HomeMy WebLinkAbout0157977-Building � CITY OF OSHKOSH No 157977 � OSHKOSH COMMERCIAL BUILDING PERMIT -APPLICATION AND RECORD ON THE WATER Job Address 525 W 20TH AVE Create Date 09/17/2013 Project Hangar Addition Project Number 20130604 Owner WINNEBAGO COUNTY Plan 661-3871-0913 Contractor D&J QUALITY CONSTRUCTION Inspector Tom Spierowski Designer Category 240-Commercial Accessory Structures Type of Plan Alt. Level 2 Zoning M-3 Square Footage Major Occ S1 -Storage Const Class Type VB Fire Protection � Sprinkled 0 Unsprinkled � Sprinkler Design Occupancy Permit Flood Plain Height Permit Park Dedication #Dwelling Units 0 #Structures 0 ❑ Projecti� Canopies Signs Use/Nature of Work OMM/453 Aviation Dd Hangar Addition*There is no plumbing that will be finished to this building with this project as there is currently no water or isewer to serve the building. � _ I HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $130,000.00 Plan Approval $0.00 Permit Fee Paid $648.00 Park Dedication $0.00 Issued By: t�'� Date 09/27/2013 Final/O.P. 00/00/0000 ❑ Permit Voided I Parcel Id# 1413530000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party,if you perform the work described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement holder(s)and to secure any necessary approvals before starting such activity. I have read a nd the afore ' ed information. �� � / Signature � Date AgenUOwner Address 2415 HICKORY LN OSHKOSH WI 54901 - 2521 Telephone Number 232-0538 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.