HomeMy WebLinkAboutPW CNT 12-13/CHG OR 2 DEPARTMENT OF PUBLIC WORKS — 215 Church Avenue P.O.Box 1130 (0 Oshkosh,Wisconsin 54903-1130 Ph.(920)236-5065 OJHKO/H Fax(920)236-5068 ON THE WATER September 26, 2013 Mr. Bill Bowers Carl Bowers & Sons Construction Company, Inc. N1844 Maloney Road Kaukauna, WI 54130 Re: Change Order No. 2 (Final) Contract 12-13 Dear Mr. Bowers: Enclosed is an executed copy of Change Order No. 2 (Final) between the City of Oshkosh and Carl Bowers & Sons Construction Company, Inc. regarding the abovementioned project. If you have any questions,please call our office at(920)236-5065. Sincerely, D(j(iud IA , - David C. Patek Director of Public Works 'f-`; 2013 DCP/tlt Enclosure: Change Order No. 2 cc: Pam Ubrig, City Clerk(w/original) Lynn Lorenson, City Attorney(w/copy) Edward Nokes, Finance Director(w/copy) File (w/original) I:\Engineering\12-13 2012 Hot Mix Asph Paving&Util\Project_Information\Contract Info\Change Orders112-13 Page 1 of 1 Executed CO ti2 Ltr_9-26-13.docx TO: Carl Bowers&Sons Constr Co Inc CHANGE ORDER#2 N1844 Maloney Road DATED: August 26, 2013 Kaukauna, WI 54130 FINAL Your present contract with the City of Oshkosh, Contract No.12-13, awarded August 14, 2012, is hereby amended and changed to the following due to the acceptance of final quantities: NET DECREASE TO: SECTION I - PAVING (S1,558.86) NET DECREASE TO: SECTION II -STORM SEWER ($7,392.00) NET DECREASE TO: SECTION III -SANITARY SEWER ($585.00) NET DECREASE TO: SECTION IV-WATER MAIN ($1,616.04) NET DECREASE TO CONTRACT ($11,151.90) Section I Section II Section III Section IV (Paving) (Storm) (Sanitary) (Water) Totals Bid Total $478,110.40 $50,455.00 $7,800.00 $259,210.04 $795,575.44 C.O.#1 $0.00 $17,469.00 $80,161.80 $2,110.00 $99,740.80 Prev.Contract Total $478,110.40 $67,924.00 $87,961.80 $261,320.04 $895,316.24 C.O. #2 ($1,558.86) ($7,392.00) ($585.00) ($1,616.04) ($11,151.90) Contract Total $476,551.54 $60,532.00 $87,376.80 $259,704.00 $884,164.34 CITY OF OSHKOSH BY: . 1fetr � Recommended: - City Manager Director of Public Works City Clerk roved and ated: o ccep ntractor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. In Comptroller Approved a l• form: )III. i1 I, L�11* City CONTRACT:12-13 CHANGE ORDER#2(FINAL) SECTION I-PAVING ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 100 Pavement removal, Square complete as specified Yards 215 278.60 63.60 $5.00 $318.00 101 Sidewalk and driveway removal,complete as Square specified Feet 7,100 6,944.30 -155.70 $0.50 ($77.85) 102 Excavation,complete as Cubic specified Yards 4,400 3,842.30 -557.70 $10.75 ($5,995.28) 103 Pavement milling, Square complete as specified Yards 6,400 6,470.60 70.60 $2.00 $141.20 104 7"non-reinforced concrete pavement,HES, including integral curb,5"base material and grading, Square complete as specified Yards 210 271.80 61.80 $45.45 $2,808.81 105 HMA pavement type E-1, complete as specified Tons 3,100 2,838.00 -262.00 $65.00 ($17,030.00) 106 Tack coat,complete as specified Gallons 275 275.00 $6.50 107 Curb and gutter removal and replacement,complete Linear as specified Feet 400 837.50 437.50 $23.00 $10,062.50 108 Standard 18"curb and gutter,7",complete as Linear specified Feet 400 370.80 -29.20 $19.20 ($560.64) 109 12"wide radius curb head, Linear complete as specified Feet 165 191.70 26.70 $6.06 $161.80 110 4"concrete sidewalk, Square complete as specified Feet 5,000 4,380.40 -619.60 $3.70 ($2,292.52) 111 6"concrete sidewalk, Square complete as specified Feet 1,250 1,174.90 -75.10 $4.05 ($304.16) 112 6"HES concrete sidewalk and driveway,complete as Square specified Feet 700 721.30 21.30 $4.30 $91.59 113 Concrete median blunt nose,complete as Square specified Feet 70 193.90 123.90 $10.10 $1,251.39 114 Furnish and install metal detectable warning fields, Square complete as specified Feet 40 40.00 $35.35 115 Furnish and install base aggregate dense,'/,", complete as specified Tons 110 93.80 -16.20 $10.00 ($162.00) 116 Furnish and install base aggregate dense, 1W and 3",complete as specified Tons 4,300 4,175.10 -124.90 $9.00 ($1,124.10) 117 Furnish and install breaker run,complete as specified Tons 1,200 581.90 , -618.10 $9.00 ($5,562.90) 118 Furnish and install select crushed material,complete as specified Tons 1,650 959.60 -690.40 $9.00 ($6,213.60) 119 Sawing,complete as Linear specified Feet 1,250 1,164.40 , -85.60 $2.00 ($171.20) 120 Furnish and install pavement ties(epoxy coated),complete as specified Each 100 136.00 36.00 $7.10 $255.60 121 Adjust manholes and inlets,complete as specified Each 30 32.00 2.00 $500.00 $1,000.00 _ Page 1 of 6 CONTRACT:12-13 CHANGE ORDER#2(FINAL) ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 122 Furnish and install No.4 reinforcing bars(epoxy coated),complete as Linear specified Feet 400 1,200.00 800.00 $2.05 $1,640.00 123 Preparation of foundation for asphalt paving on Ceape Avenue,complete Lump as specified Sum 1 1.00 $6,000.00 124 Preparation of foundation for asphalt paving on Poplar Street,complete as Lump specified Sum 1 1.00 $3,000.00 125 Preparation of foundation for asphalt paving on public alley south of Otter Avenue(Broad Street to Bay Street),complete as Lump specified Sum 1 1.00 $3,000.00 126 Preparation of foundation for asphalt paving on public alley south of Otter Avenue(Bay Street to Mill Street),complete as Lump specified Sum 1 1.00 $3,000.00 127 Preparation of foundation for asphalt paving for Butler Avenue(Quiet Zone),complete as Lump specified Sum 1 1.00 $3,500.00 128 Preparation of foundation for asphalt paving on Snell Road(Quiet Zone), Lump complete as specified Sum 1 1.00 $2,500.00 129 Terrace work on Ceape Avenue,complete as Lump specified Sum 1 1.00 $4,200.00 130 Terrace work on Poplar Avenue,complete as Lump specified Sum 1 1.00 $3,600.00 131 Terrace work on public alley south of Otter Avenue (Broad Street to Bay Street),complete as Lump specified Sum 1 1.00 $4,500.00 132 Terrace work on public alley south of Otter Avenue (Bay Street to Mill Street), Lump complete as specified Sum 1 1.00 $2,700.00 133 Terrace work on Butler Avenue(Quiet Zone), Lump complete as specified Sum 1 1.00 $5,000.00 134 Terrace work on Snell Road(Quiet Zone), Lump complete as specified Sum 1 1.00 $4,500.00 135 Furnish and install Qwick Kurb,complete as Lump specified Sum 1 1.00 $10,600.00 136 Traffic control for Snell Road and Butler Avenue Quiet Zone Improvement Areas,complete as Lump specified Sum 1 1.00 $5,000.00 Page 2 of 6 CONTRACT: 12-13 CHANGE ORDER#2(FINAL) ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 137 Excavation special, complete as specified Tons 700 1,632.50 932.50 $12.00 11,190.00 SECTION I-(BID ITEMS 100-137)-SUB-TOTALS $28,920.89 ($39,494.25) ADDITIONAL WORK REQUIRED: C.O.#2-SECTION I ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 138 Furnish and install sidwalk tie bars,complete as specified Each 0.00 335.00 335.00 $3.30 $1,105.50 139 Furnish additional"Tuff Curb Delineators", complete as specified Each 0.00 12.00 12.00 $124.50 $1,494.00 140 Extend the"Tuff Curb" Lump beyond project limits Sum 0.00 1.00 1.00 $795.00 $795.00 141 Replace damaged'Tuff Curb"sections(9)and one Lump end cap Sum 0.00 1.00 1.00 $5,620.00 $5,620.00 ADDITIONAL WORK: C.O.#2-(ITEMS 138-140)-SUB-TOTAL $9,014.50 $0.00 NET DECREASE TO: SECTION I ($1,558.86) SECTION II-STORM SEWER ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 2036 Furnish and install 12" storm sewer,complete as Linear specified Feet 428 462.90 34.90 $50.00 $1,745.00 2038 Furnish and install 12" RCP Class Ill storm sewer, Linear complete as specified Feet 30 0.00 -30.00 $53.00 ($1,590.00) 2305 Furnish and install 18" steel end section, complete as specified Each 1 0.00 -1.00 $150.00 ($150.00) 2532 Furnish and install standard storm manhole (4'diameter),complete as Vertical specified Feet 11 10.26 -0.74 $250.00 ($185.00) 2612 Furnish and install Type 1 inlet,complete as specified Each 5 4.00 -1.00 $1,425.00 ($1,425.00) 2614 Furnish and install Type 3 inlet(with 18"sump), complete as specified Each 2 2.00 $1,450.00 2772 Tuck point storm structure, complete as specified Each 10 0.00 -10.00 $300.00 ($3,000.00) 2800 Connect to existing storm sewer,complete as specified Each 1 5.00 4.00 $350.00 $1,400.00 2806 Connect to existing manhole,complete as specified Each 5 2.00 -3.00 $350.00 ($1,050.00) Page 3 of 6 CONTRACT:12-13 CHANGE ORDER#2(FINAL) ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT 2808 Connect to existing inlet, PRICE PRICE complete as specified Each 1 1.00 $350.00 2820 Abandon 8"-12"storm sewer,complete as Linear specified Feet 115 97.00 -18.00 $4.00 2830 Abandon storm manholes ($72.00) and inlets,complete as specified Each 2 2.00 $300.00 2858 Furnish,install,maintain, and remove Type D modified inlet protection, complete as specified Each 65 31.00 -34.00 $85.00 2860 Sediment removal-Type ($2,890.00) D modified inlet protection, complete as specified Each 65 0.00 -65.00 $5.00 2864 Furnish,install,maintain, ($325.00) and remove silt fence, Linear complete as specified Feet 350 150.00 -200.00 $3.00 2866 Furnish, install,maintain, ($600.00) and remove stone bag, complete as specified Each 30 0.00 -30.00 $15.00 2872 Furnish,install,maintain, ($450.00) and remove ditch check, complete as specified Each 8 8.00 $85.00 SECTION II-(BID ITEMS 2036-2872)-SUB-TOTALS $3,145.00 ($11,737.00) ADDITIONAL WORK REQUIRED: C.O.#2 - SECTION II ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES I INCREASE I DECREASE I PRICE COP TRACT I CONTRACT PRICE 1 20000 (Rebuild storm manholes on Ceape Avenue, complete as specified Each 0.00 2.00 1 2.00 ( ( $600.00 $1,200.00 ADDITIONAL WORK:C.O.#2 -(ITEM 20000)-SUB-TOTAL $1,200.00 $0.00 NET DECREASE TO: SECTION II ($7,392.00) SECTION III-SANITARY SEWER ITEM DESCRIPTION I UNIT BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER I I QUANTITY I QUANTITIES I INCREASE I DECREASE I PRICE R CONTRACT CONTRACT 111 I PRICE 3114 - Furnish and install external manhole chimney seal, complete as specified Each 11 3.00 -8.00 $450.00 3116 Furnish and install external ($3,600.00) manhole chimney seal extension,complete as specified Each 3 0.00 -3.00 $400.00 3118 Furnish and install internal ($1,200.00) manhole chimney seal, complete as specified Each 3 9.00 6.00 $300.00 $1,800.00 3120 Furnish and install internal manhole chimney seal extension,complete as specified Each 3 0.00 -3.00 $250.00 ($750.00) SECTION III-(BID ITEMS 3114-3120)-SUB-TOTALS $1,800.00 ($5,550.00) Page 4 of 6 CONTRACT:12-13 CHANGE ORDER#2(FINAL) ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT PRICE PRICE ADDITIONAL WORK REQUIRED: C.O.#2-SECTION III ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT PRICE PRICE 30004 Additional crew time to determine cause of sanitary backup. Crew did investigation work and discovered draintile connected to sanitary sewer,complete as specified Hours 0.00 3.00 3.00 $1,055.00 $3,165.00 ADDITIONAL WORK: C.O.#2-(ITEM 30004)-SUB-TOTAL $3,165.00 $0.00 NET DECREASE TO: SECTION III ($585.00) SECTION IV-WATER MAIN ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT PRICE PRICE 4002 Furnish and install 6" ductile iron water main relay with poly wrap, Linear complete as specified Feet 160 145.00 -15.00 $69.00 ($1,035.00) 4004 Furnish and install 8" ductile iron water main relay with poly wrap, Linear complete as specified Feet 1,700 1,649.00 -51.00 $68.00 ($3,468.00) 4036 Furnish and install 1"water service relay,complete as Linear specified Feet 980 1,081.00 101.00 $51.00 $5,151.00 4037 Furnish and install 11/4" water service relay, Linear complete as specified Feet 25 24.00 -1.00 $54.00 ($54.00) 4040 Furnish and install 2"water service relay,complete as Linear specified Feet 25 0.00 -25.00 $60.00 ($1,500.00) 4048 Furnish and install 1" corporation and stop box, complete as specified Each 39 37.00 -2.00 $250.00 ($500.00) 4049.5 Furnish and install 1 V," corporation and stop box, complete as specified Each 1 1.00 $500.00 4052 Furnish and install 2" corporation and stop box, complete as specified Each 1 0.00 -1.00 $700.00 ($700.00) 4058 Furnish and install connections to existing 6" water main,complete as specified Each 2 3.00 1.00 $1,000.00 $1,000.00 4060 Furnish and install connections to existing 8" water main,complete as specified Each 7 5.00 -2.00 $1,300.00 ($2,600.00) 4110 Furnish and install 8"x 6" tee,complete as specified Each 5 5.00 $350.00 Page 5 of 6 CONTRACT: 12-13 CHANGE ORDER#2(FINAL) ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT PRICE PRICE 4111 Furnish and install 8"x 8" tee,complete as specified Each 2 2.00 $450.00 4189 Furnish and install 8"x 8" cross,complete as specified Each 1 1.00 $550.00 4236 Furnish and install 6"45° bend,complete as specified Each 4 10.00 6.00 $200.00 $1,200.00 4237 Furnish and install 8"45° bend,complete as specified Each 8 14.00 6.00 $250.00 $1,500.00 4264 Furnish and install 8"x 6" reducer,complete as specified Each 1 2.00 1.00 $190.00 $190.00 4354 Cut and cap existing 8" water main,complete as specified Each 2 0.00 -2.00 $700.00 ($1,400.00) 4401 Furnish and install 6"gate valve,complete as specified Each 5 5.00 $1,100.00 4402 Furnish and install 8"gate valve,complete as specified Each 12 12.00 $1,500.00 4500 Furnish and install hydrant, complete as specified Each 4 3.00 -1.00 $2,900.00 ($2,900.00) 4504 Furnish and install gradelok for hydrant branches,complete as specified Each 4 0.00 -4.00 $0.01 ($0.04) 4700 Jack and bore 18"steel casing pipe,complete as Linear specified Feet 40 50.00 10.00 $350.00 $3,500.00 4900 Abandon water main on Ceape Avenue,complete Lump as specified Sum 1 1.00 $1,000.00 SECTION IV-(BID ITEMS 4002-4900)-SUB-TOTALS $12,541.00 ($14,157.04) NET DECREASE TO: SECTION IV ($1,616.04) NET INCREASE TO SECTIONS I,II,III,IV $59,786.39 NET DECREASE TO SECTIONS I,II,III,IV ($70,938.29) NET DECREASE TO CONTRACT: ($11,151.90) Page 6 of 6