HomeMy WebLinkAboutPW CNT 85-01/CHG OR 6 Change Order No. 6 April 3, 1986 Contract No. 85-01 r Owner: City of Oshkosh Contractor: Centennial Contractors Corporation Engineer: Howard Needles Tarnrnen & Bergendof f Contract No. 85-01, SEWER INTERCEPTOR, is hereby amended and changed as follows: Additional cost to the Contract for removal of Rock necessary to install sewer interceptor. Rock was encountered along 8th St. from immediately west of the intersection of Iowa St. to the intersection of Oregon St. This Change Order tabulates the the total costs for all extra work associated with the rock. The amount of this Change Order is for the difference between the total costs attributable to the rock and the rock costs already approved and processed on Change Orders No. 2 and No. 5. Centennial Contractors Inc. hereby agrees that all claims associated with rock removal have been submitted and that no further claims associated with the rock will be submitted. Or i c i na l Amount of Contract $2, 215, 195. 00 Total Amount of Previous Change Orders to Date 408, 683. 48 Previous ,Adjusted Contract Amount $2, 623, 878. 48 Change Order No. 6 Amount $ 97, 600. 14 Total Amount of Current Contract Including C. O. No 6 $2, 721, 478. 62 RECOMMENDED: BY: _______ Director of Pu is Works City Manager «R _-_`--- __LteliZi (2, 2LieLle-a0) City Clerk A rove and Accepted Centennial Construction Corp. I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Appr -wed A T For • Cornptrol ier 0) 11 City Attcirne �r Change Order No. 6 Contract No. 85-01 - Sewer Interceptor Page 2 of Breakdown, of Total Costs Attributable to Rock. This breakdown includes the amounts previously included in Change Orders No. 2 and No. 5 which have been processed reflecting partial rock costs. Costs For a Drill Operator and Drill Rig Furnished By Centennial Contractors $30, 038. 00 Costs For Drill Rigs, Drill Operators, Blasters, and Blasting Equipment Furnished By Subcontractor, Don Lind $109, 096. 73 Generator And Pumping Costs Furnished By Centennial Contractor' s $33, 728. 72 Centennial Contractor' s Main Line Labor Costs $35, 828. 15 Centennial Contractor' s Mair, Line Equipment Costs (does not include trucking costs, generator or pump costs already tabulated) $103, 853. 87 Trucking Costs $51, 672. 07 Miscellaneous Costs $2, 076. 19 Extra Backfi l l Costs $65, 858. 09 Extra Bituminous Paving Costs due to increase in trench width as a result of blasting rock $12, 078. 60 Cold Weather Delays for Lateral Crew due to rock time extension $4, 833. 86 Cold Weather Delays for Mainline Crew due to rock time extension $15, 530. 76 Total Rock Costs $464, 597. 04 All of above Costs include OH&P Change Order No. 2 Costs Included In Above Amount $246, 406. 91 Change Order No. 5 Costs Included In Above Amount $120, 589. 99 Total Nos. 2 & 5 $366, 996. 90 Change Order No. 6 Amount $97, 600. 14 •