HomeMy WebLinkAbout0104337-Building (interior)OSHKOSH
ON THE WATER
.lob Address 728 730 WISCONSIN ST
Designer
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner EXCEL PROPERTIES LLC
Contractor READY BUILDERS INC
Category 140 - Interior Remodeling
No 104337
Create Date 09/22/2003
Plan
Type [(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze
Zoning Class of Const: 8 Size
Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection
Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies
Garage 0 Sq. Ft. Baths 0 Signs
Foundation O Poured Concrete (~) Floating Slab (~) Pier (~) Other
(~) Concrete Block (~) Post (~) Treated Wood
Occupancy Permit Required Flood Plain No Height Permit Not Required
Park Dedication Not Required # Dwelling Units 0 # Structures 0
Use/Nature
of Work
unit - Remove interior non-bearing walls in 2nd floor apt as per plan.
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By:
VAN ERT ELECTRIC
$2,000.00 Plan Approval $0.00
Plumbing Contractor
Permit Fee Paid
$25.00 Park Dedication $0.00
Date 09/22/2003 Final/O.P. 00/00/0000
Permit Voided
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address W2734 HOBSON RD WAUPACA WI 54981 - 9426 Telephone Number
233-0461
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.
OSHKOSH
ON THE WATER
Job Address 728 730 WISCONSIN ST
Designer
Category 140 - interior Remodeling
Type · Building C) sign
CITY OF OSHKOSH No 104337
BUILDING PERMIT - APPLICATION AND RECORD
Owner EXCEL PROPERTIES LLC Create Date 09/22/2003
Contractor READY BUILDERS INC
(~) Canopy (~ Fence (~) Raze
Plan
Zoning Class of Const: 8
Unfinished/Basement 0 Sq. Ft. Rooms 0
Finished/Living 0 Sq. Ft. Bedrooms 0
Garage 0 Sq. Ft. Baths 0
Foundation · Poured Concrete 0 Floating Slab (~ Pier (~) Other
(~ Concrete Block (~) Post 0 Treated Wood
Occupancy Permit Required Flood Plain No
Park Dedication Not Required # Dwelling Units 0
Height
Stories
0 Ft.
Size
[] ProjectionI
Canopies
Signs
Height Permit Not Required
# Structures 0
0
0
Use/Nature 4 unit - Remove interior non-bearing walls in 2nd floor apt as per plan.
of Work
HVAC Contractor
Plumbing Contractor
Electric Contractor VAN ERT ELEC~RIC
Fees: Valuation ~..~.00 Plan Approval
Issued By: ~,~~
$0.00 Permit Fee Paid
$25.00 Park Dedication $0.00
Date 09/22/2003 Final/O.P. 00/00/0000
[] Permit Voided
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this perrn~t/~plicatioa within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to ,e~'.~/a,r~c~'~aryapprevals before starting such activity.
Signature ~"/~"~'~' ~'~'"~ ~/~'" ~"~'"~'~/~;~ Date
~ ~.'~ Agent/Owner /" /
Address W2734 HOBSO~!~D WAUPACA WI 54981 - 9426 Telephone Number 233-0461
//
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.