HomeMy WebLinkAbout0157172-Building (siding @ 1006) � CITY OF OSHKOSH No 157172
OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD
ON TNE WATER
Job Address 1004 OREGON ST Owner 1004/1006 OREGON STREET LLC Create Date 08/12/2013
Designer Contractor SCHWAB PROPERTIES
Inspector John Zarate
Category 042-Residential Siding Plan
Type � Building � Sign � Canopy � Fence 0 Raze i
Zoning C-3 Class of Const:
Size
Unfinished/Basement Sq.Ft. Rooms Height Ft. � Projection I
Finished/Living Sq.Ft. Bedrooms Stories Canopies
Garage Sq.Ft. Baths Signs
Foundation � Poured Concrete 0 Floating Slab � Pier � Other
� Concrete Block � Post � Treated Wood
Occupancy Pertnit Occupancy Fee _ $0.00 Flood Plain Height Permit
Park Dedication #Dwelling Units 0 #Structures 0
Use/Nature MULIT-FAMILY/siding at 1006 Oregon
of Work :
�'debit acct" i
I
�
HVAC Contractor Plumbing Contractor
Electric Contractor
Fees: Valuation $1,000.00 Plan Approval _ $0.00 Pertnit Fee Paid $37.00 Park Dedication $0.00
Issued By: �� Date 08/12/2013 Final/O.P. 00/00/0000
❑ Permit Voided! Parcel Id#0302140100
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement
holder(s)and to secure any necessary approvals before starting such activity.
I have read and understand he re en'one information.
Signature Date �' f � ( �
AgenUOwner
Address 601 OREGON ST STE B OSHKOSH WI 54902 - 5979 Telephone Number 379-5978
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of
Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone
Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.