Loading...
HomeMy WebLinkAboutPW CNT 84-01/CHG OR #8 Change Oroer Ho. 8 May 15, 1986 Contract No. -@ , Low Lift/High Service Pumping Station Owner: City of Osnxosh ' C;ontractor: Fluor Bros. Construction Co. ngineer: Howaro Needles Tammen & Bergendoff C cent ract: No. 84-01, Low Lift/High Service Pumping St at ion, is hereby amended and oh nged as follows: Item No. 1 Move Bop kflow Preverter, Add Increase Cost $2, 573. 00 Drain Piping to Ventilation Units, and Add a Gate Valve at the Air Release nH. Item Variable Speed Drives To I nor ease Cost $1, 351. 00 Operate Over Entire 4-20ma Range Item No. 3 Ado Additional Controls To Increase Cost $4, 697. 00 The New I&C Panel For Existing High Se Pumps Wos. 5 and 6. It em • c. 4 AdUi• ionaI Sidewalk Panels Increase Cost $140. 00 Total $8, 761. 00 Origimal A• ou•nt of Contract $1, 393, 700. 00 Total Amount of P'revious Change Orders to Date $50, 080. 00 Pre ouEi Ao`]usted Contract Amount $1, 443, 780. 00 Change Order No. 8 Amount $8, 761. 00 Total Amount of Current Contract Including C. 0. No. 8 $1, 452, 541. 00 _______ RC ^'^' 4ydi/i _____ uy: r���_���������_ Director of Pop ic Works ' City Manager. Ast7,,,,n4) ' ������__ _--- __ City Clerk __ / //��___ Aoproved and f ccept ed Fluor Bros. Construction Co. I certify that prov1sion has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. ` ~ H Comptroller --� ------�� --� ---T-�----- City At torney -- -