HomeMy WebLinkAbout0157199-Plumbing � CITY OF OSHKOSH No 157199
OSHKOSH PLUMBING PERMIT -APPLICATION AND RECORD
ON THE WATER .
Job Address 1435 1437 MARICOPA DR Owner GLENN W/WENDY D REHA Create Date 08/13/2013
Contractor SALM PLUMBING Category 412-Res-Interior(New/Relocated Fixtures) Plan
Inspector Jerry Fabisch
Bathtub 0 Clothes Wshr _ 0 Classrm Sink 0 Surgeons Sink 0 Roof Drain 0 Deduct Meters 0
Shower 0 Lndry Tray 0 Exam Sink 0 Sterilizer 0 Soda Disp 0 Wtr Sewer Mtrs 0
Whirlpool 0 Sump Pump 0 F Prep Sink 0 RPZ Valve 0 Coffee Maker 0 Wtr Usage Mtrs 0
Lavatory 0 San Sump/Pump 0 FldWst Sink 0 Bidet 0 Site Drain 0 Misc. p
Toilet 0 Water Softner 0 Hand Sink 0 Urinal 0 Wait.St. � Fixtures
Kit Sink 1 Standp Rec 0 Lab Sink 0 Beer Tap 0 Ice Chest 0
Disposal 1 Gar Drain 0 Plaster Sink 0 Dip Well 0 Comm Ice Maker 0
Dishwasher 1 Local Waste 0 Sculry Sink 0 Drink Ftn 0 Int Grease Trap 0
Floor Drain 0 Bar Sink 0 Serv Sink 0 Wash Ftn 0 Ext Grease Trap 0
Hose Bibb 0 Breakrm Sink 0 Shamp Sink 0 Catch Basin 0 Eye Wash Statn 0
Water Heater 0
Use/Nature SFR/Unit 1437 interior plumbing associated with the remodel of kitchen
of Work
Size Material Type # Conn.Type
Sanitary Sewer
Storm Sewer
Water Service
Parcel Id#
1315100000
Valuation $1,000.00 Plan Approval $0.00 Permit Fees $30.00 ❑ Permit Voided i
Issued By � Date 08/13/2013
In the performance of this work, I agree to perForm all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party,if you perform the work
described in this permit application within an easement,the City strongly urges the permit applicant to contact the
easement holder(s)and to secure any necessary approvals before starting such activity.
Signature Date
AgenUOwner
Address 208 EAST NORTH ST APPLETON WI 54911 -0000 Telephone Number 920-716-1154
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of
Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone
Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.