circuits Luminaires
Amps Switches Receptacles
Appliances
�
:
Use/Nature of ISFR/Wire garage'to include 100 amp sub panel. All wiring shall ibe installed per the applicable codes.
Work
Fees: Valuation $1,000.00 Pian Approval $0.00 PermitFee Paid $70.00
Issued By: Date 9/27/2013
� Permit Voided � Parcel Id# 1413660000
The undersigned,in applying for an Electric Permit to perform electrical work within a single family home,owned and occupied
as the principle residence by the undersigned,hereby acknowledges per City Municipal Code Section 11-22,that other
individuals may not be employed to assist with the work described in this permit unless said individuals are licensed by the
City of Oshkosh to perform said work.
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party,if you perform the work
described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement
holder(s)and to secure any eces ry a prov I efore starting such activity.
Signature � 2���- Date p? �
AgenUOwner
Address OSHKOSH WI 5490- 7149 Telephone Number 920-233-7626
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of
Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone
Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.