HomeMy WebLinkAbout0157644-Building (new sign) L
� CITY OF OSHKOSH No �s7sa4
OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD
ON THE WATER
Job Address 1816 VINLAND ST Owner CENTURY OAKS HOMES LLC Create Date 09/10/2013
Designer Allen Stauber Contractor GANTHER CONSTRUCTION
Inspector John Zarate
Category 254-Signs Plan
Type � Building � Sign � Canopy � Fence � Raze I
Zoning C-1 Class of Const: Size
Unfinished/Basement Sq.Ft. Rooms Height Ft. ❑ Projection
Finished/Living Sq.Ft. Bedrooms Stories Canopies .
Garage Sq.Ft. Baths Signs
Foundation � Poured Concrete � Floating Slab � Pier � Other
� Concrete Block � Post � Treated Wood -
Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain Height Permit Not Required .
Park Dedication Not Required #Dweiling Units 0 #Structures 0
Use/Nature Commercial/Sign*Install d/f ground sign for"Century Oaks".
of Work
III
HVAC Contractor Plumbing Contractor
Electric Contractor
Fees: Valuation $1,000.00 Plan Approval $0.00 Permit Fee Paid $62.00 Park Dedication $0.00
Issued By: Date 09/10/2013 Final/O.P. 00/00/0000
� Permit Voided�� Parcel Id# 1211433009
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party,if you perform the work
described in this permit applicatinn withi sement,the City strongly urges the permit applicant to contact the easement
holder(s)and to se ure n sa vals before starting such activity.
I have read an � information. /'/'�^/�
Signature Date r �(��
� Agent/Owner
Address 4825 COUNTY ROAD A OSHKOSH WI 54901 - 9618 Telephone Number 426-4774
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of
Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone
Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.