Loading...
HomeMy WebLinkAbout0104356-Building (siding)OSHKOSH ON THE WATER ,lob Address 59 W WAUKAU AVE Designer Category Type · Building (~) Sign Zoning 141 - Exterior Remodeling CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner JEFFREYA/TINA DUPEY Contractor OWNER Canopy (~) Fence Class of Const: Create Date Plan (~) Raze Size No 104356 09~23/2003 Unfinished/Basement 0 Sq. Ft. Finished/Living 0 Sq. Ft. Garage 0 Sq. Ft. Foundation · Poured Concrete (~ Floating Slab (~ Concrete Block (~ Post Occupancy Permit Not Required Park Dedication Rooms 0 Height 0 Ft. Bedrooms 0 Stories Baths 0 O Pier (~ Other (~ Treated Wood Flood Plain Height Permit # Dwelling Units 0 # Structures 0 [] Projection Canopies Signs Use/Nature of Work SFR/Installing siding for the detached garage. This permit also includes installing 2 new windows and a new door. HVAC Contractor Electric Contractor Fees: Valuation Issued By: ,~~'- $1,000.00 Plan Approval Plumbing Contractor $0.00 Permit Fee Paid $20.00 Park Dedication $0.00 Date 09/23/2003 Final/O.P. 00/00/0000 [] Permit Voided J In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any ~n_~gessary.~p~ro~s before starting such activity. Signature .. ~..~." ~'~%'~ ~---"'~.. _ ~ Date,,.~ % ~ Age~er (~ Address 59 W WAUKAU AVE OSHK~S~ WI 54902 - 7208 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.