Loading...
HomeMy WebLinkAboutPW CNT #13-06/CHG OR #1 DEPARTMENT OF PUBLIC WORKS 215 Church Avenue P.O.Box 1130 CAN-- Oshkosh,Wisconsin 54903-1130 Ph.(920)236-5065 OlHKO/H Fax(920)236-5068 ON THE WATER September 11, 2013 Mr. Al Dix Al Dix Concrete 500 Draper Street Kaukauna, WI 54130 RE: Contract 13-06—Change Order No. 1 Dear Mr. Dix: Enclosed is an executed copy of Change Order No. 1 between the City of Oshkosh and Al Dix Concrete regarding the abovementioned project. If you have any questions, please call our office at (920)236-5065. Sincerely, piti„ David C. Pat k, P.E. Director of Public Works DCP/t1t Enclosure: Change Order No. 1 cc: Pam Ubrig, City Clerk (w/original) Lynn Lorenson, City Attorney(w/copy) Peggy Steeno, Finance Director(w/copy) File (w/original) I:1Engineering\13-06 Cone Sidewalk(New&Rehab)\Project_Information\Contract Info\Change Orders113-06 Executed Page 1 of 1 CO 41 Ltr 9-11-13.docx TO: Al Dix Concrete CHANGE ORDER#1 500 Draper Street DATED: August 21, 2013 Kaukauna, WI 54130 Your present contract with the City of Oshkosh, Contract No.13-06, awarded March 26, 2013, is hereby amended and changed as follows: NET INCREASE TO: SECTION I - PAVING 146,600.27 NET INCREASE TO: SECTION II - STORM SEWER 5,984.49 NET INCREASE TO CONTRACT $152,584.76 Section I Section II Section III Section IV (Paving) (Storm) (Sanitary) (Water) Totals Bid Total $322,828.50 $650.00 $0.00 $0.00 $323,478.50 C.O. #1 $146,600.27 $5,984.49 $152,584.76 Contract Total $469,428.77 $6,634.49 $0.00 $0.00 $476,063.26 CITY OF OSHKOSH BY: Recommended: City Mana.- Director of Public Works City Clerk Approved and accepted: YOIA4 04, Contractor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. (;`6mptroller Approved as iform: Mi r\,41J W City Attorn-• CONTRACT: 13-06 CHANGE ORDER#1 SECTION I-PAVING ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 1308 7"concrete pavement removal and replacement, including sawing, pavement ties,integral curb and grading, terracing,and traffic control,complete as Square specified Yards 270 293.58 23.58 $43.00 $1,013.94 1318 8"concrete pavement removal and replacement, including sawing, pavement ties,integral curb and grading, terracing,and traffic control,complete as Square specified Yards 40 850.00 810.00 $45.00 $36,450.00 1360 Adjust manholes and inlets,complete as specified Each 2 9.00 7.00 $200.00 $1,400.00 1370 Terrace work,complete as Square specified Yards 200 4,089.66 3,889.66 $4.00 $15,558.64 1502 4"concrete sidewalk with 3"CABC and grading, water department locations,complete as Square specified Feet 500 6,500.00 6,000.00 $6.00 $36,000.00 1510 6"concrete sidewalk, driveway,or ramp with 3" CABC and grading, Square complete as specified Feet 700 1,100.00 400.00 $3.95 $1,580.00 1512 6"concrete sidewalk, driveway,or ramp with 3" CABC and grading,water department locations, Square complete as specified Feet 50 2,500.00 2,450.00 $6.30 $15,435.00 1550 No.4 reinforcing rods, deformed,epoxy-coated, Linear complete as specified Feet 500 1,609.00 1,109.00 $0.75 $831.75 1800 Base aggregate dense,'/.", complete as specified Tons 150 314.27 164.27 $12.00 $1,971.24 1906 4"asphaltic pavement with 10"CABC and grading, Square complete as specified Yards 75 1,200.00 1,125.00 $30.00 $33,750.00 _ SECTION I-(BID ITEMS 1110-1906)-SUB-TOTALS $143,990.57 $0.00 Page 1 of 2 • CONTRACT: 13-06 CHANGE ORDER#1 ADDITIONAL WORK REQUIRED: C.O.#1 -SECTION I INCREASE IN DECREASE IN ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT CONTRACT CONTRACT NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 10000 Additional cost to hire Sub- Contractor to pave asphalt patches with a paver,due to large increase in quantity,complete as Square specified Yards 0.00 521.94 521.94 $5.00 $2,609.70 ADDITIONAL WORK: C.O.#1 -(ITEM 10000)-SUB-TOTAL $2,609.70 $0.00 NET INCREASE TO: SECTION I $146,600.27 SECTION II-STORM SEWER BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN ITEM DESCRIPTION UNIT CONTRACT NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 2932 Furnish and install Class I, Urban,Type A erosion control mat,complete as Square specified Yards 100 4,089.66 3,989.66 $1.50 $5,984.49 SECTION II-(BID ITEMS 2856&2932)-SUB-TOTALS $5,984.49 $0.00 NET INCREASE TO: SECTION II $5,984.49 NET INCREASE TO SECTIONS I&II $152,584.76 NET DECREASE TO SECTIONS I&II $0.00 NET INCREASE TO CONTRACT: $152,584.76 Page 2 of 2