Loading...
HomeMy WebLinkAboutbldg 157632 (reroof) Y � � CITY OF OSHKOSH No 157632 OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD ON THE WATER Job Address 1690 DEERFIELD DR Owner ARAL G/MARY J EATON Create Date 09/10/2013 Designer Contractor D 8�J QUALITY CONSTRUCTION Inspector Tom Spierowski Category 041 -Residential Roofing Plan Type � Building � Sign � Canopy _ � Fence � Raze I Zoning R_1_ ____ Class of Const: Size Unfinished/Basement Sq.Ft. Rooms _ _ Height ___ Ft. ❑ Projection Finished/Living Sq. Ft. Bedrooms Stories Canopies Garage Sq. Ft. Baths Signs Foundation � Poured Concrete � Floating Slab � Pier � Other � Concrete Block � Post � Treated Wood -- Occupancy Permit Occupancy Fee $0.00 Flood Plain Height Permit Park Dedication #Dwelling Units 0 #Structures 0 ---- --- ---- ---- Use/Nature SFR/Re-roof Tear off and replace shingles. No structural work. of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $9,715.00 Plan Approval $0.00 Permit Fee Paid $100.00 Park Dedication $0.00 Issued By: Date 09/10/2013 Final/O.P. 00/00/0000 ❑ Permit Voided J Parcel Id# 1320310000 In the perFormance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement,the Cit trongly urges the permit applicant to contact the easement holder(s)and to secure any necessary a a s efor st ng such activity. I have read and underst en ' d inf ion. Signature `� Date `� Agent/Owner Address 2415 HICKORY LN OSHKOSH WI 54901 - 2521 Telephone Number 232-0538 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.