Loading...
HomeMy WebLinkAbout0158187-Building (roof, siding & windows) � CITY OF OSHKOSH No 158187 � OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD ON THE WATER Job Address 833 BOWEN ST Owner LAURA P ODONNELL_ _ Create Date 10/02/2013 Designer Contractor PEPPLER REMODELING Inspector Kenneth Gresser Category 041 -Residential Roofing Plan Type � Building 0 Sign � Canopy � Fence � Raze � Zoning R-2 Class of Const: Size Unfinished/Basement Sq.Ft. Rooms Height Ft. ❑ Projection Finished/Living Sq.Ft. Bedrooms Stories Canopies Garage Sq.Ft. Baths __ Signs Foundation � Poured Concrete � Floating Slab � Pier � Other � Concrete Block � Post � Treated Wood _ Occupancy Permit __ Occupancy Fee $0.00 Flood Plain Height Permit Park Dedication #Dweliing Units 0 #Structures 0 Use/Nature SFR/Remove 8 replace roofing on house&garage, install vinyl siding&metal wraps for garage, replace garage door,3 basement j of Work indows,and 2 vinyl replacement windows for kitchen(same size&locations). ' �- ' HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $13,000.00 Plan Approval $0.00 Permit Fee Paid $118.00 Park Dedication $0.00 Issued By: �`� Date 10/10/2013 Final/O.P. 00/00/0000 ❑ Permit Voided' Parcel Id# 1107050000 In the performance of this wo I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkos a no autho � to enforce easement restrictions of which it is not a party,if you perform the work described in this permit ppli tion wi in ment,the City strongly urges the permit applicant to contact the easement holder(s)and to secu a cess a r v s before starting such activity. I have read and un rstan af e i ed information. Signature . Date AgenUOwner Address W2380 COUNTY Q BERLIN WI 54923 - 0000 Telephone Number 920-361-7731 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not perFormed within two business days from the time the project is ready.