Loading...
HomeMy WebLinkAbout0157185-Building (roof) � CITY OF OSHKOSH No 157185 OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD ON THE WATER Job Address 545 ALGOMA BLVD Owner SHOREWOOD RENTAL LLC Create Date 08/06/2013 Designer Contractor QUELLA BROTHERS CONSTRUCTION LLC Inspector John Zarate Category 041 -Residential Roofing Plan Type � Building � Sign � Canopy � Fence � Raze Zoning R-5 Class of Const: Size Unfinished/Basement Sq.Ft. Rooms Height Fk � Projection ! Finished/Living Sq.Ft. Bedrooms Stories Canopies Garage Sq.Ft. Baths Signs Foundation � Poured Concrete � Floating Slab 0 Pier � Other � Concrete Block 0 Post � Treated Wood Occupancy Pertnit Not Required Occupancy Fee $0.00 Flood Plain Height Permit Not Required Park Dedication Not Required #Dwelling Units 0 #Structures 0 Use/Nature Duple�Tear off and replace existing roofing on house only. No structural changes. of Work I i HVAC Contractor _ Plumbing Contractor ' Electric Contractor ' Fees: Valuation _ $16,000.00 Plan Approval $0.00 Permit Fee Paid $272.00 Park Dedication $0.00 Issued By: Date 08/12/2013 Final/O.P. 00/00/0000 ❑ Permit Voided� Parcel Id#0102950000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement holder(s)and to secure ny necessary rovals before starting such activity. I have read nd u d th�afore �nt information. Signature _ � Date � • � AgenUOwner Address 107 S 6TH ST HILBERT WI 54129 - 0000 Telephone Number 920-540-0656 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.