Loading...
HomeMy WebLinkAbout0158114-Plumbing (addn to #157633) � CITY OF OSHKOSH No 158114 OSHKOSH PLUMBING PERMIT -APPLICATION AND RECORD ON THE WATER Job Address 731 E MELVIN AVE _ _ Owner CARLOS ALVARENGA Create Date 10/07/2013 Contractor WELLNITZ PLUMBING Category 412-Res-Interior(New/Relocated Fixtures) Plan Inspector Jon Mueller Bathtub 0 Clothes Wshr _ 0 Ciassrm Sink 0 Surgeons Sink 0 Roof Drain 0 Deduct Meters 0 Shower 0 Lndry Tray 0 Exam Sink 0 Sterilizer 0 Soda Disp 0 Wtr Sewer Mtrs 0 Whirlpool 0 Sump Pump 1 F Prep Sink 0 RPZ Valve 0 Coffee Maker 0 Wtr Usage Mtrs 0 Lavatory 0 San Sump/Pump Toilet 0 Water Softner 0 Hand Sink 0 Urinal 0 Wait.St. � Fixtures Kit Sink 0 Standp Rec 0 Lab Sink 0 Beer Tap 0 Ice Chest 0 Disposal 0 Gar Drain 0 Plaster Sink _ 0 Dip Well 0 Comm Ice Maker 0 Dishwasher 0 Local Waste Floor Drain 0 Bar Sink 0 Serv Sink 0 Wash Ftn 0 Ext Grease Trap 0 Hose Bibb 0 Breakrm Sink 0 Shamp Sink 0 Catch Basin 0 Eye Wash Statn 0 Water Heater 0 Use/Nature NSFR/add fixture to permit#157633. Sump pump not on the original permit � of Work � � J Size Material Type # Conn.Type Sanitary Sewer Storm Sewer Water Service Parcel Id# 1108250000 Valuation $200.00 Plan Approval $0.00 Pertnit Fees $9.00 ❑ Permit Voided' Issued By �wL Date 10/07/2013 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement holder(s)and to secure any necessary approvals before starting such activity. Signature Date AgenUOwner Address 1500 N MCCARTHY RD#3 APPLETON WI 54913 -0000 Telephone Number (0)231-7390 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.