HomeMy WebLinkAbout0104361-BuildingOSHKOSH
ON THE WATER
Job Address 1541 HAZEL ST
Designer
Category
Type
Zoning
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner TODD AJGINA L SCHMiTZ
Contractor BB CONSTRUCTION
No 104361
Create Date 09/23/2003
140 - Intedor Remodeling Plan
· Building O Sign O Canopy O Fence O Raze
Class of Const: Size
Unfinished/Basement 0 Sq. Ft.
Finished/Living 0 Sq. Ft.
Garage 0 Sq. Ft.
Foundation · Poured Concrete C) Floating Slab
O Concrete Block O Post
Occupancy Permit
Park Dedication
Rooms 0 Height 0 Ft. [] Projection
Bedrooms 0 Stories Canopies
Baths 0 Signs
C) Pier (~ Other
O Treated Wood
Flood Plain Height Permit
# Dwelling Units 0 # Structures 0
Use/Nature
of Work
[SFPJ Constructing a full bathroom in the basement and installing a 5' x 5' egress window with escape well. The bathroom is the only
Irea being finished under this permit.
HVAC Contractor AMERICAN HEATING & A C CO
Electric Contractor SECKAR ELECTRIC
Plumbing Contractor UNKNOWN
Fees: Valuation $9,500.00 Plan Approval
Issued By: ~
[] Permit Voided I
$0.00 Permit Fee Paid
$65.00 Park Dedication $0.00
Date 09/23/2003 Final/O.P. 00/00/0000
In the performance of this work I agree to perform all work pursuant to m[es goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
h ders)a to cu~.y ne~s ry/~opr v~O ~ rungd:ls¢ ri(bed i~dth'SsPeel m t ~ P plicafi°naWi[h in an~ a" e' ment'"~t~'st:citySUChaC vi¥ stl °nglYtiurges the permit applicant to contact the easement
Signature/~ ~*-'~'-~ "--- ~ ¢'2-~'~/¢'~ Date
Agent/Owner
Address t004 W BANNERMAN AV RED GRANITE WI 54970 - 0000 Telephone Number 566-0282
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.