Loading...
HomeMy WebLinkAboutPW CNT #12-11/CHG OR #2/PTS DEPARTMENT OF PUBLIC WORKS 215 Church Avenue P.O.Box 1130 Oshkosh,Wisconsin 54903-1130 Ph.(920)236-5065 OlHKOIH Fax(920)236-5068 ON THE WATER September 11, 2013 Mr. Steve Horn PTS Contractors, Inc. 4075 Eaton Road Green Bay, WI 54311-9340 Re: Change Order No. 2 Contract 12-11 Dear Mr. Horn: Enclosed is an executed copy of Change Order No. 2 between the City of Oshkosh and PTS Contractors, Inc. regarding the abovementioned project. If you have any questions, please call our office at (920)236-5065. Sincerely, C.- RtM-1-1-A- avid C. Patek, P.E. Director of Public Works DCP/tlt Enclosure: Change Order No. 2 cc: Pam Ubrig, City Clerk (w/original) Lynn Lorenson, City Attorney(w/copy) Peggy Steeno, Finance Director (w/copy) File (w/original) I.\Engineering\12-11 San MH Rehab-I&I Reduction Prog\Project_Information\Contract Info\Change Orders\12-11 Page 1 of 1 Executed CO#2 Ltr 9-11-13.docx TO: PTS Contractors, Inc. CHANGE ORDER#2 4075 Eaton Road DATED:August 21, 2013 Green Bay,WI 54311-9340 Your present contract with the City of Oshkosh, Contract No. 12-11, awarded October 23,2012, is hereby amended and changed as follows: NET INCREASE TO: SECTION I REPLACE SANITARY MANHOLES,SECTIONS,FRAMES,&LIDS $3,538.12 NET INCREASE TO: SECTION II SANITARY MANHOLE GROUTING(CONES AND WALLS) $30,240.10 NET INCREASE TO: SECTION III SANITARY MANHOLE GROUTING(BASE SECTIONS) $0.00 NET INCREASE TO: SECTION IV SANITARY MANHOLE&SEWER ABANDONMENT $40,341.49 NET INCREASE TO: SECTION V SANITARY MANHOLE STRUCTURAL CEMENTITIOUS LINER $0.00 NET INCREASE TO: SECTION VI STORM SEWER WORK ON KOELLER STREET $33,083.25 NET INCREASE TO CONTRACT $107,202.96 SECTION I SECTION II SECTION III SECTION IV SECTION V SECTION VI Totals Bid Total $790,037.42 $94,876.00 $12,512.50 $8,897.20 $4,882.50 $0.00 $911,205.62 C.O.#1 $5,293.62 $3,438.75 $0.00 $0.00 $0.00 $0.00 $8,732.37 Prev.Contract Total $795,331.04 $98,314.75 $12,512.50 $8,897.20 $4,882.50 $0.00 $919,937.99 C.O.#2 $3,538.12 $30,240.10 $0.00 $40,341.49 $0.00 $33,083.25 $107,202.96 Contract Total $798,869.16 $128,554.85 $12,512.50 $49,238.69 $4,882.50 $33,083.25 $1,027,140.95 CITY OF OSHKOSH BY: e:, ■. ( -d-Recommended: City Manager ,_ e_,-,j -4.14 Ai 1 ■,..- 1111/7 IAA I IN -4 Director of Public Works City C -r Ap ov d and accepted: Contractor I certify that provision has been made to pay the liability that will accrue to the City o Oshko , isconsin, under the within Change Order. .%41,',1/4- Yee7- 720 'o iptfoller Approved .k to form: 11111,4 itailiel 11 . _/ ' City Atto r- CONTRACT: 12-11 CHANGE ORDER#2 Amami oC tih loot' WAS no+ ihwAuac ona•he,4'a!•.1 °twokrTt O? SECTION I-Replace Sanitary Manholes,Sections,Frames and Lids C11°410_,Oa e v 41-2.. W I I net Pa.),4,11 c CHANGE ORDER#2: ADDITIONAL WORK REQUIRED A � }i� �`^OI C�'1Ae O�1 ..Qr• ITEM INCREASE IN DECREASE IN DESCRIPTION UNIT BID INSTALLED NET NET UNIT CONTRACT CONTRACT NUMBER QUANTITY QUANTITIES INCREASE DECREAS PRICE PRICE PRICE y// �`On4,minm4c �� (i cnil 4 / it I 1Q84 encountered on Sterling. ONS 0.00 57.41 57.41 $18.25 $1,047.73 Doweled pavement bars 1005 on S. Main St. 0.00 70.00 70.00 $11.55 $808.50 1006 Detectable Warning Field SF 0.00 8.00 8.00 $34.50 $276.00 Lateral Reconnect at MH 1007 03-491 T&M 0.00 1.00 1.00 $1,906.81 $1,906.81 Credit for use of Infi-shield 1009 External Chimney Seal 0.00 136.00 136.00 $10.00 $1,360.00 Excessive water in existing 1010 sanitary trench MH 14-139 T&M 0.00 1.00 1.00 $1,906.81 $1,906.81 SECTION I ADDITIONAL WORK SUB-TOTAL: $4,898.12 $1,360.00 NET INCREASE TO SECTION I: $3,538.12 SECTION II-Sanitary Manhole Grouting(Cones&Walls) CHANGE ORDER#2: BID ITEM ADJUSTMENTS INCREASE IN DECREASE IN ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT CONTRACT CONTRACT NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 201 Sanitary manhole grout, complete as specified Gallons 2,900 6,615.00 3,715.00 $8.14 $30,240.10 SECTION li BID ITEMS SUB-TOTAL: $30,240.10 $0.00 NET INCREASE TO SECTION II: $30,240.10 Page 1 of 3 CONTRACT: 12-11 CHANGE ORDER#2 SECTION IV-Sanitary Manhole&Sewer Abandonment CHANGE ORDER#2: BID ITEM ADJUSTMENTS INCREASE IN DECREASE IN ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT CONTRACT CONTRACT NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 3101 Furnish and install standard sanitary manhole (4'diameter)with sand Vertical slurry backfill Feet 11 85.42 74.42 $410.00 $30,512.20 3800 Abandon sanitary manhole,complete as specified Each 2 8.00 6.00 $780.00 $4,680.00 SECTION IV BID ITEMS SUB-TOTAL: $35,192.20 $0.00 CHANGE ORDER#2: ADDITIONAL WORK REQUIRED INCREASE IN DECREASE IN ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT CONTRACT CONTRACT NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 3815 Abandon 26"sanitary sewer,complete as Linear specified. Feet 0 463.90 463.90 $11.10 $5,149.29 SECTION IV ADDITIONAL WORK SUB-TOTAL: $5,149.29 $0.00 NET INCREASE TO SECTION IV: $40,341.49 Page 2 of 3 CONTRACT:12-11 CHANGE ORDER#2 SECTION VI-Koeller Street Storm Sewer CHANGE ORDER#2: ADDITIONAL WORK REQUIRED ITEM INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT BID INSTALLED NET NET UNIT CONTRACT CONTRACT QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 6000 Additional equipment, labor,and materials to install storm sewer on Koeller Street per Invoice 13-621-Koeller-1,dated 5/31/13,complete as Lump specified Sum 0.00 1.00 1.00 $6,269.16 $6,269.16 6001 Additional equipment, labor,and materials to install storm sewer on Koeller Street per Invoice 13-621-Koeller-2,dated 5/31/13,complete as Lump specified Sum 0.00 1.00 1.00 $7,766.42 $7,766.42 6002 Additional equipment, labor,and materials to install storm sewer on Koeller Street per Invoice 13-621-Koeller-3,dated 5/31/13,complete as Lump specified Sum 0.00 1.00 1.00 $2,963.07 $2,963.07 6003 Additional equipment, labor, and materials to install storm sewer on Koeller Street per Invoice 13-621-Koeller-4,dated 5/31/13,complete as Lump specified Sum 0.00 1.00 1.00 $6,682.93 $6,682.93 6004 Additional equipment, labor,and materials to install storm sewer on Koeller Street per Invoice 13-621-Koeller-5,dated 5/31/13,complete as Lump specified Sum 0.00 1.00 1.00 $4,413.62 $4,413.62 6005 Additional equipment, labor,and materials to install storm sewer on Koeller Street per Invoice 13-621-Koeller-6,dated 5/31/13, complete as Lump specified Sum 0.00 1.00 1.00 $4,988.05 $4,988.05 SECTION VI ADDITIONAL WORK SUB-TOTAL: $33,083.25 $0.00 NET INCREASE TO SECTION VI: $33,083.25 NET INCREASE TO SECTIONS I,II,III, IV,V,&VI: $108,562.96 NET DECREASE TO SECTIONS I, II,III,IV,V,&VI: $1,360.00 NET INCREASE TO CONTRACT: $107,202.96 Page 3 of 3