HomeMy WebLinkAboutPW CNT #13-06/CHG OR #1 DEPARTMENT OF PUBLIC WORKS
215 Church Avenue
P.O.Box 1130
CAN--
Oshkosh,Wisconsin 54903-1130
Ph.(920)236-5065 OlHKO/H
Fax(920)236-5068
ON THE WATER
September 11, 2013
Mr. Al Dix
Al Dix Concrete
500 Draper Street
Kaukauna, WI 54130
RE: Contract 13-06—Change Order No. 1
Dear Mr. Dix:
Enclosed is an executed copy of Change Order No. 1 between the City of Oshkosh and Al Dix Concrete
regarding the abovementioned project.
If you have any questions, please call our office at (920)236-5065.
Sincerely,
piti„
David C. Pat k, P.E.
Director of Public Works
DCP/t1t
Enclosure: Change Order No. 1
cc: Pam Ubrig, City Clerk (w/original)
Lynn Lorenson, City Attorney(w/copy)
Peggy Steeno, Finance Director(w/copy)
File (w/original)
I:1Engineering\13-06 Cone Sidewalk(New&Rehab)\Project_Information\Contract Info\Change Orders113-06 Executed Page 1 of 1
CO 41 Ltr 9-11-13.docx
TO: Al Dix Concrete CHANGE ORDER#1
500 Draper Street DATED: August 21, 2013
Kaukauna, WI 54130
Your present contract with the City of Oshkosh, Contract No.13-06, awarded March 26, 2013, is hereby
amended and changed as follows:
NET INCREASE TO: SECTION I - PAVING 146,600.27
NET INCREASE TO: SECTION II - STORM SEWER 5,984.49
NET INCREASE TO CONTRACT $152,584.76
Section I Section II Section III Section IV
(Paving) (Storm) (Sanitary) (Water) Totals
Bid Total $322,828.50 $650.00 $0.00 $0.00 $323,478.50
C.O. #1 $146,600.27 $5,984.49 $152,584.76
Contract Total $469,428.77 $6,634.49 $0.00 $0.00 $476,063.26
CITY OF OSHKOSH
BY:
Recommended: City Mana.-
Director of Public Works City Clerk
Approved and accepted:
YOIA4 04,
Contractor
I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin,
under the within Change Order.
(;`6mptroller
Approved as iform:
Mi r\,41J
W City Attorn-•
CONTRACT: 13-06 CHANGE ORDER#1
SECTION I-PAVING
ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN
NUMBER DESCRIPTION UNIT CONTRACT CONTRACT
QUANTITY QUANTITIES INCREASE DECREASE PRICE
PRICE PRICE
1308 7"concrete pavement
removal and replacement,
including sawing,
pavement ties,integral
curb and grading,
terracing,and traffic
control,complete as Square
specified Yards 270 293.58 23.58 $43.00 $1,013.94
1318 8"concrete pavement
removal and replacement,
including sawing,
pavement ties,integral
curb and grading,
terracing,and traffic
control,complete as Square
specified Yards 40 850.00 810.00 $45.00 $36,450.00
1360 Adjust manholes and
inlets,complete as
specified Each 2 9.00 7.00 $200.00 $1,400.00
1370 Terrace work,complete as Square
specified Yards 200 4,089.66 3,889.66 $4.00 $15,558.64
1502 4"concrete sidewalk with
3"CABC and grading,
water department
locations,complete as Square
specified Feet 500 6,500.00 6,000.00 $6.00 $36,000.00
1510 6"concrete sidewalk,
driveway,or ramp with 3"
CABC and grading, Square
complete as specified Feet 700 1,100.00 400.00 $3.95 $1,580.00
1512 6"concrete sidewalk,
driveway,or ramp with 3"
CABC and grading,water
department locations, Square
complete as specified Feet 50 2,500.00 2,450.00 $6.30 $15,435.00
1550 No.4 reinforcing rods,
deformed,epoxy-coated, Linear
complete as specified Feet 500 1,609.00 1,109.00 $0.75 $831.75
1800 Base aggregate dense,'/.",
complete as specified Tons 150 314.27 164.27 $12.00 $1,971.24
1906 4"asphaltic pavement with
10"CABC and grading, Square
complete as specified Yards 75 1,200.00 1,125.00 $30.00 $33,750.00 _
SECTION I-(BID ITEMS 1110-1906)-SUB-TOTALS $143,990.57 $0.00
Page 1 of 2
•
CONTRACT: 13-06 CHANGE ORDER#1
ADDITIONAL WORK REQUIRED: C.O.#1 -SECTION I
INCREASE IN DECREASE IN
ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT CONTRACT CONTRACT
NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE
10000 Additional cost to hire Sub-
Contractor to pave asphalt
patches with a paver,due
to large increase in
quantity,complete as Square
specified Yards 0.00 521.94 521.94 $5.00 $2,609.70
ADDITIONAL WORK: C.O.#1 -(ITEM 10000)-SUB-TOTAL $2,609.70 $0.00
NET INCREASE TO: SECTION I $146,600.27
SECTION II-STORM SEWER
BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN
ITEM DESCRIPTION UNIT CONTRACT
NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE
2932 Furnish and install Class I,
Urban,Type A erosion
control mat,complete as Square
specified Yards 100 4,089.66 3,989.66 $1.50 $5,984.49
SECTION II-(BID ITEMS 2856&2932)-SUB-TOTALS $5,984.49 $0.00
NET INCREASE TO: SECTION II $5,984.49
NET INCREASE TO SECTIONS I&II $152,584.76
NET DECREASE TO SECTIONS I&II $0.00
NET INCREASE TO CONTRACT: $152,584.76
Page 2 of 2