HomeMy WebLinkAboutBadger Laboratories & Engineering Co, Inc CONSTRUCTION CONTRACT
THIS AGREEMENT, made on the 2nd day of M&y, 1986, by and between the
CITY OF OSHKOSH, party of the first part, hereinafter referred to as the
CITY, and BADGER LABORATORIES & ENGINEERING CO. INC. of 1110 So. Oneida
St. , Appleton, WI 54915 , party of the second part, hereinafter referred
to as the CONTRACTOR,
WITNESSETH: That the City and the Contractor, for the
consideration hereinafter named, agree as follows:
ARTICLE I . SCOPE OF WORK
The Contractor hereby agrees to furnish all of the materials and
all of the equipment and labor necessary, and to perform all of the
work shown on the plans and described in the specifications for the
project entitled or described as follows:
Public Works Contract No. 86-11
for industrial wastewater discharge sampling and analysis for Public
Works Department , pursuant to Resolution #45 adopted by the Common
Council of the City of Oshkosh on 1st day of May, 1986 ,
all in accordance and in strict compliance with the Contractor's
proposal and the other contract documens referred to in ARTICLE V of
this contract.
ARTICLE II . TIME OF COMPLETION
The work to be performed under this contract shall be commenced
and the work completed within the time limits specified in the General
Conditions and/or Contractor's proposal.
,ARTICLE III. PAYMENT.
(a) The Contract Sum.
The City shall pay to the Contractor for the performance of the
contract the sum of $21,431.00 , adjusted by any changes as
provided in the General Conditions, or any changes hereafter
mutually agreed upon in writing by the parties hereto, provided,
however, in the event the proposal and contract documents are on
1
a "Unit Price" basis, the above mentioned figure is an estimated
for the performance of the contract the amounts determined for
the total number of each of the units of work as set forth in the
Contractor's proposal; the number of units therein contained is
approximate only, and the final payment shall be made for the
actual number of units that are incorporated in or made necessary
by the work covered by the contract.
(b) Progress Payments .
In the event the time necessary to complete this Contract is such
that progress payments are required, they shall be made according
to the provisions set forth in the General Conditions.
ARTICLE IV. CONTRACTOR TO HOLD CITY HARMLESS
The Contractor covenants and agrees to protect and hold the City
of Oshkosh harmless against all actions, claims and demands of any
kind or character whatsoever which may in any way be caused by the
negligent digging up of streets, alleys or public grounds or which may
result from the faulty, carelessness or neglect of said Contractor,
his agents, employees or workmen in the performance of said work or
caused by the violation of any City ordinance, and shall refund to the
City all sums which it may be obliged or adjudged to pay on any such
claims or demands within a reasonable time after demand thereof.
ARTICLE V. COMPONENT PARTS OF THE CONTRACT
This contract consists of the following component parts, all of
which are as fully a part of this contract as if herein set out
verbatim, or if not attached, as if hereto attached:
1. General Conditions
2. Advertisement for Bids
3 . Instructions to Bidders
4. Specifications, including any addenda
5 . Plans
6. Contractor 's Proposal
7 . This Instrument
In the event that any provision in any of the above component
parts of this contract conflicts with any provision in any other of
the component parts, the provision in the component part first enumer-
ated above shall govern over any other component part which follows it
numerically except as may be otherwise specifically stated.
IT IS HEREBY DECLARED, UNDERSTOOD AND AGREED that the word "Con-
tractor" wherever used in this contract means the party of the second
part and its/his/their legal representatives, successors and assigns.
2
IN WITNESS WHEREOF, the City of Oshkosh, Wisconsin, has caused
this contract to be sealed with its corporate seal and to be sub-
scribed to by its City Manager and City Clerk and countersigned by the
Comptroller of said City, and the party of the second part hereunto
set its, his or their hand and seal the day and year first above
written.
In the Presence of: CONTRACTOR
r BADGER LABORATORIES & ENGINEERING CO. INC.
C%� By: 1727'11S-o-pht-z-
(Seal of Contractor Arthur B. Kaplan, President
if a Corporation ) (Specify Title
By:
Stephen C. Taylor, hief Chemist
(Specify Title)
I
CITY OF OSHKOSH
f �+
By: 1 :(�
( i\tnesrs Will ' am D. Frueh, City Manager
%/(, , / � i,.�1�. And: 4
Donna C.Serwas, City Clerk
/�' Witness) y
I certify that provisions have been
made to pay the liability that will
accrue to the City of Oshkosh under
the within contract.
Edward A. Nokes, City Comptroller
Appro d as f rm:
Atj
Warren P. Kra , Ass , City Attorney
3
SET TAB STOPS AT ARROWS
Certificate of Insurance
j ccO(O THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.
-i',> THIS CERTIFICATE DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES LISTED BELOW.
NAME AND ADDRESS OF AGENCY
J COMPANIES AFFORDING COVERAGES
Hubley Insurance Services, Inc.
P.O. Box 1751 COMPANY A Westchester Fire Insurance
Appleton, WI 54913-1751
COMPANY B
LI T'FR Integrity M surance
• -
NAME AND ADDRESS OF INSURED C
Il COMPANY (C
LETTER a
Badger Laboratories & Engineering Company - - i
1110 South Oneida Street COMPANY' D N
Appleton, Wisconsin 54911 ' ';S
(.
COMPANY E
LETTER O.eih•
This is to certify that policies of insurance listed below have been issued to the insured named above and are in force at this time. No°'t4'-r`' '' , equirem: t,term or condition
1 rD of any contract or other document with respect to which this certificate may be issued or may pertain,the insurance afforded by the •. le i.e here is subject to all the
terms,exclusions and conditions of such policies.
COMPANY ouc`r Limits of Liabilit �7 7r nialli)
" LETTER
TYPE OF INSURANCE �'OLICYNIMBER IXPIPA-'ION DATE EACH AGGREGA'F
u OCCURRENCE
GENERAL LIABILITY i BODILY INJURY $ 500 $ 500 •
F'e ' T;OMP4EEHE NSiVE FORM I '
" PREMISES—OPERATIONS PROPERTY DAMAGE $ 500 $ 500
❑ EXPLOSION AND COLLAPSE
iii HAZARD
'�I ❑ UNDERGROUND HAZARD
0 PRODUCTS/COMPLETED
A OPERATIONS HAZARD 500 362780-5 8/17/86 BODILY INJURY AND
AB CONTRACTUAL INSURANCE PROPERTY DAMAGE $ $
BROAD FORM PROPERTY COMBINED gli
47.74." DAMAGE
INDEPENDENT CONTRACTORS
1 • U PERSONAL INJURY PERSONAL INJURY $ 500
I, AUTOMOBILE LIABILITY BODILY INJURY
(EACH PERSON) $ 300,
COMPREHENSIVE FORM BODILY INJURY $ 500,
❑ (EACH ACCIDENT)
OWNED
B 23 52 04 413 8/17/86 PROPERTY DAMAGE $ 311,
❑ HIRED
BODILY INJURY AND
111 NON-OWNED PROPERTY DAMAGE $
I COMBINED EXCESS LIABILITY
BODILY INJURY AND
❑ UMBRELLA FORM PROPERTY DAMAGE $ $
❑ OTHER THAN UMBRELLA COMBINED
FORM
y WORKERS'COMPENSATION 1— STATUTORY
and
A EMPLOYERS'LIABILITY 408 39 20 64 8/17/86 $ 100,
OTHER , I
,. DESCRIPTION OF OPERATIONS/LOCATIONSNEHICLES
rkf . .
5-
;aY
'a "? Cancellation: Should any of the above described policies be cancelled before the expiration date thereof, the issuing corn-
,... ,
pany will endeavor to mail nil days written notice to the below named certificate holder, but failure to
mail such notice shall impose no obligation or liability of any kind upon the company.
)
S,- NAME AND ADDRESS OF CERTIFICA I F HOL DEP:
DarE ISSUED' June 16, 1986
City of Oshkosh
C,:,' P.O. Box 1130
I �';, )''. Oshkosh, Wisconsin 54902 ..Lo. � � Z
AUTHORIZED REPRESENTATIVE
Attention: Donna Serwas
:,';ACORD 25(1-79)
----__-_-_-___'
w `
' '^ ���/�
`" "`~
ADDENDUM NO. 1 ~ `r^/^7 /
� /
CITY OF OSHKOSH CONTRA / -'
TO THE CONTRACTOR:
YOU ARE HEREBY DIRECTED TO MAKE THE FOLLOWING ADDITIONS AND
CHANGES TO THE SPECIFICATIONS FOR CONTRACT 86-11 :
A. SPECIFICATIONS
Section GC-11 (b) Public Liability and Property Damage
Insurance is hereby changed to read as follows:
Puplic Liability Insurance in an amount o+ not less than
r5C0 , 0�0 f�r injuries , i.�c� .�din� accioe�tal �e=tn co �ny
one person, anb, subject to th same limit -for each person ,
in an amount of not less than $500,0()0 on account of one
accident and Property Damage Insurance in an amount of not
less than $500,000.
The above changes are hereby incorporated into the Specifi-
cations for city of Oshkosh contract 86-11 . The bidder
shall indicate on page 1 of the proposal that he
acknowledges receipt of this addendum.
Gerald F. Konrad
Director of Public Works
Date: April 25, 1986
Page 4. p
General Conditions
the Owner's approval of materials and equipment before
they are incorporated in the project.
"NOTICE", where in any of the contract documents there is
any provision in respect to the giving of any notice, such
notice shall be deemed to have been given: as to the Owner,
when written notice shall be delivered to the Engineer of
the Owner, or shall have been placed in the United States
mail addressed to the Clerk or Secretary of the Owner at
the place where the bids or proposals for the contract are
opened; as to the Contractor: When a written notice shall be
delivered to the chief representative of the Contractor at
the site of the project or by mailing such written notice in
the United States mail addressed to the Contractor at the
place stated in the papers prepared by him to accompany his -
proposal as the address of his permanent place of business;
as to the Surety of the performance bond: When a written notice
is placed in the United States mail addressed to the Surety
at the home office of such surety or to its agent or agents
who execute such performance bond in behalf of such surety.
"COMPLETED WORK" is understood to mean work which has been
accepted by the Engineer and recommended to the Owner as having
been performed in accordance with these specifications. Completed
work may be accepted but not paid for in full until the entire ; <
contract has been completed and accepted.
GC-10 CONTRACT SURETY
The Contractor shall furnish a surety bond (form attached) in an
amount of at least equal to 100 per cent of the contract price as
surety for the faithful performance of this contract and for the
payment of all persons performing labor and furnishing materials
in connection with this contract.
GC-11 CONTRACTOR'S INSURANCE . ;
The Contractor shall not commence work under this contract until
he has obtained all insurance required under this paragraph and
such insurance has been approved by the Owner, nor shall the
Contractor allow any subcontractor to commence work on his
subcontract until all similar insurance required of the subcontractor
•
has been so obtained and approved.
•
(a) Compensation Insurance: The Contractor shall take out and
maintain during the life of this contract Workmen's Compensation
Insurance for all his employees employed at the site of the
project and, in case any work is sublet, the Contractor shall
require the subcontractor similarly to provide Workmen's Compensa-
tion Insurance for all the latter's employees unless such employees
are covered by the protection afforded by the Contractor. In case
the class of employees engaged in hazardous work under this Contract
at the site of the project is not protected- under the Workmen's
Compensation Statute, the Contractor shall provide and shall cause
each subcontractor to provide adequate insurance coverage for the
protection of his employees not otherwise protected.
l;
;'x
Page 5.
General Conditions
(b) Public Liability and Property Damage Insurance.
The Contractor shall take out and maintain during the life
of this contract such Public Liability and Property Damage
Insurance as shall protect him and any subcontractor per-
forming work covered by this contract from claims and damages
for personal injury, including accidental death, as well as
from claims for property damages, which may arise from opera-
tions under this contract, whether such operations be by
himself or by anyone directly or indirectly employed by either
of them and the amounts of such insurance shall be as follows:
Public Liability Insurance in an amount of not less than
`�'" �� _ V1,000,000 for injuries, including accidental death,
o-any one person, and, subject to the same limit for
each person, in an amount of not less than $3,000,.000..on _
account of one accident and Property Damage Insurance
in an amount of not less than $1,000,000.
Ally subcontractor not covered by the Contractor's public liability
and property damage insurance shall carry Owner's Protective
5 and Subcontractor's Liability Insurance in the same amounts. The
Contractor shall be responsible for a subcontractor's carrying
the insurance herein required.
(c) Insurance Covering Special Hazards: The following special
hazards shall be covered by a rider or riders to the Public
Liability and/or Property Damage Insurance Policy or Policies
herein elsewhere required to be furnished by this Contractor or
by separate policies of insurance, in amounts as follows:
Public Liability Property Damage
Insurance Insurance
Operations of _ - _ _-_ . __ __
Trucks and Auto $300,000/$500,000
$300,000
The insurance coverage shall in all instances save, defend,
indemnify and hold harmless the City against any and all manners
of claims, demands, liabilities, damages or any other costs
which may accrue in the protection of the work and that he will
save, defend, indemnify, and hold harmless the City from all
damages caused by or as a result of his operations.
No insurance shall be cancelled without notifying the Owner in
writing thirty (30) days before such cancellation.
See Contractor's responsibility for damaged work.
GC-12 PROOF OF CARRIAGE OF INSURANCE
The Contractor shall furnish the Owner with satisfactory proof
of carriage of the insurance required. Satisfactory proof shall
consist of a duplicate or photostat copy of the certification of
insurance.