Loading...
HomeMy WebLinkAbout0157249-Plumbing � CITY OF OSHKOSH No 157249 OSHKOSH PLUMBING PERMIT -APPLICATION AND RECORD ON THE WATER Job Address 1529 W 6TH AVE Owner MARILYN BACKUS Create Date 08/16/2013 Contractor KOCH PLUMBING&HEATING INC Category 412-Res-Interior(New/Relocated Fixtures) Plan Inspector Jerry Fabisch Bathtub 1 Clothes Wshr 1 Classrm Sink 0 Surgeons Sink 0 Roof Drain 0 Deduct Meters 0 Shower 0 Lndry Tray 0 Exam Sink 0 Sterilizer 0 Soda Disp 0 Wtr Sewer Mtrs 0 � Whiripool 0 Sump Pump 0 F Prep Sink 0 RPZ Valve 0 Coffee Maker 0 Wtr Usage Mtrs 0 Lavatory 1 San Sump/Pump 0 Flr/Wst Sink 0 Bidet 0 Site Drain 0 Misc. p Toilet 1 Water Softner 0 Hand Sink 0 Urinal 0 Wait.St. 0 Fixtures Kit Sink 0 Standp Rec 0 Lab Sink 0 Beer Tap 0 Ice Chest p Disposal 0 Gar Drain 0 Plaster Sink 0 Dip Well 0 Comm Ice Maker 0 Dishwasher 0 Local Waste 0 Sculry Sink 0 Drink Ftn 0 Int Grease Trap 0 Floor Drain 0 Bar Sink 0 Serv Sink 0 Wash Ftn 0 Ext Grease Trap 0 Hose Bibb 0 Breakrm Sink 0 Shamp Sink 0 Catch Basin 0 Eye Wash Statn 0 Water Heater 0 Use/Nature SFR/interior plumbing associated with the remodel of bathroom of Work Size Material Type # Conn.Type Sanitary Sewer Storm Sewer Water Service Parcel Id# 0610830000 Valuation $4,000.00 Plan Approval $0.00 Permit Fees _ $36.00 ❑ Permit Voided I Issued By -�� Date 08/16/2013 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party,if you perform the work described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement holder(s)and to secure any necessary approvals before starting such activity. Signature Date AgenUOwner Address 2005 DOTY ST OSHKOSH WI 54902 -7040 Telephone Number 920-231-6661 or 235 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of Inspection (i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.