Loading...
HomeMy WebLinkAbout0157734-Building (roof) � CITY OF OSHKOSH No 157734 � OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD ON THE WATER Job Address 540 W 6TH AVE Owner GERALD F BLOESL Create Date 09/16/2013 Designer Contractor BILL'S CONSTRUCTION Inspector Tom Spierowski Category 041 -Residential Roofing Plan Type � Building � Sign � Canopy � Fence � Raze j Zoning C-3 Class of Const: Size Unfinished/Basement ___ Sq.Ft. Rooms Height Ft. ❑ Projection I Finished/Living Sq.Ft. Bedrooms Stories Canopies , Garage Sq.Ft. Baths Signs Foundation � Poured Concrete � Floating Slab � Pier � Other � Concrete Block � Post � Treated Wood ----- -- Occupancy Permit Occupancy Fee $0.00 Flood Plain Height Permit Park Dedication #Dwelling Units 0 #Structures 0 Use/Nature SFR/Re-roof to include removal and replacement of existing shingles on the house. No structural work. of Work ' HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $2,000.00 Plan Approval $0.00 Permit Fee Paid $44.00 Park Dedication $0.00 Issued By: �� Date 09/16/2013 Final/O.P. 00/00/0000 ❑ Permit Voided Parcel Id#0600480000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement holder(s)and to secure any necessary approvals before starting such activity. I have read and unde d the f inenti in ion. Signature ���/� Date AgenUOwner Address 3071 BELLAIRE LN _ OSHKOSH WI 54904 - 0000 Telephone Number 920-379-0206 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may ` continue if the inspection is not performed within two business days from the time the project is ready.