Loading...
HomeMy WebLinkAbout0157644-Building (new sign) L � CITY OF OSHKOSH No �s7sa4 OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD ON THE WATER Job Address 1816 VINLAND ST Owner CENTURY OAKS HOMES LLC Create Date 09/10/2013 Designer Allen Stauber Contractor GANTHER CONSTRUCTION Inspector John Zarate Category 254-Signs Plan Type � Building � Sign � Canopy � Fence � Raze I Zoning C-1 Class of Const: Size Unfinished/Basement Sq.Ft. Rooms Height Ft. ❑ Projection Finished/Living Sq.Ft. Bedrooms Stories Canopies . Garage Sq.Ft. Baths Signs Foundation � Poured Concrete � Floating Slab � Pier � Other � Concrete Block � Post � Treated Wood - Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain Height Permit Not Required . Park Dedication Not Required #Dweiling Units 0 #Structures 0 Use/Nature Commercial/Sign*Install d/f ground sign for"Century Oaks". of Work III HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $1,000.00 Plan Approval $0.00 Permit Fee Paid $62.00 Park Dedication $0.00 Issued By: Date 09/10/2013 Final/O.P. 00/00/0000 � Permit Voided�� Parcel Id# 1211433009 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party,if you perform the work described in this permit applicatinn withi sement,the City strongly urges the permit applicant to contact the easement holder(s)and to se ure n sa vals before starting such activity. I have read an � information. /'/'�^/� Signature Date r �(�� � Agent/Owner Address 4825 COUNTY ROAD A OSHKOSH WI 54901 - 9618 Telephone Number 426-4774 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.