HomeMy WebLinkAbout0104359-Building (windows)OSHKOSH
ON THE WATER
Job Address
Designer
Category
Type
807 W 5TH AVE
141 - Exterior Remodeling
· Building (~ Sign
CITY OF OSHKOSH No 104359
BUILDING PERMIT - APPLICATION AND RECORD
Owner PHYLLIS J TILLOU Create Date 09/23/2003
Contractor OWNER
Plan
Zoning
Unfinished/Basement 0 Sq. Ft.
Finished/Living 0 Sq. FL
Garage 0 Sq. Ft.
Foundation · Poured Concrete (~) Floating Slab
~) Concrete Block (~ Post
Occupancy Permit
Park Dedication
Canopy (~) Fence (~ Raze
Class of Const: Size
Rooms 0 Height 0 Ft. [] Projection
Bedrooms 0 Stories Canopies
Baths 0 Signs
O Pier (~ Other
(~ Treated Wood
Flood Plain Height Permit
# Dwelling Units 0 # Structures 0
Use/Nature
of Work
~FPJ Replacing 9 windows some of the windows will be smalller however the owner states that the glazed area will still be a min of 8% oi
:he floor area. The whole house will be resided and the south end of the roof will be reshingled (1/4 of the roof ). A seperate permit wi[~
~e rquired for the electrical meter disconnect and replacement as well as any light fixtures.
HVAC Contractor
Electric Contractor UNKNOWN????
Plumbing Contractor
Fees: Valuation
Issued By:
$8,000.00 Plan Approval
$0.00 Permit Fee Paid
[] Permit Voided J
$55.00 Park Dedication $0~00
Date 09/23/2003 Final/O.P. 00/00/0000
In the performance of this work I agree to perform all work pursuant ta rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City s[rongly urges the permit applicant to contact the easement
holder(s) and to secure.apy necessaW approvals before starting such activity.
Signature ~.. ~~- ~~,~--<~ Date
Agent/Owner
Address Oshkosh Wi 54901 - 0000 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.